| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 02/08/1982 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20041C556 | List: |
| References | |
| NUDOCS 8203020299 | |
| Download: ML20041C554 (2) | |
See also: IR 05000321/1982001
Text
_
_ _ _ _ _ _ - .
__
6
FEB 0 81982
Georgia Power Company
ATTN:
Mr. J. H. Miller, Jr.
pojMj ,
Executive Vice President
2
P. O. Box 4545
't19
Atlanta, GA 30302
0 2:, -
,y
s
V-
Gentlemen-
'-
IE/* l'
1982 > &
f a ww;. u.n
Subject: Report Nos. 50-321/82-01 and 50-366/82-01
"%'
[
' ' '
A
,,.
This refers to the special safety inspection conducted by SQwW,,Y,on'
this
office on January 12-15, 1982, of activities authorized by N
pd_df.f
License
No. DPR-57 and Licer.se No. NPF-5 for the Hatch facility and to the discussion of
our findings held with Mr. C. Jones, Assistant Plant Manager, at the conclusion
of the inspection.
Areas e,amined during the inspection and our finding's are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written appli-
cation to withhold information contained therein within thirty days of the date
of this letter.
Such application must be consistent with the requirements of
2.790(b)(1).
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
s/
F. J. Long, Acting Chief
Reactor Projects Branch 2
Division of Resident and
Reactor Project Inspection
Enclosure:
Inspection Report Nos. 50-321/82-01
and 50-366/82-01
cc w/ encl:
See Page 2
8203020299 820208
PDR ADOCK 05000321
$$Q{ '
t
Q
,
- - - - - - - - -
!
.
.
Georgia Power Company
2
FEB 0 81982
cc w/ encl:
J. T. Beckham, Vice President and
General Manager-Nuclear Generation
M. Manry, Plant Manager
C. E. Belflower, Site QA Supervisor
bcc w/ encl:
NRC Resident Inspector
Hugh S. Jordan, Executive Secretary
Document Management Branch
State of Georgia
pII
RII
RII
RII
RII
ydYo
Mg
&N
Gk
W
n
':ht
ARHgrdt
d'CEMyrphy
JRogge
FJLyo
7/ 4 /82
1/ 4/82
'1/ 1/82
t/g'/82
1's /82