W FEB 17 Docket tio. 99900505/82-01 e
o>
(
CEWgy
- yg O g g, ',,., !
Ebasco Services, Inc.
I ATTil: Mr. B. E. Tenzer, Vice President Haterials Engineering and Quality Ct Assurance Two World Trade Center New York, NY 10048 co r %
Gentlemen:
This refers to the inspection conducted by Mr. J. R. Costello, of this office on January 11-15, 1982, of your facility at New York, flew York, and to the discussions of our findings with you and members of your staff at the conclusion of the inspection.
This inspection was made for two principal purposes:
(1) to assess the effectiveness of Ebasco's system for design verification by in-depth design reviews of specific safety-related systems on two active projects, Shearon Harris and Washington Nuclear Plants (WNP) 3 and 5; and (2) to verify com-pliance to design requirements of parallel slide gate valves procured by Ebasco from Atwood Morrill and fabricated by Hopkinsons Ltd. for use at UNP 3 and 5.
Areas examined during this inspection and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, we found no instance where you failed to meet the commitments of your Topical Report tio. ETR-1001 or !!RC require-ments.
In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of this letter and the enclosed inspection report will be placed in the flRC's Public Document Room.
If this report contains any information that you believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is neces-sary that you (a) notify this office by telephone within 10 days from the date of this letter of your intention to file a request for withholding; and (b) submit within 25 days from the date of this letter a written appli-cation to this office to withhold such information.
If your receipt of this letter has been delayed such that less than 7 days are available for RIV M
)
1 ft (
CI:RSS SC:RSS BC:VIB AD:IEQ6)1-RA JRCost 3110/rf CJHal e UPotapovs KVbeyIN1t iLotDins
[
yp{g2..... lj.y.j82...
q
...... jj.{8a..pj83...q/..
...... 1jej8g
~ ER 8???7,2 = H s
N 99900505 PDR FICIAL RECORD COPY
c Ebasco Services, Inc. your review, please notify this office promptly so that a new due date may be established. Consistent with Section 2.790(b)(1), any such application must be accompanied by an affidavit executed by the owner of the informa-tion which identifies the document or part sought to be withheld, and which contains a full statement of the reasons on the basis which it is claimed that the information should be withheld from public disclosure. This sec-tion further requires the statement to address with specificity the con-siderations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.
If we do not hear from you in this regard within the speci-fied periods noted above, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely, Oldis Potapovs, Chief Vendor Inspection Branch
Enclosures:
1.
Appendix A - Inspection Report No. 99900505/82-01 2.
Appendix B - Inspection Data Sheets (14 pages) bec:
IE Files NRC:PDR QAB AEOD REG Administrators I, II, III, IV, V KVSeyfrit, RIV
" " " ' " " ~"
'""C" OFFICIAL RECORD COPY