Informs That No Technical Problem Is Created by Delay in Preoperational Tests Discussed in Util 811106-1224 Ltrs. Condition Re Conduct of Work Activities During Fuel Load & Initial Startup Will Be Included in Facility License
ML20041C411
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 02/09/1982
From: Tedesco R
Office of Nuclear Reactor Regulation
To: Delgeorge L
COMMONWEALTH EDISON CO.
References
NUDOCS 8203010294
Download: ML20041C411 (3)


Text

.

FEr 9 1982 t

DISTRIBUTION:

' Docket: File; bcc: TERA LB#2 File NSIC DEisenhut/RPurple NRC PDR I

, @hSO /

RTedesco L PDR y'

%,/

\\

ASchwencer ACRS(16)

' Docket Nos.=50-373i-7 ABournia and 50-374

. ii. D D

EHylton y

2 Fi? 3 1982b '-._

Woodhead, OELD OI&E myr u tw=-

Region III Mr. Louis 0. Delceorge

" iii* "

\\

Resident Inspector Director of Nuclear Licensing V

SHanauer 3"/gg RMattson Commonwecith Edison Company HThompson Post Office Box 767 Chicago, Illinois 60690 RVollmer RHartfield, MPA

Dear Mr. DelGeorge:

SUBJECT:

DELAY OF PREOPERATIONAL TESTS AT LASALLE In your letter of November 6,1981, you requested NRC approval for the delay of several preoperational tests until the startup test phase of operation. In addition, your letter of December 24, 1981 responded to some of our concerns in this area. As a result of our review of these two submittals, we have concluded that there is no technical problem caused by the delay of the preoperational tests listed in your letter as long as they are completed prior to entry into the conditions listed.

However, due to the extra workload on the testing and operations staff caused by performing preoperational tests during startup operations and to the fact that the technical specifications on administrative controls were not intended to cover such a situation, we conclude that extra precautions should be taken during the period in questien to assure that an adequate number of personnel are on duty to handle the workload at any given time.

Therefore, we plan to include the following condition in the LaSalle Unit I license:

j Conduct of Work Activities during Fuel Load and Initial Startup The licensee shall review by committee all Unit 1 construction Pre-l operational Testing, and System Demonstration activities performed l

concurrently with Unit 1 initial fuel loading or with the Unit 1 Startup Test Program to assure that the activity will not affect the safe per-formance of the Unit 1 fuel loading or the portion of the Unit 1 Startup Program being performed. The review shall address, as a minimum, system l

8203010294 820209 PDR ADOCK 05000373 A

FDR OFFICs >

sunmAue >

orre )

unc ronu ais oo-eq ucu mo OFFICIAL. RECORD COPY usam mi-33m

Mr. Louis 0. DelGeorge interaction, span of control, staffing, security and health physics, with respect to perfomance of the activity concurrently with the Unit 1 fuel loading or the portion of the Unit 1 Startup Program being performed.

The committee for the review shall be composed of at least three members, knowledgeable in the above areas, and who meet the qualifications for professional-technical personnel specified by Section 4.4 of ANSI N18.7-1971.

At least one of these three shall be a senior member of the Assistant Superintendent of Operation's staff.

Sincerely, Robert L. Tedesco Assistant Director for Licensing Division of Licensing cc: See next page A!

D.U@ f 2g,M,..

DL,.,gt,BG,,,

,D.

/,k,,

or,,cr >

SURNAMEh 2,/,,$........

2gj,/82 2,t t.,;(,82,,

/,82,,,,,

om, OFFICIAL RECORD COPY usammi.-auq sac rosu ais oo col uncu oaa

/S~~

~

Mr. Lcuis- 0. De1 George Director of Nuclear Licensing Commonwealth Edison Company P. O. Box 767 Chicago, Illinois 60690 cc: