Responds to NRC Re Violations Noted in IE Insp Repts 50-282/81-24 & 50-306/81-26.Corrective Actions: Increasing Classroom Review,Completing Assigned Reviews in Timely Manner & Verifying Review Reading
ML20041C781
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 02/12/1982
From: Dienhart A
NORTHERN STATES POWER CO.
To: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20041C775 List:
References
NUDOCS 8203020557
Download: ML20041C781 (3)


Text

Northern States Power Company

?

J__

414 NicoHet Mall D. E.Gillports Menneapolis, Minnesota 55401 senior vice President Telephone (612) 330-6071 Power supply February 12, 1982 Mr. C. E. Norelius, Director Division of Engineering and Technical Inspection Region III Office of Inspection and Enforcement U. - S. Nuclear RegulatoryCommission 799 Roosevelt Road Glen Ellyn, IL 60137

Dear Mr. Norelius:

PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 and 50-306 In response to your letter of January 13, 1982, which transmitted Inspection Reports No. 50-282/81-24 and 50-306/81-26, the following is offered:

Violation A letter from Northern States Power Company (NSP) to the NRC, dated August 1, 1980, which contains the NSP response to the March 28, 1980, letter from H. R. Denton to all licensees states in part, "This program shall ensure each licensed individual is cognizant of plant changes, modifications, and reportable occurrences..."

Contrary to the above, 12 licensed operators and senior operators failed to conduct assigned reviews of plant changes, procedure changes, or ap-plicable reportable occurrances. This occurred for required reviews covering the period from June to September 1981. Two individuals had five or more required reviews during this period for which no review has been documented.

e This is a Severity Level VI violation (Supplement I).

Response

Three actions will be taken:

1.

The number of assigned reviews will 'oe minimized by use of more fre-quent classroom reviews.

2.

Licensed personnel will be reminded of the importance of completing their assigned reviews in a timely manner.

3.

Periodically (monthly), a listing will be prepared of those required reviews which have not been returned. The individuals involved will be contacted.

I B203020557 820224 pggj6 Sk PDR ADOCK 05000282 O

PDR

a U S Nuclear Regulatory February 12, 1982 Commission Full compliance will be achieved with the completion of the above actions by March 1, 1982.

Yours truly, Arthur V Dienhart Vice President Plant Engineering and Construction for D E Gilberts Senior Vice President Power Supply cc: Mr G Charnoff Mr C D Feierabend l

l l

l UNITED STATES NUCLEAR REGULATORY COMMISSION NORTHERN STATES POWER COMPANY PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 and 50-306 LETTER DATED FEBRUARY 12, 1982 RESPONDING TO NRC LETTER DATED JANUARY 13, 1982 INSPECTION REPORTS NO. 50-282/81-24 and 50-306/81-26 Northern States Power Company, a Minnesota corporation, by this letter dated February 12, 1982, hereby submits in response to the NRC letter dated January 13, 1982, our answer to Inspection Reports No. 50-282/81-24 and 50-306/81-26.

This request contains no restricted or other defense information.

NORTHERN STATES POWER COMPANY By:

I A V Dienhart' l

Vice President Plant Engineering and Construction l

On this

/d day of.2[ha

, 19 U, before me a notary l

public in and for said County, personally / appeared A V Dienhart, Vice President, l

Plant Engineering and Construction, and being first duly sworn acknowledged that he is authorized to execute this document on behalf of Northern States Power i

Company, that he knows the contents thereof, and that to the best of his know-ledge, information and belief, the statements made in it are true and that it is not interposed for delay, l

(2d O..

/Zrt) f----::

.:.:: ::::. m I

BETTY J. DEAN I

3 pf*p%} Notany punue u NNtsorA }

.i M RA

} h/u,co. MO2Y COUNTY

.w ! apres Cec 16 19c1,

a. :a: w wm mx

__-