Requests Commitment to Either Include Diesel Generator Fuel Oil within QA Program or to Propose Tech Spec Change to Include Requirements for Sampling & Analysis of Diesel Oil. Commitment Schedule Requested within 14 Days
ML20041C047
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/09/1982
From: Stolz J
Office of Nuclear Reactor Regulation
To: Crouse R
TOLEDO EDISON CO.
References
NUDOCS 8202260085
Download: ML20041C047 (1)


Text

,.

Mr C

FEBRUARY 09W DISTRIBUTION:

'l PDR H0rnstein Docket File.

TERA EBlackwood NRC PDR NSIC-0 ELD

'5,

{

Docket No. 50-346 ORB #4 Rdg AE0D g.

s DEisenhut IE-3 g

Q, y

RIngram ACRS-10 g

-(TAC #12615)--ADe Agazio Gray File kj K

r Mr. Richard P. Crouse GVissing 2

k

','6h

-j

{

l

. Vice President, Nuclear

'L--

~

~~

Toledo Edison Cogany g

.[

. Edison Plaza - Stop 712 g

x

-300 Madison Avenue E

Toledo, Ohio i.3652

\\

y

Dear Mr. Crouse:

SUBJECT:

DIESEL GENERATOR FUEL OIL - QUALITY ASSURANCE REQUIREMEt1TS

References:

(1) NRC letter dated January 7,1980, To All Power Reactor I

~~

Licensees (2) Toledo Edison Company letter No. '611 dated April 18, 1980

[

(3) NRC' letter dated March 31, 1981 1

In Reference (1), the NRC requested that you include diesel generator fuel within your Quality Assurance Pmgram. Toledo Fdison Company responded to this request in Reference (2) by identifying the examination. procedures followed by your plant personnel with respect to the acceptance of diesel

. fuel at the facility. Other periodic examinations were also identified.

l Toledo Edison Company concluded that the system of inspections in place l

obviates the need to include diesel generator fuel or Regulatory Guide i'

1.137 in the Quality Assurance Program.

In Reference (3), the NRC requested that Toledo Edison Company either l

comply with -the position stated in Reference (1) or propose a Technical

[

Specification change to include requirements for sampling and analysis of diesel oil.in accordance with ASTM specifications periodically for each Diesel Generator Fuel Oil Storage Tank and also prior to transfer of fuel oil into these tanks.

A reply to Reference (3) was mquested by mid-May 1981. We have not yet received either your comitment to the posicion of Reference (1) or pro-posed Technical Specification changes.

Please provide, within 14 days of receipt of this letter, your schedule for resolution of this matter.

Sincerely.

  • 0RIGI3AL S10N2D BY J0m4 F. SIOLZ8 John F. Stolz, Chief Operating Reactors Branch #4 '

-Division of Licensing i

ORB #4:DL C-0 #4:DL.

cerice)...... ee....see. neset,. page.....

..ADe...A a.g...JSto suamme >....................

................. g.

2

'7 8202260085 820109 n E^"

' C

" = "?1"

-