ML20041B310

From kanterella
Jump to navigation Jump to search
IE Insp Rept 70-1113/81-13 on 811013-16.No Noncompliance Noted.Major Areas Inspected:Measurements,Measurement Control Program & Followup on Previously Identified Items.Details Withheld (Ref 10CFR2.790)
ML20041B310
Person / Time
Site: 07001113
Issue date: 11/13/1981
From: Alaine E, Bates J, Sabados J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20041B302 List:
References
70-1113-81-13, NUDOCS 8202230513
Download: ML20041B310 (1)


Text

MA"R1R TE.U!SMITTED ilSESim in acoy'o CONTAINS M90(d) SAFEGUARDS INFORMATION UNITED STATES 8'

N NUdLEAR REGULATORY COMMISSION g

a REGION 11

\\..... o

  • 101 MARIETTA st., N.W., SulTE 3100 ATLANTA, GEORGIA 30303 NOV 161981 Report No. 70-1113/81-13 Docket No. 70-1113 License No. SNM-1097 Safeguards Group No.111 Licensee: General Electric Company P. O. Box 780 Wilmington, North Carolina 28402 Date of Inspection : October 14-16, 1981 Type of Inspection:

Unannounced Material Control and Accountability Inspectors:/7_Ct/,M

// /3h/

'&W. Bates, Senior Safeguards Chemist Dat6 Sig'ned O W. S&bt)

> 1hs Lei J/ W. Sabados, Safeguards Chemist IJate ' Signed

~

Approved by:

b@

  • Meu 11 / % / 8 1 E. J. McAhpine, Chief,\\ Material Control and

% te Signed Accountability Section, Technical Inspection Branch Division of Engineering and Technical Inspection Inspection Summary Areas Inspected: Measurements, measurement control program and follow-up on previous identified items of noncompliance.

The inspection involved 57 inspector hours on site by two NRC inspectors and was begun during the regular hours.

Results: The licensee was found to be in compliance with NRC requirements in the three areas examined during the inspection except for the following item.

Failure to properly document an out-of-control situation (81-13-01).

s Y2

}

@k-

,,ct to to

, toen gt specif10 r 1911 r

o 1

MATERIAL TRANSMITTED HEEB'imi 8202230513 011116 PDR ADOCK 07001113 C

PDR