ML20041D116

From kanterella
Jump to navigation Jump to search
Public Version of Revision 9 to Emergency Plan Implementing Procedures Consisting of Temporary Mod Request T-6041 to Procedure 1300.08 Re Emergency Control Ctr Activation
ML20041D116
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/02/1982
From: Durdel R
TOLEDO EDISON CO.
To:
Shared Package
ML20041D104 List:
References
PROC-820202-01, NUDOCS 8203040298
Download: ML20041D116 (6)


Text

..

t

~

J O

THE ICLEDO EDISON CCMPAI,"I L

DAVIS-BESSE NUCLEAR POWER STATICN EMERGEiCY PLAN IMPLEMEiTISG PROCDURES

,, j

~-

Rr/ISION INDEX i.i

.2 PAGE REVISICN PROCEDURES REVISICN TEd20RARY MODIFICAT::NS i

1.,

O EI 1300.00 1

T-6014

~~

j EI 1300.01 2

T-6015 EI 1300.02 1

,'{

LJ EI 1200.03 1

il EI 1300.04 1

ii L.A 1

EI 1300.05 i1

'j EI 1300.06 2

EI 1300.07 1

T-6016 Ii EI 1200.08 2

T-5849, T-6041 EI 1300.09 0

EI 1300,10 0

T-6017

-j EI 1300.11 0

T-6018 EI 1300.12 1

T-5850, T-5918

~'

,i s

.J P

i w!

j l

[

f ",

I U

l Revision 9 q-February, 1982 f J py-v l

8203040298 820225 a.i : PDR ADOCK 05000346 F

PDR t

OS R12VTloN orisine. Responsible Section Head Action e

, p[

  • s:e Copy, Meme Piie COPIES TO SE MCOlFIE D FoR IMMEDI ATE IMPLEMENTATION DAVIS BESSE NUCLEAR POWER STATION. UNIT 1 2 - Shift Supervisor 2 - ECC TEMPOR ARY MODIFICATION REQUEST 2 - Control Room 1 - C&HP Supv.

1 - E=ergency Planning Eo ssra SECTION 1 3

~

PROCEDURE TITLE A*4D NUMBER EI 1300.08 - Emergency Control Center Activation As identified during the annual Station Emergency Exercise, the set up and operability RE ASoN F oR CHANGE testing of RMT equipment located in the ECC was hampered by a lack of working space.

the RMT Equipment Cabinets will be coved to the Radiological To alleviate this problem, floor of the Davis-Besse Testing Lab., which is located on the north end of the firstThe EDO will retain responsi-Administration Building, in close proximity to the ECC.

~~

bility for the direction of RMT's and equipment, as per this procedure (EI 1300.08).

.a r"

~

CHANGE On Page 2, Section 5.3.5 should read:

The EDO shall assign an individual (s) to set-up necessary emergency equip-5.3.5 (located in the Davis-Besse Administration Building Radiological ment Testing Lab.) as listed on Attachment 1.

page headings should be changed to read as per On Page(s) 7, 8, 9. Equipment List, Equipment contained in these cabinets is identified by cabinet the attached sheets.

number (instead of cabinet location), and are located by page heading, as per attached sheets.

  • J

~

IS PROCEDURE REVIStoN REQUIRED DATE

/-M - @ 2 PREPARED 6Y Ronald R. Durdel, Emergency Planning gn g.

e

/

D ATE

/

/

APPROVED BY

/'

//26/ C

/

( /s. w

/

,/

DATE

/

/

APPROVED BY /

[0

//

/

o== } f " E L O,

f

,,jh

/

DATE SU8MITTED BY (Section Head)

I~

~

?

.)

_f _ % _ -

-n f DATE RECoMMENDEO SY (SRS Chairman) 2./= / 3 2.

y jm & -7 DATE QA APPROVE D BY (Maneqer of Queitty Assurancel DATE PPRoVED SY (Stetton Svoerintendent) 2 Mat

6 i

El 1300.08 7

R DAVIS-BESSE ADMINISTRATION BUILDING

!~,c g RADIOLOGICAL TESTING LABORATORY f

EQUIPMENT LIST

' /

b 9

CABINET "1"

.J Survey Equipment:

1 ea.

RM-14 IIP 260 Probe and Power Cord n

2 ea.

PRM-4A with HP 210 Probe 1 ea.

PIC-6A Ion Chamber 2 ea.

?

PRM-7 Micro R-Meter 1 ea.

iJ Dosimeter Charger Dosimeter 0-100R 5 ca.

5 ea.

Dosimeter 0-SR

['

25 ea.

Dosimeter 0-500mR

[j 25 ea.

~

TLD 1 ea.

Check Source, CS-137 (-8pci) 4 ea.

r, f 1, Air Sampler DC Batteries:

1 ea.

f -*"

12-Volt 35-102 Booster 12 ea.

"D" Cell, ils Volt 12 ca.

l..:

9-Volt 12 ea.

NEDA 220, 15 Volts for SK-1 Speakers 2 ea.

  • r' NEDA 15M, 1.4 Volt 12 ea.

"AA" Penlites 12 ea.

Protective Clothing Kits, Each Contain:

1 Pair Cloth Coveralls

7.,

1 Pair Rubber Shoecovers

~

1 Cloth Hood

'~

1 Cloth Cap

~

1 Fair Cotton Liner l Pair Rubber Gloves J

1 Fair Plastic Booties

~~

1 Full Face Respirator Masking Tape Other Protective Clothing-30 ea.

Plastic Shoe Covers 2 Boxes Disposable Rubber Gloves 30 ea.

2 Cotton Glove Liners 30 pairs Paper Coveralls

^

P Miscellaneous:

2 Boxes Smears 2 Boxes J

Smear Folders Plastic Bags, Swirl Pack r'

Tweezers Plastic ~ Bags, Assorted 1

Extension Cord Radiation Signs and Inserts

'M,..

Rope

--)

,d

~ Artachment 1 hi Page 1 of 4 4

..__,__.___.m.

m.

c.

j f,

U 8

EI 1300.08 I

, DAVIS-BESSE ADMINISTRATION BUILDING RADIOLOGICAL TESTING LABORATORY i

EQUIPMENT LIST I

R.

[;'

CABINET "2" 2 ea.

Ottawa County Maps

.p 1 ea.

'l First Aid Kit 25 ea.

Data Sheet #1 for AD 1550.05 25 ea.

Data Sheet #1 for AD 1827.10 25 ea.

Data Sheet fi2 for AD 1827.10 Stenographer Pads

.; a Bottle of K1 Tablets (Approx. 1000) 1 ea.

1 ea.

q Ledger

,j Pencils and Pens Felt Tip Pen 1 ea.

30 ea.

Particulate Filter, 2k" m

30 ea.

l' Silver Zeolite Cartridger Duct Tape

~-

12 ea.

Raincoats 2 ea.

i Radio

}l 2 ea.

L Radio Charger 2 ea.

  • RMT Kit Off-Site 2 ea.

O-

  • RMT Kit. On-Site

~

I Seals 2 ea.

SAM-2 Analyzers

~

Onsite Radiation Monitoring Team Kit r ~

'.i 1 ca.

PIC-6A Survey Meter 1 ea.

E-520 survey Meter 2 ea.

! ~'

Flashlight 2 ea.

j Dosimeter 0-500 mrem 2 ea.

4 Dosimeter 0-1 Rem 2 ea, O

TLD 25 ea.

j Smear Swipe NUCON 1 ea.

Tweezers 10 ea.

Planchet m

2 ea.

L, Pencil 1 pad Note Paper 5 es.

Bag-Plastic

- 1 ea.

F-Screwdriver 1 set RMT Procedure, AD 1850.05

  • Can be stored outside cabinet.

3 t_4 m

c.1 Page 2 of 4

/^\\

?;

2 bse -

e7

_i.)

i.

-. ~ _ _.

-. =

. ~.

- L

,.e - 4 9

3.

L.$.

9 EI 1300.08 J m o;-.

DAVIS-BESSE ADMINISTRATION BUILDING

~~$' N j ]

I RADIOLOGICAL TESTING LABORATORY

.!,' M '

EQUIPMENT LIST 4

]6., '

Offsite Radiation Monitoring Team Kit i

bJ 1 ea.

PRM-7 Micro R-Meter 1 ea.

i

' q E 520 Survey Meter 1

2 ea.

j Flashlight 2 ea.

Dosimeter 0-500 mrem 2 ea..

TLD 25 ea.

I j

Smear Swipe NUCON 2 ea.

U Tweezer

~

20 ea.

i.

Coins (Dime)

~

10 ea.

i - G Planchet 2 ea.

d Pencil I

Note Paper 1 pad 5 ea.

q Bag-Plastic 1 ea.

I)

Screwdriver RMT Procedure. AD 1850.05 1 set 1 ea.

County Map - Ottawa t 1 i 'i L.,

r',e 1-s i

a i

6 F,

!*d m

i n

I.

i.

r. a

~

l.

u

. m.,

g w

i 6

I Page 3'of 4 l

?. -.,,..I j

' d.

l

. ' }.

v/

b*.

l I'

~~

~

EI 1300.08

[

DAVIS-BESSE ADMINISTRATION BUILDING EMERGENCY CONTROL CENTER

,r EQUIPMENT LIST

(,

CABINET "1"

.J 1 ea.

T1 57 Calculator 1 ea.

TI 59 Calculator with Printer

~'

Extra Paper for Printer 2 sets P&ID Prints

  • Emergency Plan, Implementing Procedures 2 sets and Supporting Procedures 2 ca.
  • Air Bottle 2 ea.
  • Scott Air Pack 1 ca.
  • Stretcher 1 ea.
  • ECC Assignment Board t"

1 ea.

  • Map Board i-

!.j

.c.

i t

is

  • Can be stored outside cabinet.

C F

.a

c.

Page 4 of 4 l7'

,g C

TW I.

s