ML20041C261
| ML20041C261 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 02/04/1982 |
| From: | Varga S Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML17341A908 | List: |
| References | |
| NUDOCS 8202260421 | |
| Download: ML20041C261 (5) | |
Text
,
/
UNITED STATES NUCLEAR REGULATORY COMMISSION g
WASHINGTON, D. C. 20655 r.
y
\\,***.*/
FLORIDA POWER AND LIGHT COMPANY DOCKET NO. 50-250 TURKEY POIN1~ PLANT UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE r
ce No bPR-31 1.
The Nuclear Regulatory Comission (the Commission) has found that:
e A.
The application for amendment by Florida Power and L;ght Company (the licensee) dated December 10, 1981, as supplemented on January 20 and 28,1982, complies with the standards and requirements of the Atomic En?rgy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth l
in 10 CFR Chapter I; B.
The facility will cperate in conformity with the application, i
the provisions of.the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can ba conducted without endangering the health and safety of the public, and (ii) that such activities will be
~
conducted in compliance with the Comission's regulations;
{
4 D.
The issuance of this amendment will not be inimical to the comon defense and security or to'the health and safety of the public; l
and t
E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Cormnission's regulations and all applicable requirements have been satisfied.
1 i
P I
i 6
l 8202260421 G20207 l
PDR ADOCK 05000250 P
~
e 2
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.3 of Facility Operating License No. OPR-31 is hereby amended to read as follows:
(S) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 76, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCL RF TORY C0ffilSSION 4- ~
Ol.I s s'
seven. Varga, hief Operating Reactors Bra
- 1 Division of Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance: February 4,1982 O
9 i
l
l 2
UNITED STATES j
.f {,
NUCLEAR REGULATORY COMMISSION j
\\p*.o/.g WASHINGTON, D. C. 20555 a
.. /
FLORIDA POWER AND LIGHT COMPANY DOCKET NO. 50-251 TURKEY POINT PLANT UNIT NO. 4 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 70 License No. OPR 41 i
1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Florida Power and Light Company (the licensee) dated December 10, 1981, as supplemented i
on January 20 and 28,1982, complies with the standards and
[
requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Connissi,on's rules and regulations set forth i
in 10 CFR Chapter I, B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized l
by this snendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to'the health and safety of the public; i
and E.
The issuance of this snendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
l I
I E
i 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.8 of Facility Operating License No. OPR-41 is hereby amended to read as follows:
(B) Technical Soecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 70, are hereby incorporated in the license. The licensee shall o*erate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
F R THE NUC ~
GULATORY COMMISSION arga C e Operating Reactors anch #1 Division of Licensi
Attachment:
Changes to the Technical Specifications Date of Issuance:
February 4, 1S82
ATTACHMENT TO LICENSE AMENDMENTS AMENDMENT NO. 76 TO FACILITY OPERATING LICENSE NO. DPR-31 AMENDMENT NO. 70 TO FACILITY OPERATING LICENSE NO. DjR-41 DOCKET NOS. 50-250 AND 50-251 Revise Appendix A as follows:
Remove Page Insert Page 3.1-2 3.1-2 i
I l
}
'i i
I I
L1
l ll!.
l!
2.
PRESSURE-TEMPERATURE LIMITS g
l The Reactor Coolant System (except for the pressurizer) pressure and i
temperature shall be limited during heatup, cooldown, criticality (except for l ow' power physics tests),
and inservice leak and j
hydrostatic testing in accordance with the limit lines shown on Figures 3.1-la through 3.1-lb.
Allowable pressure-temperature ccmbinations are
'i BELOW AND TO THE RIGHT of the lines on the Figures.
Heatup and j
cocidowr rate limits are:
a.
A maximum heatup rate of 100*F in any one hour.
?
b.
A maximum cooldown rate of 100*F in any one hour.
L j
c.
A maximum temperature change of >_ 5*F in any one hour during hydrostatic testing operation above system design pressure.
g The pressurizer pressure and temperature shall be limited.in accordance with the following:
d.
The pressurizer shall be limited to a maximum haatup rate of 100 *F in any one hour, and a maximum ccoldown rate of 200 'F in any one i
hour.
i e.
The pressurizer shall be limited to a maximum Reactor Coolant System spray water temperature dif.ferential of 320'F.
With any of the above limits exceeded, restore the temperature and/or pressure within the limits within 30. minutes, determine that the RCS or
}
pressurizer remains acceptable for continued operations or, if at powei, be in at least Hot Shutdown within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Cold I
Shutdown within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
i With reactor power less than 70 percerit Rated Thermal power, the moderator temperature coefficient
- shall not be core positive than +5 x 10-6 AX/K/0F I
When this condition is not met, the reactor shall be made subcritical by an amount equal to or greater than the potential reactivity inserti:;.. Jue L
to depressurization and cooldown.
With reactoi power greater than or equal to 70 percent Rated Thermal Power.
the moderator temperature coeffieicient shall. not be more positive than 0 AX/K/0F. When this condition is not met, the reactor shall be made subcritical by an amount equal to or greater than the' potential reactivity insertion due to depressurization and cooldown.
- These moderator temperature coefficient conditions do not apply to low power physics tests.
3.1-2 Amendment. Nos. 76 & 70
.. -.....