Forwards IE Investigation Rept 50-373/80-46 on 800222-810923.No Noncompliance Noted
ML20041C671
Person / Time
Site: LaSalle 
Issue date: 02/02/1982
From: Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20041C672 List:
References
NUDOCS 8203020446
Download: ML20041C671 (2)


See also: IR 05000373/1980046

Text

r

.

.

FFR

2 1997

N

/

R:C$n ~

'

Docket No. 50-373

[

g O 1922s

-9

_,

u

Commonwealth Edison Company

fp Dr

ATTN:

Mr. Cordell Reed

7,

rpa

Vice President

/

'

Post Office Box 767

N

,,

Chicago, IL 60690

FG

Gentlemen:

This refers to the special investigation conducted by Messrs.

O. C. Shackleton, P. V. Joukoff, A. D'Angelo of the Region V office and

R. J. Kiessel of the Reactor Engineering Branch between February 22, 1980

and September 23, 1981, of activities at LaSalle County Nuclear Station,

Unit 1, authorized by NRC Construction Permit No. CPPR-99. Our findings

have been discussed with members of your staff at the conclusions of the

several inspections referenced in the report.

The enclosed copy of our investigation report identifies areas examined

during the investigation. Within these areas, the investigation consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this investigation. Other priority work has delayed issuance of

this report.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed investigation report will be placed in the

NRC's Public Document Room.

If this report contains any information that

you (or your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone

within ten (10) days from the date of this letter of your intention to file

a request for withholding; and (b) submit within twenty-five (25) days from

the date of this letter a written application to this office to withhold

such information.

If your receipt of this letter has been delayed such that

less than seven (7) days are available for your review, please notify this

office promptly so that a new due date may be established. Consistent with

Section 2.790(b)(1), any such application must be accompanied by an affidavit

executed by the owner of the information which identifies the document or

part sought to be withheld, and which contains a full statement of the reasons

which are the bases for the claim that the information should be withheld

from public disclosure. This section further requires the statement to

8203020446 820202

PDR ADOCK 05000373

G

PDR

I

Dn d b SII

.

.

FER

2 tW

Commonwealth Edison Company

-2-

address with specificity the considerations listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from

you in this regard within the specified periods noted above, a copy of

this letter and the enclosed investigation report will be placed in the

Public Document Room.

,

We will gladly discuss any questions you have concerning this investigation.

Sincerely,

R. F. Warnick, Director

Enforcement and Investigation Staff

Enclosure:

Investigation

Report No. 50-373/80-46

cc w/ encl:

Louis 0. DelGeorge, Director

of Nuclear Licensing

R. Cosato, Site Construction

Superintendent

T. E. Quaka, Quality

Assurance Supervisor

R. H. Holyoak, Station

Superintendent

i

B. B. Stephenson, Project Manager

DMB/ Document Control Desk (RIDS)

i

l

Resident Inspector, RIII

Mary Jo Murray, Office of

Assistant Attorney General

RI

RIIIA

co. .ris,

1/ U/c

l-27-E

/21 #1

.-

-

.

- - .

-.

.

..

-

-

. .-