- i. ik%
?f7 % '}
w Cth
- 0 ecc M
o-w iG CiTdCG February 19, 1982 g
- 3F-0282-14 tr
.FEB 2 51982-83 Aud cucir:ssas File: 3-0-3-a-3 N78
/
3-E-3 g
s Mr. John F. Stolz, Chief
_.g_?
Operating Reactor Branch #4 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Adequacy of Station Electric Distribution System Voltage
Dear Mr. Stolz:
The attached two tables of voltage values are submitted to further demonstrate adequacy of the Crystal River Unit 3 Electrical Distribution System.
The information was requested in telephone conversation with your Mr. Syd Miner when he reviewed our December 30, 1981, letter on the same subject.
These attached tables convert the potential transformer readings taken during testing to voltage readings for the Emergency Safeguards Bus switchgear and motor control centers and the 230 KV grid.
Very truly yours, S J 6.
A David G. Mardis Acting Manager Nuclear Licensing Attachments WRK:mm cc:
Mr. J. P. O'Reilly, Regional Administre.;r
,J 0
)
Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission h gg g 101 Marietta Street, Suite 3100 Atlanta. GA 30303 c202260278 820219 e
PDR ADOCK 05000302 P
pyg General Office 320i tn.itveunn street soutn P O. Box 14042, st. Petersburg. Florida 33733 813-866-5151
X i'
CR.1 & 2 START-UP TRANSFORMER I
4 BUS CALCULATED YOLTAGES
-MEASURED VALUES PLANT AT FULL LOAD - STEADY FROM TABLE 5* - STEADY STATE -
STATE CONDITIONS MAX SYSTEM CONDITIONS PER UNIT VALUE NUMERICAL NUMERICAL -
4000, 460, 230K VALUE VALUE BASE 230 KV GRID 1.0591 243.6 KV 244.8 KV 4160 V SWGR ES BUS 3A 1.0504 4202 V 4256 V ES BUS 3B 1.0504 4202 V 4256 V 480 V SWGR ES BUS 3A 1.03513 476 Y 480 Y
.ES BUS 3B 1.04035 479 V 483 Y MCC 480 V ES 3Al 1.03513 476 V
,478 Y 3A2 1.03513 476 V 477 Y 3AB 1.03513 476 V 476 V ES 381 1.04035 479 Y 480 V 3B2 1.04035 479 Y 480 V
- Table 5 in FPC letter from Patsy Y. Baynard to Mr. Robert Reid, " Adequacy of Station Electrical Distribution System Voltages", dated December 22, 1980.
i
\\
i Castleberry(2/10)C2-3
\\, '
+
l f
f
o.
I*
CR-3 START-UP TRANSFORMIR BUS CALCULATED VOLTAGES MEASURED VALUES PLANT AT FULL LOAD - STEADY FROM TABLE 9* - STEADY STATE -
STATE CONDITIONS MAX SYSTEM CONDITIONS PER UNIT VALUE NUMERICAL NUMERICAL 4000, 460, 230K VALUE
.VALUE BASE 230 KV GRID 1.0591 243.6 KV 244.8 KV 4160 Y SWGR ES BUS 3A 1.06912 4276 Y 4183 V ES BUS 38 1.06912 4276 V 4179 Y 480 V SWGR ES BUS 3A 1.06226 489 Y 472 V ES BUS 3B 1.06330 489 Y 475 V MCC 480 V ES 3Al 1.06226 489 Y 469.V 3A2 1.06226 489 Y 468 Y 3AB 1.06226 489 V 468 Y ES 381 1.06330 489 Y 472 Y 382 1.06330 489 Y 471 Y
- Table 9 in FPC letter from Patsy Y. Baynard to Mr. Robert Reid, " Adequacy of Station Electrical Distribution System Voltages," dated December 22, 1980.
l l
Castleberry(2/10)C2-3 l
l
. -.