Public Version of Revision 9 to Emergency Plan Implementing Procedures Index Consisting of Temporary Mod Request T-6041 to Procedure 1300-08, Emergency Control Ctr Activation.
ML20041D160
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/02/1982
From:
TOLEDO EDISON CO.
To:
Shared Package
ML20041D158 List:
References
1300.08-01, 1300.08-1, NUDOCS 8203040404
Download: ML20041D160 (6)


Text

_ _ _

rf .

i; ,' .

L y

, THE TOLEDO EDISON COMPANY

, DAVIS-BESSE NUCLEAR POWER STATION g EMERGDiCY PLAN IMPLEMEITING PROCEDURES REVISION DIDEX l

p.

(~ -

" PAGE REVISION PROCEDURES REVISION TEGORARY MODIFICAT*:NS

i. O EI 1300.00 1 T-6014 EI 1300.01 2 T-6015

>. EI 1300.02 1 EI 1300.03 1 ,

~

EI 1300.04 1 1

EI 1300.05 EI 1300.06 2 EI 1300.07 1 T-6016 o EI 1300.08 2 T-5849, T-6041

, EI 1300.09 0 u

EI 1300.10 0 T-6017 3 EI 1300.11 0 T-6018 EI 1300.12 1 T-5850. T-5918 4

)

D

?

l b

l l

Revision 9 February, 1982 p" .

8203040404 020224 i PDR ADOCK 05000346 ,

U F PDR '

- - - - ~

, _ , - e .

OriuN A. Ramonsibl3 SSction Hmt Actlin

, 4d _ File Copy, Master File COPIES To BE MoDlFIED FoR IMMEDI ATE IMPLEMENTATION 2 - Shift Supervisor 2 - ECC m/ DAVIS-BESSE NUCLEAR POWER STATION . UNIT 1 1 - C6HP Supv.

'l EMPORARY MODIFICATION REQUEST 2 - Control Room ED m2o 1 - Emergency Planning SECTION 1 PHoCEDURE TITLE AND NUMBER El 1300.08 - Emergency Control Center Activation HEASoN Fon CH ANGE As identified during the annual Station Emergency Exercise, the set up and operability testing of RMT equipment located in the ECC was hampered by a lack of working space.

To alleviate this problem, the RMT Equipment Cabinets will be moved to the Radiological Testing Lab., which is located on the north end of the first floor of the Davis-Besse Administration Building, in close proximity to the ECC. The EDO will retain responsi-

.,ility for the direction of RMT's and equipment, as per this procedure (EI 1300.08).

CHANGE

  1. . On Page 2, Section 5.3.5 should read:

5.3.5 The EDO shall assign an individual (s) to set-up necessary emergency equip-ment (located in the Davis-Besse Administration Building Radiological Testing Lab.) as listed on Attachment 1.

On Page(s) 7, 8, 9. Equipment List, page headings should be changed to read as per the attached sheets. Equipment contained in these cabinets is identified by cabinet number (instead of cabinet location), and are located by page heading, as per attached sheets.

IS PROCEDURE REVISloN REQUIRED DATE PREPARED BY Ronald R. Durdel,. Emergency Planning ' y; x pki/[ /~ 2[o- 8 2 APPROVED 0Y

/ DATE /

~ ~~

/.AOAjt? -

_,. 3 f '/ / DATE / /

APPaoVED BY / /' -

/ J/x ,<cd, C.c /- 3 & 2 '

/~~ SUDMarTED BY (Section Head) DATE 1-23-82.

, ,f4 2 ,_ y

_/ RECoMMENDEC UY (SRU Chairenan) D AT E .

A&m 2/s/ a z- l QA APPRoVEf DY (Manager of ouelity Assuranca) DATE PPRoVED BY (Stat;on Super 6ntendenti DATE

.. Y a.fY1w~ g 2h/8t --

out -

L*

  • El 1300.08 7

DAVIS-BESSE ADMINISTRATION BUILDING RADIOLOGICAL TESTING LABORATORY EQUIPMENT LIST CABINET "1" Survey Equipment:

1 ca.

RM-14 HP 260 Probe and Power Cord 2 ea.

PRM-4A with HP 210 Probe 1 ca.

PIC-6A lon Chamber 2 ea.

PRM-7 Micro R-Meter Dosimeter Charger 1 ea.

5 ca.

Dosimeter 0-100R 5 ea.

Dosimeter 0-5R Dosimeter 0-500mR 25 ea.

25 ca.

TLD Check Source, CS-137 (~8pCi) 1 ca.

Air Sampler, DC 4 ca.

Batteries:

12-Volt 35-102 Booster 1 ca.

"D" Cell, ils Volt 12 ea.

9-Volt. 12 ca.

NEDA 220, 15 Volts for SK-1 Speakers 12 ea.

J* NEDA 15M, 1.4 Volt 2 ca.

"AA" Penlites 12 ea.

g Prestective Clothing Kits, Each Contain: 12 ca.

1 Pair Cloth Coveralls -

l Pair Rubber Shoecovers -

1 Cloth Hood -

1 Cloth Cap 1 Pair Cotton Liner 1 Fair Rubber Gloves

! 1 Pair Plastic Bootics 1 Full Face Respirator .

Masking Tape Other Protective Clothing:

Plastic Shoc Covers 30 ca.

Disposable Rubber Gloves' 2 Boxes Cotton Glove Liners 30 ea.

Paper Coveralls 30 pairs Miscellaneous:

Smears 2 Boxes Smear Folders 2 Boxes Plastic Bags, Swirl Pack l Tweezers -

1 Plastic Bags Assorted 1

Extension Cord -

Radiation Signu-and inserts Rope-l Attachment 1 Page 1 of 4

. -. ._ . _ _ . . , _ . - _ . . . __~___ ___- _ _ _ _ _ _ _ _ . - -. _ _

8 El 1300.03 DAVIS-BESSE ADMINISTRATION' BUILDING RADIOLOGICAL TESTING LABORATORY

'"5 EQUIPMENT LIST

CABINET "2" I 2 ca.

Ottawa County Maps 1 ea.

First Aid Kit 25 ca.

Data Sheet #1 for AD 1850.05 25 ca.

Data Sheet #1 for AD 1827.10 25 ca.

Data Sheet #2 for AD 1827.10 -

Stenographer Pads 1 ca.

Bottle of KI Tablets (Appro . 1000) 1 ca.

I. Ledger - ,

1 Pencils and Pens

  • Felt Tip Pen 30 ca.

Particulate Filter, 21s" 30 ca.

1 Silver Zeolite Cartridges ,

Duct Tape 12 ca.

Raincoats -

2 ca.

Radio 2 ca.

' Radio Charger 2 ca.

  • RMT Kit Off-Site 2 ca.

I *RMT Kit, On-Site .

j Scals 2 ca.

l SAM-2 Analyzers .

Onsite Radiation Monitoring Team Kit 1 ca.

PIC-6A Survey Meter 1 ca.

E-520 Survey Meter 2 ca.

Flashlight 2 ea.

Dosimeter 0-500 mrem 2 ca.

Dosimeter 0-1 Rem 2 ea.

TLD 25 ca.

i Smear Swipe NUCON *"*

i Tweezers "*

Planchet

  • Pencil 1 pad Note Paper
  • Bag-Plastic #*

Scrowdriver 1 set l

RMT Procedure, AD 1850.05 '

i I *Can be stored outside cabinet.

i l .

Attachment 1 Page 2 of 4 m '  %

. . _ - , - . , . , . . ~ . . .., _ , , , -~ _ - , . , , _ . . . _ . - ..._y, . , , . ,

= .

9 EI 1300.08 i

i DAVIS-BESSE ADMINISTRATION BUILDING RADIOLOGICAL TESTING LABORATORY s

EQUIPMENT LIST Offsite Radiation Monitoring Team Kit PRM-7 Micro R-Meter 1 en.

E 520 survey Meter 1 ca.

Flashlight 2 ca.

Dosimeter 0-500 mrem 2 ca.

TLD 2 ca.

Smear Swipe NUCON 25 ca.

Tweezer 2 ea.

20 ca.

! Coins (Dime)

I Planchet 10 ca.

Pencil 2 ea.

Note Paper 1 pad Eag-Plastic 5 ea.

Screwdriver 1 ca.

RMT Procedure, AD 1850.05 1 set 1 ca. l County Map - Ottawa ,

4 i

I 4

1 L

i-l i

Attachment 1 Page 3 of 4 i

i i

i f

1 4 4

... ._ _ _ _ . . . _ _ . _ _ _ _ . - _ _ _ _ _ _ _ _ _ _ . _ _. _ _ . ___-. . _ _ _ . .._ . . _ .. _ = __ _ _ _ .. .-_._ _ ._ _ __ _ _ _

I EI 1300.08 {

i DAVIS-BESSE ADMINISTRATION BUILDING  !

l-

- EMERGENCY CONTROL CENTER I

l EQUIPMENT LIST

. CABINET "1" i  !

)

TI 57 Calculator 1 ca.  !

l 1

TI 59 Calculator with Printer 1 ca.

j Extra Paper for Printer 1 P&ID Prints 2 sets l

  • Emergency Plan, Impicmenting Procedures and Supporting Procedures 2 sets  !
  • Air Bottle 2 ca.
  • Scott Air Pack 2 ca.

l I

  • Stretcher 1 ca.
  • ECC Assignment Board 1 ca. r
  • Map Board 1 ca.

I l  ;

l t i

i i  !

i, 1 s l

! i t

I i >

l l

  • Can be stored outside cabinet. ,

. i

! i l

l Attachment 1 Page! 4 of 4 i.

' , i l

e I

4

-+*s,--, --,------,,,---...----.-------,-4 . - - - - ww v-.- ,r-o-.m---.we,--c-- -.-.w.-,--e. - --.m---..w...----.- ,-,.-,*-n---*-.-.~cw