ML20041C721
| ML20041C721 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 02/02/1982 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML20041C722 | List: |
| References | |
| NUDOCS 8203020507 | |
| Download: ML20041C721 (2) | |
See also: IR 05000348/1982001
Text
,
.
_ - - - - - - - - - - - - -
Sw
-
.
.
'
FEB 0 21982
Alabama Power Company
N
k@O
ATTN:
Mr. R. P. Mcdonald
@
Vice President-Nuclear Generation
P. O. Box 2641
8
%'
Birmingham, AL 35291
tiECFO
-
Gentlemen:
-
pnol
1982> [
?
,
p r_, ,..
, 3 [-
Subject: Report No6348/82
nd50-364/82-01b))s"k
',
This refers to the routine safety inspection conducte
y'/ Mr.L Pi
Fredrickson
of this office on January 4-8,
1982, of activities authorized 1y NRC License
Nos. NPF-2 and NPF-8 for the Farley facility and to the discussion of our find-
ings held with Mr. J. D. Woodard, Assistant Plant Manager, at the conclusion of
the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
In accoidance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written appli-
cation to withhold information contained therein within thirty days of the date
of this letter.
Such application must be consistent with the requirements of
2.790(b)(1).
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
M
Paul J. Kellogg, Chief
Reactor Projects Branch 2
Division of Resident and
Reactor Project Inspection
Enclosure:
See Page 2
8203020507 820202
PDR ADOCK 05000348
_-
.-
-
.
FE8 0 21982
Alabama Power Company
2
Enclosure:
Inspection Report Nos. 50-348/82-01
and 50-364/82-01
cc w/ encl:
W. O. Whitt, Executive Vice President
F. L. Clayton, Jr. , Senior Vice President
H. O. Thrash, General Manager-Nuclear Generation
0. D. Kingsley, Jr. , Manager, Nuclear Engineering
and Technical Services
J. W. McGowan, Manager-Safety Audit
and Engineering Review
W. C. Carr, Supervisor-Safety Audit
and Engineering Review
W. G. Hairston, III, Plant Manager
bcc w/ encl:
NRC Resident Inspector
Document Management Branch
State of Alabama
}gb
R
...
RII
RII
RII
06
a~
fIU
j):iv
gCEMurphy
JRogge
PJK
i
-
j
PE re ~rickson:ht
11
U right
9 ogg
1/J.Y82
If
82
16(\\/82
% /82
/82
!