Forwards IE Insp Repts 50-348/82-01 & 50-364/82-01 on 820104-08.No Noncompliance Noted
ML20041C721
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 02/02/1982
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20041C722 List:
References
NUDOCS 8203020507
Download: ML20041C721 (2)


See also: IR 05000348/1982001

Text

,

.

_ - - - - - - - - - - - - -

Sw

-

.

.

'

FEB 0 21982

Alabama Power Company

N

k@O

ATTN:

Mr. R. P. Mcdonald

@

Vice President-Nuclear Generation

P. O. Box 2641

8

%'

Birmingham, AL 35291

tiECFO

-

Gentlemen:

-

pnol

1982> [

?

,

p r_, ,..

, 3 [-

Subject: Report No6348/82

nd50-364/82-01b))s"k

',

This refers to the routine safety inspection conducte

y'/ Mr.L Pi

Fredrickson

of this office on January 4-8,

1982, of activities authorized 1y NRC License

Nos. NPF-2 and NPF-8 for the Farley facility and to the discussion of our find-

ings held with Mr. J. D. Woodard, Assistant Plant Manager, at the conclusion of

the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

In accoidance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

M

Paul J. Kellogg, Chief

Reactor Projects Branch 2

Division of Resident and

Reactor Project Inspection

Enclosure:

See Page 2

8203020507 820202

PDR ADOCK 05000348

_-


.-

-

.

FE8 0 21982

Alabama Power Company

2

Enclosure:

Inspection Report Nos. 50-348/82-01

and 50-364/82-01

cc w/ encl:

W. O. Whitt, Executive Vice President

F. L. Clayton, Jr. , Senior Vice President

H. O. Thrash, General Manager-Nuclear Generation

0. D. Kingsley, Jr. , Manager, Nuclear Engineering

and Technical Services

J. W. McGowan, Manager-Safety Audit

and Engineering Review

W. C. Carr, Supervisor-Safety Audit

and Engineering Review

W. G. Hairston, III, Plant Manager

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Alabama

}gb

R

...

RII

RII

RII

06

a~

fIU

j):iv

gCEMurphy

JRogge

PJK

i

-

j

PE re ~rickson:ht

11

U right

9 ogg

1/J.Y82

If

82

16(\\/82

% /82

/82

!