ML20041B047
| ML20041B047 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 02/11/1982 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Faulkenberry B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, ANPP-20150-GHD, NUDOCS 8202230204 | |
| Download: ML20041B047 (2) | |
Text
.
4s
-e
((Y ADTEBMi3A TFJJ::MC @EMJIVEDM C@5HRA?3T P. O. BOX 216 6 6 PHOENIX. ARIZON A 85036 February 11, 1982 c.3 ANPP-20150-GHD/BSK EO j
M
- e U. S. Nuclear Regulatory Commission h
Region V 53 03 M E!
~
Creekside Oaks Office Park 1450 Maria Lane - Suite 210
- e.
Walnut Creek, California 94596-5368 Attention: _Mr. B. H. Faulkenberry, Chief Reactor Construction and Engineering Support' Branch
Subject:
Time Extension for Report - DER 81-35
~
A 50.55(e) Potentially Reportable Deficiency Relating to a Leak in Temporary Fire Protection Pipe Disturbing Backfill in Proximity of Auxiliary and Control Buildings File:
82-019-026 g
D.4.33.2 9
Reference:
(A) Telephone Conversation between Bob Dodds and gr3CEG/UU G. Duckworth on October 7, 1981 (B) ANPP-19405, dated November 5, 1981, (Interim t
FEB 2 21982* 31 Report)
MENCN3# '
g.ni surn a
'Q 1G M
Dear Sir:
4
/
ro The NRC was. notified of a potentially reportable deficiency in Reference (A) and an Interim Report was transndtted by Reference (B). At that time, it was estimated that a Final Report would be available by Febru-ary 15, 1982.
Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by May 20, 1982, when a complete report will be submitted.
There is no new information or change to the Interim Report at this time.
Very truly ypurs CLtL qttA{N E. E. Van Brunt, Jr.
APS Vice President Nuclear Projects ANPP Project Director EEVBJr/GHD:ske cc:
See Attached Page 2 b Q 8202230204 820211 PDR ADOCK 05000528 S
e.
U. S. Nuclear Rsgulatory Commission Attention:
Mr. B. H. Faulkenberry, Chief ANPP-20150-GHD/BSK February 11, 1982 Page 2 cc:
Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 J. A. Roedel D. B. Fasnacht G. C. Andognini F. W. Hartley J. M. Allen A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. A. Brand A. C. Gehr W. J. Stubblefield W. C. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Ms. Patricia Lee Hourihan l
6413 South 26th Street Phoenix, Arizona 85040 l
l