ML20041B255
| ML20041B255 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 02/12/1982 |
| From: | Spessard R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Jackie Cook CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML20041B256 | List: |
| References | |
| NUDOCS 8202230436 | |
| Download: ML20041B255 (2) | |
See also: IR 05000329/1982002
Text
.
_ - _____
_ _ _
f recoq
.
,
4
UNITED STATES
!
N.
NUCLEAR REGULATORY COMMISSION
$
,E
REGION 111
p
799 ROOSEVELT ROAD
GLEN ELLYN, ILLINols 60137
o
.....
February 12, 1982
Docket No. 50-329
,
_
'
Docket No. 50-330
g
//
/
gcArgg (j
Consumers Power Company
,g
ATTN:
Mr. James W. Cook
,7
EEB,9
-
Vice President
i
"{D e~ %d %g&
.}
73 8
Midland Project
r
k
1945 West Parnall Road
Cy
' d%
Q h @ f\\@D
'
Jackson, MI 49201
$^s
Gentlemen:
/ i.
'
-
This refers to the routine safety inspection conducted by Messrs.
'
C. E. Jones and K. R. Ridgway of this office on Janaury 19-22, 1982,
of activities at Midland Nuclear Power Plant, Unit I and 2, authorized
by NRC Construction Permits No. CPPR-81 and No. CPPR-82 and to the
discussion of our findings with Mr. W. Bird and others of your staff at
the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
,
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
"
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information that
you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
.
8202230436 G20212
PDR ADOCK 05000329
fSg;/r
G
,.
..
-
,f
,
.
.
.
Consumers Power Company
2
February 12, 1982
delayed such that less than seven (7) days are available for'your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed-
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
" Original signed by R.L. Spessard"
R. L. Spessard, Director
Division of Project and
Resident Programs
Enclosure:
Inspection Report
No.' 50-329/82-02(DPRP) and
No. 50-329/82-02(DPRP)
cc w/ enc 1:
-DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
The Honorable Charles Bechhoefer, ASLB
The Honorable Jerry Harbour, ASLB.
The Honorable Frederick P. Cowan, ASLB
The Honorable Ralph S. Decker, ASLB
Michael Miller
Ronald Callen, Michigan
Public Service Commission
Myron M. Cherry
Barbara Stamiris
Mary Sinclair
Wendell Marshall
Steve J. Gadler
RIII
RIII
RIT
RII}
RIII
(Qk
fC
M' Q
Q
d/jp
Kn6'g 2'
Spe
ard
R dgway
es
i
2/12/82
2fttl
~
\\