ML20041B212
| ML20041B212 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 02/04/1982 |
| From: | Spessard R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20041B213 | List: |
| References | |
| NUDOCS 8202230393 | |
| Download: ML20041B212 (2) | |
See also: IR 05000010/1982001
Text
. ,
.
..
..
. - - - - --
.-
- - - - - - -
- - --- -_ - -------
..
1 .
FEB A
yggg
s
-
Docket No. 50-10
4
4
Docket No. 50-237
%
UECjgjp
Docket No. 50-249
3
gD
lQ287
-
v
Commonwealth Edison Company
Z %
-~
4 Q 0;/,/,gje g %
82d 4
ATTN:
.Mr. Cordell Reed
Vice President
'g
g,pw7,
Post Office Box 767
s'
g
Chicago, IL 60690
Gentlemen:
This refers to the special safety inspection conducted by Mr. F. W. Reimann
of this office during the period of January 5-15, 1982, of your followup in
regard to various unresolved items, open items, and previously' identified
items of noncompliance at the Dresden Nuclear. Power Station, Units 1, 2 and:
3, authorized by NRC Operating Licenses No. DPR-02, DPR-19, and DPR-25 and<
to the discussion of our findings with Mr. Scott and others of your staff at
'the conclusion of the inspection.
The enclosed copy of our inspection report identifie.; areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and .in-
terviews with personnel.
No items of noncompliance with'NRC' requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of.
this ' letter and the enclosed -inspection report will be -placed in the NRC's
Public Document Room.
If this report contains any information that you (or
your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within ten (10)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days'from the date of
this letter a written application to this office to withhold such information.
~
If your receipt of this letter has been delayed such that less than seven (7)
days are available for your review, please notify this office promptly so
that a new due date may be established. Consistent with Section 2.790(b)(1),
any such application must be accompanied by an affidavtt executed by the
owner.of the information which identifies the document or part sought to
be withheld, and which contains a full statement of the reasons which are
8202230393 820204
PDR ADOCK 05000010
G
MQ)_f JLL_
,
.
..
Commonwealth Edison Company
-2-
the bases for the claim'that the information should be withheld from public
disclosure. This section further requires the statement to address with
specificity the considerations listed in 10 CFR 2.790(b)(4). The informa-
tion sought to be withheld 'shall be incorporated as far as possible into a
separate part of the affidavit.
If we do not hear from you in this regard
within the specified periods noted'above, a copy of this letter and the
enclosed inspection report will be placed in the Public Document Room.
We'will gladly discuss any questions you have concerning this inspection.
Sincerely,
t J3s
e
R. L. Spessard, Director
Division of Resident and
Projects Inspection
Enclosure:
Inspection Reports
No. 50-10/82-01, No. 50-237/82-02
and No. 50-249/82-02
cc w/ encl:
Louis 0. DelGeorge, Director
of Nuclear Licensing
D. J. Scott, Station
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
,
l
Mary Jo Murray, Office of
l
Assistant Attorney General
i
,
l
I
l
l
L
RIII'
RIII
RIII
h(
j
l
Walker /so
Knop
sv'
Spbs sa$te-
rd
1
2/2/82
I
8kk/s2.
!
LL________