ML20041B082
| ML20041B082 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 02/08/1982 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W CONNECTICUT YANKEE ATOMIC POWER CO. |
| Shared Package | |
| ML20041B083 | List: |
| References | |
| NUDOCS 8202230254 | |
| Download: ML20041B082 (2) | |
See also: IR 05000213/1981011
Text
{{#Wiki_filter:- _ _ _ a FEB U R Docket No. 50-213 9 Connecticut Yankee Atomic Power Company ATTN: Mr. W. G. Counsil & 4 Vice President - Nuclear 4, &/pC,,O - T Engineering and Operations 9 \\ E
- Eg'D
P. O. Box 270 - ~~ ^ Hartford, Connecticut 06101 L U Gentlemen: Dh , Subject: Inspection No. 50-213/81-11 T This refers to the routine safety inspection conducted by Mr. R. Baer of this office on September 14-18 and October 13-16, 1981, of activities authorized by NRC License No. DPR-61 and to the discussions of our findings held by Mr. Baer with Mr. R. Graves of your staff at the conclusion of the-inspection. Areas examined during this inspection are described in the Office of Inspection and Enforcement Inspection Report which is enclosed with this letter. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the- inspector. Within the scope of this inspection, no items of noncompliance were observed. In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will be placed in the NRC Public Document Room unless you notify this office, by telephone, within ten days of the date of this letter and submit written applica- tion to withhold information contained therein within thirty days of the date of this letter. Such application must be consistent with the requirements of 2.790(b)(1). No reply to this letter is required; however, if you have any questions concerning this inspection, we will be pleased to discuss them with you. Sincerely, N W '&I Thomas T. Martin, Director Division of Engineering and Tecnnical Inspection Enclosure: Office of Inspection and Enforcement Inspection Report Number 50-213/81-11 d[[ PTk RI:DETI- RI:DETI RI:DETI RI. TI Baer/pja Knapp Jo ner Ma in 1/ /82 I)to {f u 8202230254 820200 0FFICIAL RECORD COPY gg og PDR ADOCK 05000213 ,f G PDR . _ - - - ___
. . Connecticut Yankee Atomic Power Co. 2 8 FEB 1982 cc w/ encl: R. Graves, Plant Superintendent D. G. Diedrick, Manager ~+ Quality Assurance R. T. Laudenat, Manager, ieration Facilities Licensing J. F. Opeka, System Superintendent, Nuclear Operations Public Document Room (PDR) local Public Document Room (LPDR) ' Nuclear Safety Information Center (NSIC) NRC Resident Inspector State of Connecticut bcc w/ encl: Region I Docket Room (with concurrences) Chief, Operational Support Section (w/o encl) Director, DRPI 0FFICIAL RECORD COPY }}