DISTRIBUTION:
JAN28 #
Docket Nos. 50-329/330 OM, OL LB #4 r/f N
Docket !:os: 50-329 OM, CL o
DEisenhut and 50-330 OM, OL (b
EAdensam DHood bcc:
TERA RECEIVED 9
MDuncan NRC POR Mr. J. W. Cook p.
L SHanauer Local PDR FEstl RTedesco NSIC Vice President
Jackson, Michigan 49201
//
RMattson RHartfield, MPA s'
OELD
Dear Mr. Cook:
OIE (3)
Subject:
Staff Review Schedules for Soils Remedial Actions for Midland Plant, Units 1 and 2 On Decenter 9,1931, menebers of HRC's licensing staf f net in Bethesda, Maryland, with Messrs. D. Uudzik and R. Houston of your company to develop a schedule for the NRC's review of remedial actions for soil compaction problems at the Midland Plant site.
The objective was to develop a detailed licensing schedule consistent with issuance of the Safety Evaluation Nport for the operating licenses by May 6, 1982, which is a key milestone for achieving the fuel load date of July 1983 and operating date of Deceaber 1983 for Unit 2.
The schedule was developed consistent with Consumers' specified order of ic.portance on issues and consistent with Consumers' targeted construction start dates for the several renedial activities. lists the principal action ite.cs and target dates developed for lead technical review branches. Enclosure 2 identifies the san.e schedule identified by major structure or system. Suggested hearing dates for the recaining sessiens of the instant ON-GL hearing were also identified (Enclosure 3).
It is readily apparent that this scnedale is highly conpressed, particularly con-sidering that act.ivities on several fronts are occurring in tander.i, that the recedial actions are coJplex and outside the usual scope of construction activities for nuclear power plants, and considering the complex interactions acong the various construction activities. For our part, we have recently completed several retssignacnts and an additional contract to gain additional resources and are pre-pared to support this schedule.
Despite the efforts of the NRC, however, achieve-r.ent of such a review schedule will not be possible without your full cooperation and timely submittal of coaplete and acceptable inforaation.
Similarly, the com-pressed hearing schedules sug';ested by Enclosure 3 will only be possible if sub-stantial resolution of issues has been achieved prior to start of each hearing session.
omeo 8202250441 820128 PDR ADOCK 05000329
" " " " * " " " ~
A PDR q
e ac rosu ais tio-soi sacu o24o OFFICIAL RECORD COPY usa mi-3sm
l 1
i i
tir. J. W. Cook l We request that our licensing project manager be advised promptly if any changes j
to these schedules is identified. Althcugh the flexibility afforded by this schedule is soaewhat limited, mutually agreed to changes such as meeting dates
]
would be acceptable if made to enhance resolution of issues, expedite the hearing j
or othensise enhance safety.
I Sincerely, Original signed by j
Robert L Tedeseo Robert L. Tedesco, Assistant Director i
for Licensing l
Division of Licensing
Enclosures:
As stated i
cc:
See next page l
i 4
s i
I i
l s
L
...... :.ta atstaa...; nata.aa...... ? 'f.at.....
e
/
o,,,m,...et.tt a..s...
...owoodihe.1
....iarcan.......sgosa.....4
.oR,..o s,eo....
...u.Mi.az.............u.ki.az.........up.aa.........u.e a....
.................l................
o,,,,
t NRC FORM 318 (10-80) NRCM'024o OFFiClAL RECORD COPY usa ini muo
ENCLOSURE 1 SEC Action Iten:s Actual Co @letion 12/14-17/81 1.
Hearing on Dynamic Models Dec 14-16, 1981 01/04/82 2.
CPCo Draft Submittal on Cracking Dec 13 3.
Holiday Dec 25 4.
Holiday Jan 01,1982 5.
Sutanittal of BWST Tank Stress Report Jan OS 6.
Meeting on Cracking Jan 11 7.
Meeting on CWST Ring Foundation and Dynamic Model and Hearing Conditions for Resetting BWST Jan 13 8.
NRC Generic Resolution on Cracking Jan 15 9.
CPCo Submittal on FIVP Cracking Jan 16
- 10. Audit Prior to Excavation Under FIVP dnd Turbha Building - Ann Arbor Jan 16-19
- 12. NRC Audit prior to Excavation Under Aux Bldg and Aux Bldg Cracking - Ann Arbor Feb 01-05
- 13. Testinony due of LWST Ring Foundation and Dynaade Model Feb 01
- 14. IIRC Resolution on Excavation Under FIVP and Turbine aldg Feb OS
- 15. NRC Resolution on FIVP Cracking Feb 08
- 16. CPCo submittal on DGB Cracks Feb 03
- 17. Meeting on SWPS Feb 11
- 19. Holiday Feb 15 l
20 Meeting on all Aspects of LGS Feb 23-24
- 21. NRC nueting and Resolution on Hearing Conditions for ShPS Mar 01
- 22. CPCo Submittal on SWPS Creaking Mar 01
- 23. NRC Resolution of all Aspects of DGb Mar 02
- 24. HRC Resolution of Excavation Under Aux Bldg Mar 03 l
- 25. NRC Resolution of Aux Bldg Cracking Mar 15
- 26. NRC Audit on SWPS Design Mar 15-19
- 27. Testimony due on all Aspects of DGB Mar 15
- 28. Testia.ony due on Hearing Conditions for SWPS Mar 15 29.
HRC Resolution on SWPS Cracking Mar 26
- 30. Hearing on DGb. SWPS, a Permanent Deuatering Mar 29 - Apr U2
- 31. HRC Resolution on SWPS Reaudial Work Apr 09
- 32. Audit of Aux Bldg Underpinning Final Design Af ter May 17
- 33. Resolution on resetting BWST May 01 omcc) sunuaue)
DATE )
sac ronu aia 00-80) nacu cao OFFIClAL RECORD COPY usceo. i9si-333-eco
f HGEB Action Items 1.
llearing - Dynamic Model Dec 14-16, 1981 2.
1101iday Dec 25 3.
iloliday Jan 01,1982 4.
Submittal on BWST Tank Stresses Jan 08 5.
Meeting on Concrete Cracks Jan 11 4
6.
Meeting on BWST Reacdial Work Jan 13 7.
Submittal of eff ects of Freeze Wall Jan 15 (Advanced Jan 07) 8.
NRC Resolution on BWST Corings Jan 15 H
9.
NRC Resolution on Permanent Dewatering criterion on Water Table Level Jan 15
- 10. NRC Resolution on Underground Piping including Seismic Design Jan 18
- 11. Audit of CPCo prior to Excavating Under FIVP & Turbine Building Jan 18-19 H 12. Meeting on Freeze Wall - Ann Arbor Jan 20
- 13. Meeting on Underground Piping Jan 21
- 14. liRC Resolution on BWST Foundation Ring Jan 25
- 15. NRC Resolution on Activation of Freeze 1
l Wall Jan 25
- 16. NRC Audit prior to Excavation Under Aux Bldg and Aux Bldg Cracks Feb 01-05
- 17. NRC Resolution on Aux Bldg Borings Feb 01
- 18. Testimony Duc on BWST Ring Foundation and seismic model Feb 01
- 19. Testimony Due on all Aspects of Underground Piping and Fuel 011 Tanks Feb 02
- 20. Hearing on Undergroung Piping, BNST, and QA Plan Feb 06-19
- 21. NRC Resolution on Excavation Under F1VP and Turbine Bldg Feb 08 i
- 22. CPCo Submittal on DGS Cracks Feb 08
- 23. Meeting on SbPS Feb 11
- 24. CPCo Submittal on Partial Recharge Test Results Feb 15
- 25. NRC Resolution on SWPS Borings Feb 15
- 26. Iloliday Feb 15 11 27. Meeting on Partial Recharge Test Results Feb 18
- 28. Meeting on all Aspects of DGB Feb 23-24
- 29. Meeting and NRC Resolution on Hearing Conditions for SWPS Mar 01
- 30. NRC Resolution on all Aspects of DGB Mar 02 H 31. NRC Resolution on Partial Results on Recharge Test Mar 03
- 32. NRC Resolution on Excavation Under Aux Bldg Mar 08
- 33. NRC Audit on Final SWPS Design Mar 15-19
- 34. Testimony due on SWPS Borings, SUPS Hearing Conditions, and all Aspects of DGB Mar 15 11 35. Testimony due on Permanent Dewatering System Mar 15
- 36. NRC Resolution on SWPS Cracking Mar 26
- 37. Ilearing on DGD, SWPS, & Peraunent Dewatering Har 29 - Apr 02 h 3s.
A C K avi m ivu n a s i. vi av.G iiu.mdioi vu OFFICE)..................k.I. I(....................
................b.I.. ).h.....................
M
- tin......g Tank BW iT
~
May J1
- 39. Resol ition on Rese suauwe >
"' A '*"Trydf40'1Tc' Mct f6H"""*""
- NRC FORM 318 (10-80) NRCM 0243 OFFiClAL RECORD COPY use.co: mi-oss.ea
t f
e L
HEB Action Iter.s 1
Actual 5
t 1.
CPCo Submittal on Underground Piping Dec 21, 1931 12/18/81 (delivered) 2.
Hecting on Underground Piping Jan 21,1982 i
3.
HRC Resolution on Underground Piping Jan 25 1
4.
Testimony due on Underground Piping Feb 02 5.
Hearing on Underground Piping Feb 16-19 t
t
!i 1
Region III/QAB Action Items 1.
CPCo QA Plan Submittal Jan 04 01/08/82 2.
Meeting on QA Organization Chage Region II Jan 12 l
3.
Testimony on QA Organization Change (File)
Jan 19 I
4.
HRC Resolution and Meeting on QA Plan Jan 25 I
S.
Testimony due on QA Plan Feb 01 6.
Hearing on QA Organization Change Feb 02-05 l
l 7.
Hearing on QA Plan Feb 16-19 i
l
+
l.
l P
l l
t l
i I
I
..............i OFFICE) suaumab
?
I care) nac ronu sta cio-soi nneu ano OFFICIAL RECORD COPY usagoani-m-m !
l d s, c l u 5 s e
- E AUXILIARY BUILDING g FIVP 6 cA -
1.
Hearing on dynamic model December 14-18, 1981
- SEB, HGEB*
2.
CPCo submittal of effects of freeze wall
-Debr 1981 HGEB
/ ~ 7
'# f "I
3.
CPCo draft generic submittal on cracks December 18, 1981 SEB l 3 z '
4.
Generic meeting on cracks January 11, 1982 SEB 5.
NRC generic resolution on cracks January 15, 1982 SEB 6.
CPCo submittal on FIVP cracks January 15, 1982 SEB 7.
Audit prior to excavatica under
- SEB, Turbine Bldg. and FIVP January 18, 1982 HGEB 8.
Meeting on Freeze Wall January 20, 1982 HGEB 9.
NRC resolution on activation of Freeze Wall January 25, 1982 HGEB l'V d s-10.
NRC audit of-prin to excavation under Aux. Bldg. including crack review February 1-5, 1982
- HGEB, SEB ac 11.
NRC resolution of Aux. Bldg. borings February 1, 1982 HBEd 12.
NRC resoltuion on excavation under FIVP
- HGEB, and Turbine Bldg.
February 8, 1982 SEB 13.
NRC resolution on FIVP cracks February 8, 1982 SEB 14.
NRC resolution on excavation under Aux. Bldg. March 8, 1982
- HGEB, SEB 15.
Audit of Aux. Bldg. final After May 17, 1982 SEB underpinning design l'
HGEB - GES except where otherwise noted
-H Common with SWP Structure E IGB b
m
< ^.ys
..:--An-
- A.
se
-.5
.c
SERVICE WATER PUMP STRUCTURES (SWPS) 4 ct.
1.
Hearing on Dynamic Model December 14-18, 1981 SEB,HGEB A
2.
CPCo generic draft submittal on cracks December 18, 1981 SEB l i 3.
Meeting on generic cracks January 11, 1982 SEB, HGEB 4.
Meeting on SWPS reports (feedback)
February 11, 1982 SEB, HGEB 5.
NRC resolution on SWPS borings I
February 15, 1982 HGEB 6.
Meeting & NRC resolution on hearing conditions March 1, 1982 SEP 7.
CPCo submittal on SWPS cracks March 1, 1982 SEB 8.
NRC audit on final SWPS design March 15-19,1982 SEB, HGEB 9.
Testimony due on hearing conditions March 15, 1982 SEB, HGEB 10.
Testimony due on SWPS borings March 15, 1982 HGEB 11.
NRC resolution on SWPS cracks March 26, 1982 SEB, HGEB 12.
Haring March 29-April 2, 1982 SEB, HGEB 13.
Resolution on remedial underpinning (Audit Conclusion)
April 9, 1982 SEB, HGEB A
Common with Aux. Bldg., and DGB t
r I
F 4
G I
l
/
I UNDERGROUND PIPING AND DIESEL FUEL OIL TANKS i
l i
1.
CPCO submittal Dece u r 21, 1981 MEB, HGEB I
2.
Meeting on submittal January 12, 1982 MEB, HGEB i
3.
NRC resolution including seismic analysis January 18, 1982 MEB, HGEB l
i 84. Testimony due January 25, 1982 MEB, HGEB l
5.
Hearing February 15-19, 1982 MEB, HGEB
[
i I
i I
t I
l t
1 l
l l
I O
hM4 '
BORATED WATER STORAGE TANVS (BWST) 1.
Hearing on dynamic model December 14-18, 1982 SEB, HGEB 2.
Meeting on (1) ring foundation, (2) dynamic model, and (3) hearing conditions for resetting tank January 13, 1982 SEB, HGEB 3.
NRC resolution on borings January 15, 1982 HGEB 4.
NRC resolution on ring foundation and dynamic model January 25, 1982 SEB, HGEB 5.
Testimony February 1, 1982 SEB, HGEB i
6.
Hearing February 15-19, 1982 SEB, HGEB 7.
Resolution on resetting tank May 1, 1982 SEB, HGEB l
i B
l I
l i
l l
l l
r i
i E'
yQ a
- p - [. '.
yu i
DIESEL GENERATOR BUILDING (DGB) 1.
CPCo draft generic submittal on cracks December 18, 1981 SEB, HGEB 2
Meeting on generic crack submittal January 11, 1982 SEB, HGEB 1
3.
CPCo submittal on DGB crackr February 8, 1982 SEB, HGEB 4.
Meeting on all technical aspects (borings, l
settlement, structural, cracks)
February 23, 1982 SEB, HGEB 5.
NRC resolution on all technical aspects March 2, 1982 SEB, HGEB 6.
Testimony due on all aspects of DGB March 15, 1982 SEB, HGEB 7.
Hearing March 29-April 2, 1982 SEB, HGEB i
Common with Aux. Bldg. and Sh'PS l
i 9
l l
I 1
ji,-\\
' R : '-
_-.I e,
~
PERMANENT DEWATERING I
1.
NRC approve 5 temporary wells December 11, 1981 HGEB
- i i
2.
NRC resolution on permanent Dewatering Criteria on Water Table Level / Recharge rate January 15, 1982 HGEB l
3.
CPCo submittal on partial recharge i
test results rebruary 15, 1982 HGEB l
4.
Meeting on partial recharge test results rebruary 18, 1982 HGEB f
i 5.
NRC Resolution on Partial Recharge March 8, 1982 HGEB test results 1
6.
Testimony due March 15, 1982 HGEB 1
1 j
7.
Hearing March 29-April 2, 1982 HGEB l
I l
1 i
i i
' All actions are principally Hydro l
i
}
J l
i i
i 1
l 1
1 l
1 i
l I
(
k p
+
0
EUCLOSURE 3 i
HEARINGS AND TESTIMONY 1.
llearing on Dynamic'Models for Aux. Bldg.,
December 14-16, 1981 SEB, HGEu Service water pump structure, BWST 2.
Preparation _ coapletion of Testir.ony on Underground Piping and DG Fuel Oil Tanks February 02, 1982 NEB 3.
Testimony on BWST and seismic model (file) and file item 2 above February 02, 1982 SEB,ilGES 4.
Testimony on QA plan on remedial fixes (file)
February 02, 1982 RIII 5.
Hearing on Underground Piping, diesel fuel February 16-19, 1982 SEB, HGEB, oil tanks, BWST and QA plans on remedial MEB, RIII fixes G.
Iestimony on SWPS borings and SWPS hearing, March 15, 1982 HGEB, SEB conditions, and all aspects of DG Bldg.
(file) 7.
Testimony on penr.anent dewatering system March 15, 1982 ItGEB (llVD)
(file) 8.
!! earing on DGB, SWPS and Permanent March 29-April 02,1982 HGEB, SEB Dewateri ng 1
OFFICE $
.......o su mme >
om)
Nnc ronu ais cio-soi nacu c24o OFFICIAL RECORD COPY usem ini-mm
_ _ _ _ _ _ _ _ _ _ - - - _ _ _ _ _ _