ML20041B314

From kanterella
Jump to navigation Jump to search
Forwards Operating Repts for Aug - Dec 1981
ML20041B314
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 02/10/1982
From: Scott D
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20041B315 List:
References
82-198, NUDOCS 8202230517
Download: ML20041B314 (1)


Text

.

T Commonwealth Edison O

) Dr:sden Nucl31r P:wer Stttion i

7; R.R. #1

\\

, - Morris, Illinois 60450

)

/

Telephone 815/942-2920 l

l February 10, 198.,,

/%

DJS LTR:

82-198

,p Kf

.w..:D% g/

g

%< 9.'

g /, N C7 P-Director, Office of Inspection 70 and Enforcement g

United States Nuclear Regulatory 4

Commission

//

g Washington, D.C.

20555 4

Attention: Document Control Desk

Dear Sirs:

Enclosed please find Dresden Station's operating data for the period covering August to December, 1981.

These are being supplied per a telephone conversation between J. Hegner, the NRC Dresden Unit 3 Project Manager, and Thomas Rausch of Commonwealth Edison's Nuclear Licensing Administration for Dresden Station.

Sincerely, P

N%

e D. J. Scott Station Superintendent Dresden Nuclear Power Station DJS:KZ:mt Enclosure cc: Region III, Regulatory Operations, U.S. NRC Chief, Division Nuclear Safety, State of IL U.S. NRC, Document Management Branun I

Project Manager, EPRI f

Nuclear Licensing Administrator ff B. Lee, Exec. Vice President Statistical Research Manager, Tech. Serv. Nuc. Sta.

Tech. Staff EA On-Site NRC Inspector Sta. Nuc. Eng. Dept.

Comptroller's Office Nuc. Sta. Div. Vice Pres.

File /NRC Op. Data File / Numerical 8202230517 820210 PDR ADOCK 05000010 F3.

[PT5TS