ML20041D325
| ML20041D325 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 03/03/1982 |
| From: | James Shea Office of Nuclear Reactor Regulation |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| References | |
| TASK-03-08.A, TASK-3-8.A, TASK-RR LSO5-82-03-015, LSO5-82-3-15, NUDOCS 8203050227 | |
| Download: ML20041D325 (4) | |
Text
-
March 3,1982 N
Docket tio. 50-245 N
LSOS-82-03-015
~,
9
, j, N'
{(~ -
p-
~[$$)
.sfy I
Hr. W. G. Counsil, Vice President
']
/
Nuc1 car Engineering and Operations t
Northeast lluclear Energy CoFpany
[/7
_ @ X 'x '
Post Office Box 270 0*
Hartford, Connecticut 06101
Dear Mr. Counsil:
SUBJECT:
SYSTEf tATIC EVALUATI0ft PROGRAM TOPIC III-8.A, LOOSE PARTS MotlITORIf!G AND CORE BARREL VIBRATIO!1 PROGRAM - IIILLST0i4E 1 Enclosed is a copy of our evaluation of Systematic Evaluation Program Topic III-8.A.
You are requested to exanine the facts upon which the staff has based its evaluation and respond either by confirming that the facts are cor-rect, or by identifying errors and supplying the corrected informtion.
' We encourage you to supply any other material that might affect the staff's evaluation of this topic or be significant in the integrated assessment of your facility.
The need to actually implerent a Loose Parts Monitoring Program will be deternined during the integrated safety assessnent.
Your response is requested within 30 days of receipt of this letter.
If no response is received by that time we will assume that you have no cor.nents or corrections.
Sincerely, ff 95u Mib a
-[v$
Ano' James J. Shea, Project Manager C,. 5 N(y mg Operating Reactors Branch Ho. 5 D. ?md s
Division of Licensing n:s no oo
Enclosure:
As stated E
cc w/ enclosure:
See next page m
% = +
p.e.e r. m p. a l. m.s 6....mn[Q.eu.k
. QRM 5.......
..SEea N.
.S ERB., //.
.SEEB.
. 0RBhkL... AD S ;DL,,,,
==>
a.Shea,h,
DCrgc,h,f,1,e,1 d,
,GL, as,,,,,
2!.?$82...... 26?U8?.......211WA2........$!.l.12.'.........}l.2d8?......].t18.82...
t unc ronu ais no-so> nacu o24o OFFICIAL RECORD COPY
/*
Mr. W. G. Counsils.
g CC William H. Cuddy, Esquire State of Connecticut Day, Berry & Howard Office of Policy & Management Counselors at Law ATTN: Under Secretary Energy One Constitution Plaza.
Division Hartford, Connecticut 06103 80 Washington Street Hartford, Connecticut 06115 Natural Resources Defense Council 917 15th Street, N. W Ronald C. Haynes, Regional
~
Washing ~ ton, D. C.
20005 Administrator Nuclear Regulatory Commission ATTN:
Superintendent Region 1 Office Northeast Nuclear Energy Company' 631 Park Avenue Millstone Plant King of Prussia, Pennsylvania 19406 P. O. Box,128 I'
Waterford, Connecticut 06385 Mr. Richard T. Laudenat Manager, Generation Facilities Licensing Northeast Utilities Service Company P. O. Box 270 Hartford, Connecticut 06101
~
Resident Inspector c/o V. S. NRC P. O. Box Drawer KK Niantic, Connecticut 06357 Waterford Public Library Rope Ferry Road, Route 156 Waterford, Connecticut 06385 First Selectman of the Tcwn of Waterford Hall of Records 200 Boston Post Road Wa.terford, Connecticut 06385 John F. Opeka -
Systems Superintendent Northeast Utilities Service Company P. O. Box 270 Hartford, Connecticut 06101 U. S. Environmental Protection Agency Region I Office ATTN: Regional Radiation Representative JFK Federal Building.
Boston, Massachusetts 02203
r-SYSTEMATIC EVALdATION' PROGRAM g
TOPIC lil-8.A MILLSTONE 1 TOPIC:
III-8. A, Loose Parts Monitoring and Core Barrel Vibration Program 1.
INTRODUCTION The purpose of this topic is to review the inservice surveillance program to detect loose parts and excessive motion of the main core support struc-
. tu re.
The objective is to detect loose. parts or excessive vibration be-fore they can cause flow blockage or mechanical damage to the. fuel or other safety related components.
.II.
REVIEW CRITERIA Standard Review Plan (SRP) Section 4.4, Regulatory Guide (R.G.) 1.133.
.s III.
RELATED SAFETY TOPICS AND INTERFACES V-1, Compliance With Codes and Standards (10 CFR 50.55a).
IV.
REVIEW GUIDELINES See Evaluation.
V.
EVALUATION 1.
LOOSE PARTS MONITORING:
R.G.1.133, " Loose-Part Detection Program for the Primary System of Light-Water-Cooled Reactors," Revision 2, describes features for monitoring loose parts within the reactor coolant pressure boundary (RCPB ).-
These features include sensors strategically located on the exterior surface of the RCPB capable of detecting acoustic dis-turbances, specifications for system sensitivity, alert levels, data acquisition modes and other system and procedural requirements.
Millstone 1 does.not have a loose parts monitoring program that meets the criteria of this guide.
2.
CORE BARREL VIBRATION:
This concern is only for plants built by Combustion Engineering and has been resolved generically.
r VI.
CONCLUSION 1.
A Loose Parts Monitoring Program, (i.e., detection system and proce-dures as specified in Section C.2 and C.3 of R.G.1.133, Rev.1) as currently required for new facilities does not exist
'<t Millstone 1.
2.
This issue is deleted for Millstone 1.
The need to actually implement a loose Parts Monitoring Propam will be deter-mined during the integrated assessment.
O O
9 5
0
. +
1 G
4 8
~
-