ML20041B355

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-373/82-03 on 820114-15.No Noncompliance Noted
ML20041B355
Person / Time
Site: LaSalle 
Issue date: 02/03/1982
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
COMMONWEALTH EDISON CO.
Shared Package
ML20041B356 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8202230561
Download: ML20041B355 (2)


See also: IR 05000373/1982003

Text

-

,

.

.

, mI 3y

.

lE wl N; a .~r_. %% l i

TEB

3 932

s,

nl

i n,

N,

Docket No. 50-373

q'

\\',S

j

@ Q i.1 '9

t ',

Commonwealth Edison Company

3

-"N 2193h

\\[ " E" h ' i

.c

I

ATTN:

Mr. Cordell Reed

h

Vice President

'"

6

Post Office Box 767

Chicago, IL 60690

Q

[

Cd /' g p c

Gentlemen:

.

This refers to the routine safety inspection conducted by Mr. D. E. Miller

of this office on January 14-15, 1982, of activities at LaSalle County

Station, Unit 1, authorized by NRC Construction Permit No. CPPR-99 and to the

discussion of our findings with Mr. Bishop at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

  • DMB :

-fe o k

8202230561 820203

'

DRADOCK05000g

I

-

--

,

.

.

Commonwealth Edison Company

-2-

FEB

3 082

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

UGrfgin?T SI@ t3 Ly U.7,'1 M di @ f

C. E. Norelius, Director

Division of Engineering and

Technical Inspection

Enclosure:

Inspection

Report No. 50-373/82-03

cc w/ encl:

Louis O. DelGeorge, Director

of Nuclear Licensing

L. J. Burke, Site

Construction Superintendent

T. E. Quaka, Quality

Assurance Supervisor

R.11. Holyoak, Station

Superintendent

B. B. Stephenson, Project Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Mary Jo Murray, Office of

Assistant Attorney General

1

f

RIII

RIII

RI I

RII

s

\\C

No{}reldT

~AQ

%

MiIler/dm

Gr ger

Wal er 73

. u s,

h

th

3

-lf22/82

g

h