r 4
m::vi m
(.,
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION gg g ATOMIC SAFETY AND LICENSING BOARD La Before Administrative Judges:
Q, Hugh K. Clark, Chairman Dr. George A. Ferguson Dr. Oscar H. Paris SERVED MAR 11982 In the Matter of
)
)
ILLINOIS POWER COMPANY, ET AL.)
Docket No. 50-461 OL
)
(Clinton Power Station,
)
,,g Unit No. 1)
)
February 26 9S 4
S, g
O
- ;OEWED PROTECTIVE ORDER
.1 gg1 1982P Ntyy?$0?' Q L,.
ucc
~
y The Nuclear Regulatory Commission (NRC) hereby orders atsthe disco'v
~ j ig\\ \\ v ery by Intervenor Prairie Alliance (Intervenor) of Illinois Power ompany (Illinois Power) documents identified in the attached Exhibit A, and of Illinois Power documents relating to Contention 9, be subject to the following terms and conditions:
ORDERED l
l l
1.
That no information discovered by Intervenor from such documents Shall be communicated to any person or entity not a party to this proceed-ing, nor to any of Intervenor's personnel, agents, consultants, or attor-neys not actively participating in this proceeding, except as necessary i
s
, I 8203020060 820226 PDR ADOCK 05000461 0
e o
2 in connection with Intervenor's preparation for this proceeding or with the prior written consent of Illinois Power, or upon order of this Board.
2.
That information discovered from such documents shall be subject to such further disclosure or further protection from disclosure as this Board may order, upon petition from any party and for good cause shown.
FOR THE ATOMIC SAFETY AND LICENSING BOARD Mi N\\
Oscar H. Paris ADMINISTRATIVE JUDGE For:
Hugh K. C1 ark, Chairman ADMINISTRATIVE JUDGE Bethesda, Maryland February 26, 1982 1
1
[,
EXHIBIT A B.W.R. Owner's Group Document Control No.
Subject 304 BWR Owner's Group Emergency Procedure Guidelines, Rev.1, and Responses to Related NRC Questions 500 The Executive Status Report, July 1980 501 The Executive Status Report, August 1980 502 Utility /NRC Epecutive Meeting on BWR OG SRV Testing, October 22, 1980 (Conference Report) 503 November 19-20, General Meeting Voting Issues (BWR OG) 504 NUREG-0737 Tasks II.K.3.15 "HPCI/RCIC Break Detection" and II.K.3. 21 "CS, LPCI Restart" 505 BWR OG Special Meeting on SRV Performance Testing, November 6, 1980 506 BWR OG Executive Status Report, November 1980 507 BWR OG Control Room Committee, February 3 & 4, 1981 508 BWR OG Executive Summary Report, J,anuary 1981 509 Control Room Committee Meeting Notice for April 14
& 15, 1981 510 BWR OG Emergency Procedures Committee Meeting, February 24, 25 & 26, 1981 511 BWR OG Working Group on Displays, Meeting Minutes -
April 29 & 30, 1981 512 BWR OG Participants for Preliminary Assessment of Control Room CRT Displays 514 BWR Control Room Graphic Display System Evaluation Program 600 NUREG-0578 Inplementation and Transmittal of Miscellaneous Items 604 Utility Review of BWR OG Approach on NUREG-0660 Item II.K.3.44 607 BWR OG Executive Status Report, October 1980 634 Emergency Response Information System Conceptual Design and Contrcl Room Committee Meeting with the NRC 700 BWR OG Control Room Modification Subcommittee Meeting 701 BWR OG General Meeting Agenda 702 Travelplan Information to BWR OG Control Room Survey Program Workshop 703 BWR OG Control Room Subcommittee Notice of Meeting Change of Place 704 BWR OG Conference Reports on Control Room Committee Meetings 705 BWR OG Control Room Modification Subcchmittee Meeting and the NSAC 706 TMI-Accepted Proposals 707 BWR OG Executive Status Report, February 1981
_a
,I:
,4 B.W.R. Owner's Group Document Control No.
Subject l
708 EOF & TSC Information Systems Preliminary Functional Specifications to BWR OG Control Room Committee Members 709 BWR OG Control Room Committee, March 10 & 11, 1981 l
Conference Report l
710 BWR OG Executive Status Report, March 1981 l
711 BWR OG Control Room Modification Subcommittee, Denver Meeting Notes l
712 BWR OG Executive Status Report, May 1981 l
713 BWR OG Control Room Modification Subcommittee, NSAR/Palo Alto 5/30/80 Meeting Notes 714 BWR OG Executive Status Report, May 1981 l
715 NRC/BWR OG FS",rol Room Committee Meeting Notes j
802 BWR OG Conty Room Workshop /CP & NTOL Members j
803 ANS/ Human Factors Review of BWR Control Rooms General Electric, Sentry Corporation, Technology For Energy Corporation, and i
Sargent and Lundy Documents 403 Adjustment to TEC Proposal (Item 402) l 404 Correspondence and Adjustments to TEC Proposal (Item 402) 405 Intent Letter for Purchase of TEC Safety Relief Valve Monitoring System 515 Emergency Response Information System, GE Quotation 601 PASS Design Documentation 610 Post Accident Sampling Workshop Report 611 PASS, Sentry Proposal 615 Sentry PASS Proposal Adjustment 616 Sentry Letter of Clarification 619 PASS Proposal Evaluations 620 PASS, Sentry QA Acceptance t
623 PASS, Sentry QA Acceptability 624 PASS Trip Report i
625 PASS, Sentry QA Acceptability l
626 PASS, Sentry QA Acceptability 627 GE BWR Assessment after TMI 629 PASS Authorization 633 PASS Design Changes 636 PASS, Letter of Clarification 637 PASS, Status Telecon 640 S&L TMI Issues Responses
.