Text
,
4 s
POWER AUTHORITY OF THE STATE OF NEW YORK 10 COLUMBUS CIRCLE NEW YORK. N. Y. loo 19 (212) 397 6200 GEOR,G E 7. BERRY op.natino orric.n TRU$ FEES JOHN S. DYSON JOHN BOSTON C MalRM AN PRESIDENT ROCEDURES GEORGE L. ING ALLS vecE cMaseM AN JOSEPH R C IEDER D.
T & cMI.F fEICH AR D M. FLYNN
.O.ERTi. uittouri bruary 19, 1982 t,oy
..,,ct,,,
- <,~g,a, ;l",'c1*'==='
,REOERicx R. cLAR.c OF FIC.R
".^.*.",.0,c.......T
...~...
co.~..<
Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Attention:
Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing
Subject:
James A.
FitzPatrick Nuclear Power Plant Docket No. 50-333 Proposed Changes to the Technical Specifications Regarding Reload 4/ Cycle 5 - Revision 1 to Attachment IV r
References:
- 1. November 18, 1981 letter; J.P. Bayne (PASNY) to T.A.
Ippolito (USNRC) regarding changes m
C) to the Technical Specifications for Reload e
4/ Cycle 5 M
P.UCN
\\
- 2. February 20, 1981 letter - J.P. Bayne (PASNY)
FEB2Bggggy.$".}
to T.A.
Ippolito (USNRC) regarding proposed C
l Technical Specifications changes related to Core o n2%%[ @'
Flow Considerations.
(Include NEDO-24243, February 1980 and NEDO-24243, Supplement 1, tec y
July 1980) to
/
N
Dear Sir:
Attached is Revision 1 to a document entitled, " Supplemental Reload Licensing Submittal for James A. FitzPatrick Nuclear Power Plant Reload, February 1982 (yl003J01A25)" originally submitted as Attachment IV to Reference 1.
This Revision 1 adds a new Appendix B,
" Load Line Limit Analysis Reverification," to ky\\
0 F202230131 820219 PDR ADOCK 05000333 P
PDR l
s
. i
. document the applicability of the load line_ limit analysis, (Reference 2) to cycle 5.
The transient analysis portions of Reference 2 were verified using the ODYN computer program and this new Appendix B summarizes the results of this reveri-fication.
If you have any questions, please do not hesitate to con-tact us..
Very truly~yours, L
ty.
P,.
ayne
. MrrcHELC 1 WGMSTart Senibr Vice President h lay P r
6 f*l
/cwYork h
Nuclear Generation
?
t G mn;,vs m :.,. G Ccmtr,1s zu be;, ; ngaq )9 7]
State of New York County of New York Subscribed and Sworn to before me this jyth day of jQ.g y,y l782.
N Y
hf f
$k Notar P6bl K /
p cc:
Mr. J.
Linville Resident Inspector U. S.
Nuclear Regulatory Commission P. O. Box 136 Lycoming, NY 13093 Mr. Ron Barton United Engineers & Constructors, Inc.
30 S.
17th Street Philadelphia, PA 19101
25,7 FEBRUARY 1982 SUPPLEMENTAL RELOAD LICENSING SUBMITTAL FOR JAMES A.
FITZPATRICK NUCLEAR POWER PLANT RELOAD 4 GENER AL h ELECTRIC