CommomposMh Edison f ) one Mrst National Ptua. Chic;go, liknois Addr:ss Rrply to: P:st Offica Box 767 v
Chicago, ll!inois 60690 February 16, 1982
/
to e'
g RECE!VED C
Mr. Harold R. Denton, Director g.
Of fice of Nuclear Reactor Regulation FEB 2 219826 N U.S. Nuclear Regulatory Commission
- amm %
. Washington, DC 20555 V
EcommY Its; h
c,h
Subject:
Zion Station Units 1 and 2
/ co Diesel Generator Reliability NRC Docket Nos. 50-295 and 50-304 References (a):
March 27, 1981, letter from S. A. Varga to J. S. Abel.
(b):
May 29, 1981, letter from T.R. Tramm to H. R. Denton.
Dear Mr. Denton:
This letter provides a status report on the diesel generator reliability improvement program at Zion Station.
Attachment A to reference (b) provided a schedule for implementation of several siesel generator improvement items.
Completion status and updated schedules for these items are presented in Attachment A to this letter.
For the year 1981, the diesel generators exhibited a reliability o f 99.3%.
Over 280 successful starts were conducted during this period.
These results reflect the contributions of.the reliability improvement program and the continuing commitment of Commonwealth Edison personnel to achieve the highest degree of diesel generator reliability possible.
Please address questions regarding this matter to this o f fice.
Very truly yours, fk nbbx F. G. Lentine Nuclear Licensing Administrator 1m Attachment cc:
Zion Resident Inspector kg0 6@
3445N 8202220313 820216 PDR ADOCK 05000295 P
ATTACHMENT A-SCHEDULE OF DIESEL GENERATOR IMPROVEMENTS SCHEDULED-COMPLETION ACTION DATE 1.
Training of maintenance, operating and technical staff personnel by Cooper-Bessemer.
9/01/82 Status:
Training sessions being scheduled for 1982.
2.
Training of engineers on diesel engine analysis techniques by Cooper-Bessemer.
Completed 3.
Application of locking compound to control air system fittings.
Completed 4.
Installation o f flow limiting orifices in service water piping from lube oil and jacket water coolers.
3/15/82 Status:
1A, 18, 0, 2A diesel generators completed.
1 orifice remains to be ' installed in 28 diesel generator.
5.
Installation o f first out annunciator on protective trip system.
Completed
- 6. - Performance analysis o f all diesel generators.
1/01/83 Status:
Electronic engine analyzer to be purchased in 1982.
7..
Installation of a jacket water heating system.
5/01/83 Status:
Design / review:in progress.
3445N
,