FEB 0 51982
South Carolina Electric'and Gas Company
o
/'?
N
ATTN:
Mr. T. C Nichols, Jr. , Vice President
Power P -duction and System Operations
8
C
P. O. Box 764
RECEIVED' 'L
p}
f M R 1
-
Columbia, SC 29218
19825 lT
'
Gentlemen:
R
ntmime.mr $
t:mu gp :a .
q,
Subject: Report No. 50-395/82-09
3
Ah
't>
g6\\
- ~i Ji .1 r , J r . ,
This refers to the' routine safety inspection conducted by Mr. W
M
of this office on January 19-22, 1982, of activities authorized by RC Construc-
tion Permit No. CPPR-94 for the Summer facility and to the discussion of our
findings held with Mr. W. A. Williams, Jr., General Manager - Nuclear Operations
at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
'
l
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
,
l-
'
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written appli-
cation to withhold information contained therein within thirty days of the date
of this letter.
Such application must be consistent with the requirements of
2.790(b)(1).
Should you have any questions concer tiing this letter, we will be glad to discuss
them with you.
Sincerely,
Paul J. Kellogg, Chief
Reactor Projects Branch 2
Division of Resident and
Reactor Project Inspection
Enclosure:
See Page 2
850302d156 020205
~
~
'
PDR ADOCK 05000395
G O (ss /,
e
G
. - _ -
o///
>
<
\\
FEB 051982
.e
'
,
South Carolina Electric and
2
Gas Company
Enclosure:
Inspection Report No. 50-395/82-09
cc w/ encl:
J. B. Knotts, Jr.
O. S. Bradham, Station Manager
J. P. Harrison, Manager Nuclear
Security
C. A. Price, Manager, Nuclear
Engineering
A. A. Smith, Site QA Coordinator
bcc w/ encl:
NRC Resident Inspector
Document Management Branch
State of South Carolina
Victor Benaroya, NRR/CEB
l
I'/
h
bj&
RII
-
RII
RII
RII
RIT
"
WHMiller:ht
T Conlon
hCEMurphy
VBrownlee .
P.-
-
g
)/}/82
$/f,/82
Q/h/82
/3 /82}/h3$& /82
,
-