Informs That 811211 Submittals Re Qa/Qc Programs & Constructor Qualification Are Acceptable.Date for Providing Addl Info Re Selected Constructor Requested
ML20041C245
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 02/12/1982
From: Tedesco R
Office of Nuclear Reactor Regulation
To: Oprea G
HOUSTON LIGHTING & POWER CO.
References
NUDOCS 8202260396
Download: ML20041C245 (3)


Text

"

~~j 3

y y

y y

DISTRIBUTION:

O Docket File 50-498/4,49 LPDR FEB 121982 f4yC TERA s'q/

LB#3 Files g

Mr. G. W. Oprea, Jr.

RTedesco N

Executive Vice President F. iiiraglia p

q..,
y..

C.

Houston Lighting and Power Co'mpany DSells Qs

)'

P. O. Box 1700 OELD AV 2 4,

?

l Houston, Texas 77001 WHaass v-JZwolinski h

/' !

  • A/

Dear Mr. Oprea:

6

Subject:

QA/QC 'rograms and ' Contractor Qualification DM

References:

(1) Letter from J. Goldberg to R. L. Tedesco dated December 11, 1981, transmitting Transition QA Program for the South Texas Project.

(2) Letter froni J. Goldberg to R. L. Tedesco dated December ll,1931, transmitting Revised QA Program for Design and Construction Phase of the South Texas, Project.

(3) Letter froni J. Goldberg to R. L. Tedesco dated December 11, 1931, transmitting Bechtel Qualifications Sumary.

The NRC staff has reviewed th'e above referenced documents and finds them acceptable for use in the transition phase and the design and construction

' phase.

Since these submittals do not' include the qualifications and QA/QC program of the still to be selected constructor, final staff approval is deferred until receipt of additional information relative to the selected constructor.

Please provide us with a date when you expect to make such infomation available.

If you have any questions, contact the Project Manager, D. Sells (301) 492-7100.

Sincerely, Original signed by g~obod; L' 7'd**

8202260396 820212 PDR ADOCK 05000498 Robert L. Tedesco, Assistant Director A

PDR for Licensing O

Division of Licensing 7'

cc: See next page.

,7 p g

f

,7

,[

AL. Rg G.

H

.v l

=co. a t. d...

...ot

  1. 2 oELD

,y

"""> DE '

idb.,

..F

.,9,11 a,,

,,8 g,

Hpa:

d..

gJZwol. ins.ki.

..RL,desc,o bly,)]c,g,(h

...k....

./ E 2 2

/

2//0/82 2M M

^

Om) 2/. %. /.82..... ?.Q./. 8.2.....

2

/82

.q..

gp

...... g.......

l

+....

NRCFORM 318 810 80l NRCM O240 OFFICIAL RECORD COPY

' " '88 - 29 e24

-.- - -~.

~.---

C

    • 'N pm Rf cy,

/

o UNITED STATES l

I'.?

'g NUCLEAR REGULATORY COMMISSION ni-WASHING TON, D. C. 20555 s,. _ f NO I 2 Jggp C

Mr. G. W. Oprea, Jr.

Executive Vice President 4

Houston Lighting and Power Company P. O. Box 1700 Houston, Texas 77001

Dear Mr. Oprea:

Subject:

QA/QC Programs and Contractor Qualification

References:

(1)

Letter.from J. Goldberg to R. L. Tedesco dated

, ~

December 11, 1981, transmitting Transition QA Program for the South Texas Project.

(2) Letter from J. Goldberg to R. L. Tedesco dated December 11, 1981, transmitting Revised QA Program for Design and Construction Phase of the South Texas Project.

(3)

Letter from J. Goldberg to R. L. Tedesco dated December 11, 1981, transmitting Bechtel Qualifications Summary.

The NRC staff has reviewed the above referenced documents and finds them acceptable for use in the transition phase and the design and construction phase.

Since these submittals do not include the qualifications and QA/QC program of the still to be selected constructor, final staff approval is deferred until receipt of additional information relative to the selected constructor.

Please provide us with a date when you expect to make such information available.

If you have any questions, contact the Project Manager, D. Sells (301) 492-7100.

Sincerely, Y

W' Robert L. Tedesco, Assistant Director for Licensing Division of Licensing cc: See next page.

.s.v.a.

^

SN"'*"

  • N^--

' - ^ ^" " * " " " - " - ' * "- ^~ " ' ~^'

I SOUTH TEJAS Mr. G. W. Oprea, Jr.

Mrs. Peggy Buchorn Executive Vice President Executive Director Houston Lighting and Power Company Citizens for Equitable Utilities, Inc.

P. O. Box 1700 Route 1, Box 1684 Houston, Texas 77001 Brazoria, Texas 77422 Mr. J. H. Goldberg William S. Jordan, III Esq.

Vice President - Nuclear Engineering Harmon & Weiss

& Construction 1725 I Street, N.W.

Houston Lighting and Power Company Suite 506 P. O. Box 1700 Washington, D.C.

20006 Houston, Texas 77001 Mr. D. G. Barker Brian Berwick, Esq.

s Manager, South Texas Project Assistant Attorney General Houston Lighting and Power Company Environmental Protection Division i

P. O. Box 1700 P. O. Box 12548 Houston, Texas 77001 Capitol Station Austin, Texas 78711 Mr. M. L. Borchelt Central Power and Light Company Hilliam M. Hill P. O. Box 2121 Resident Inspector / South Texas Project Corpus Christi, Texas 78403 c/o U. S. NRC P. O. Box 910 Mr. R. L. Hancock Bay City, Texas 77414 City of Austin Electric Utility Department i

P. O. Box 1088 Austin, Texas 78767 Mr. J. B. Poston Mr. Lanny Sinkin Assistant General Manager for Operations Pat Coy City Public. Service Board Citizens Concerned About Nuclear Power P. O. Box 1771 5106 Case Oro San Antonio, Texas 78296 San Antonio, Texas 78233 Jack R. Newman, Esq.

Mr. Cloin Robertson townstein, Newman, Axelrad & Toll Manager, Nuclear Licensing 1025 Connecticut Avenue, N.W.

Houston Lighting and Power Company Washington, D. C.

20036 P. O. Box 1700 Houston, Texas 77001 Melbert Schwarz, Jr., Esq.

Baker & Botts Charles Halligan One Shell Plaza Bechtel Power Corporation Houston, Texas 77002 P. O. Box 2166 Mr. E. A. Saltarelli

- Brown & Root, Inc.

P. O. Box 3 Houston, Texas 77001 t

+m-,

a s,o m s

~,6

=~

e s ee e-

+-me s

- m e-s

-...ee.-

  • --o,--ooe.s w. m

. = -

Sn.

a