Forwards IE Insp Rept 50-395/82-14 on 820125-28.No Noncompliance Noted
ML20041C522
Person / Time
Site: Summer 
Issue date: 02/08/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML20041C523 List:
References
NUDOCS 8203020169
Download: ML20041C522 (2)


See also: IR 05000395/1982014

Text

{{#Wiki_filter:[[ ~

FEB 0 81982 <~ /% N:. ' , ' ./ South Carolina Electric and Gas Company f [5

,,,

' , ATTN: Mr. T. C. Nichols, Jr. , Vice President [ U -- - Power Production and System Operations j 7?J

ggl7; " f(: P. O. Box 764 y m: Columbia, SC 29218 O < , , . , f ,, 5;;s Gentlemen: ' t -v / TrTyc[; \\ Subject: Report No. 50-395/82-14 This refers to the routine safety inspection conducted by Mr. J. J. Lenahan of this office on January 25-28, 1982, of activities authorized by NRC Construction Permit No. CPPR-94 for the V. C. Summer facility and to the discussion of our findings held with Mr. O. S. Bradham, Station Manager, at the conclusion of the inspection. Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspectors. Within the scope of this inspection, no violations or deviations were disclosed. We have examined actions you have taken with regard to previously reported unresolved items. The status of these items is discussed in the enclosed inspection report. One new unresolved item resulted from this inspection and is discussed in the enclosed report. This item will be examined during subsequent inspections. In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will be placed in the NRC's Public Document Room unless you notify this office, by telephone, within ten days of the date of this letter and submit written appli- cation to withhold information contained therein within thirty days of the date of this letter. Such application must be consistent with the requirements of 2.790(b)(1). 8203020169 820208 PDR ADOCK 05000395 i $Of r

. . South Carolina Electric and 2 FEB 0 81982 Gas Company Should you have any questions concerning this letter, we will be glad to discuss them with you. Sincerely, M F. J. Long, Acting Chief Reactor Projects Branch 2 Division of Resident and Reactor Project Inspection Enclosure: Inspection Report No. 50-395/82-14 cc w/ encl: J. B. Knotts, Jr. O. S. Bradham, Station Manager J. P. Harrison, Manager Nuclear Security C. A. Price, Manager, Nuclear Engineering A. A. Smith, Site QA Coordinator bec w/ enc 1: NRC Resident Inspector Document Management Branch State of South Carolina l l RII RIIj RIInbg RI RII RII fjkb Fe'( C4 p Q f Jdlenahan:ht TEConi n r CEMurphy J ogge VL rownlee FJ g 2/S /82 2/ '/82 2/g /82 2/g/82 2/$ /82 2/ /82 3 i I }}