ML20041D577
| ML20041D577 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 02/12/1982 |
| From: | Galen Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W CONNECTICUT YANKEE ATOMIC POWER CO. |
| Shared Package | |
| ML20041D578 | List: |
| References | |
| NUDOCS 8203050428 | |
| Download: ML20041D577 (2) | |
See also: IR 05000213/1982002
Text
C
c .2 - 2 J - E.)
.
,
FEB 121982
Docket No. 50-213
co
o>
Connecticut Yankee Atomic Power Company
c
4
ATTN: Mr. W. G. Counsil
Senior Vice President - Nuclear
g
RECEIVED
$
Engineering and Operations
gR04
-
-
{ "k
- ggg r
P. O. Box 270
-
12
Hartford, Connecticut 06101
Gentlemen:
y
f
Subject:
Inspection No. 50-213/82-02
4
N
_
This refers to the special inspection conducted by an NRC team on February
5-7, 1982 at your Haddam Neck Plant of emergency p eparedness activities
authorized by NRC License No. DPR-61 and to the discussions of our findings
held by Mr. Wojnas with you and members of your staff at the conclusion of the
inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
team members.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you (or
your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this of fice by telephone within ten (10)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within 25 days from the date of this letter a
written application to this office to withhold such information.
Consistent
with section 2.790(b)(1), any such application must be accompanied by an
affidavit executed by the owner of the information which identifies the document
or part sought to be withheld, and which contains a full statement of the
reasons on the basis which it is claimed that the information should be withheld
from public disclosure. This section further requires the statement to address
with specificity the considerations listed in 10 CFR 2.793(b)(4).
The
information sought to be withheld shall be incorporated as far as possible into
a separate part of the affidavit.
If we do not hear from you in this regard
within the specified periods noted above, the report will be placed in the
j
RI:DEPOS
R
S
R
EPOS
RI:DRPI
a hh
7 ll
,
,
0 FICIAL RECORD COPY
g4
8203050428 820219
h
l
PDR ADOCK 05000213
C
.
..
-
..
.
-
_
.-
.
.
4
,
FEB 121982
Northeast Utilities Service Company
2
.
i
Public Document Room. The telephone notification of your iatent to request
withholding, or any request for an extension of the 10 day period which you
believe necessary, should be made to the Supervisor, Files, Mail and Records,
,
USNRC Region I, at (215) 337-5223.
Sincerely,
,
WI inal 31 aod By:
E
C
.
George H. Smith, Director
Division of Emergency Preparedness
and Operational Support
Enclosure: NRC Region I Inspection Report No. 50-213/82-02
cc w/ encl:
i
R. Graves, Plant Superintendent
D. G. Died-ick, Manager of Quality Assurance
4
R. T. Laudei at, Manager, Generation Facilities Licensing
t
J. F. Opeka, Vice President, Nuclear Operations
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
State of Connecticut
NRC Resident Inspector
bec w/ encl:
Region I Docket Room (with concurrences)
Chief, Operational Support Section (w/o encl)
4
,
OFFICIAL RECORD COPY
!
i
l
4
f
'
,
---
-- -
,
~
- . .
- . . - . , ,
.,
,
- , - . - --