Public Version of Revision 6 to Emergency Plan Implementing Procedures,Consisting of Temporary Mods T-5849 to Procedure Ei 1300.08 Re Emergency Control Ctr Activation & T-5850 to Ei 1300.12 Re Administrative ControlsML20041A336 |
Person / Time |
---|
Site: |
Davis Besse |
---|
Issue date: |
12/31/1981 |
---|
From: |
Durdel R TOLEDO EDISON CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20041A325 |
List: |
---|
References |
---|
PROC-811231-01, NUDOCS 8202190447 |
Download: ML20041A336 (4) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20216E6111999-09-0707 September 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210H0731999-07-28028 July 1999 Proposed Tech Specs 3/4.7.5.1, Ultimate Heat Sink, Allowing Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F ML20210G4311999-07-27027 July 1999 Proposed Tech Specs,Changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm ML20210G4801999-07-26026 July 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210G9161999-07-26026 July 1999 Proposed Tech Specs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrumentation - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor ML20210G5391999-07-26026 July 1999 Proposed Tech Specs Re Implementation of 10CFR50,App J, Option B for Type B & C Containment Leakage Rate Testing ML20195F9351999-06-10010 June 1999 Proposed Tech Specs,Revising TS 3/4.6.4.4, Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.6.5.1, Crevs ML20207E7941999-05-21021 May 1999 Proposed Tech Specs Allowing Use of Expanded Spent Fuel Storage Capability ML20205E5031999-03-19019 March 1999 Proposed Tech Specs Withdrawing Proposed New Action B, Previously Submitted in 981027 Application ML20204F1821999-03-0909 March 1999 Proposed Tech Specs,Adopting Changes in Frequency & Scope of Volumetric & Surface Exams Justified by W TR WCAP-14535A ML20155E4971998-10-28028 October 1998 Proposed Tech Specs 4.0.2 Re Applicability of 25% Surveillance Interval Extension Allowance ML20197G5521998-10-28028 October 1998 Rev 8 to Dbnps,Unit 1 Technical Requirements Manual ML20155E3231998-10-28028 October 1998 Proposed Tech Specs Revising Various Sections of 6.0, Administrative Controls, Including Relocation of 6.11 Contents to Plant Ufsar,Per NUREG-1430,Rev 1 ML20155D7791998-10-27027 October 1998 Proposed Tech Specs Relocating TS SR 4.6.5.1.d.4 Re Evs Negative Pressure Testing to TS 3/4.6.5.2,deleting TS Definition 1.24 & Making Related Changes Associated with Deletion of Subject Definition ML20155D8521998-10-27027 October 1998 Proposed Tech Specs Revising SRs 4.8.2.3.2.d,4.8.2.3.2.e, 4.8.2.3.2.f & Table 4.8-1 Re Testing of 125 Volt DC Station Batteries & Applicable TS Bases ML20155E0721998-10-27027 October 1998 Proposed Tech Specs Revising 3/4.3.1.1 Re RPS Instrumentation & 3/4.3.2.3 Re ARTS Instrumentation,To Provide Potential Reduction in Spurious Trip Rate for Potential Cost Savings in Excess of $50,000 ML20151W3071998-09-0808 September 1998 Proposed Tech Specs Permitting Use of Framatome Cogema Fuels M5 Advanced Alloy for Fuel Rod Cladding & Fuel Assembly Spacer Grids ML20151W2991998-09-0808 September 1998 Proposed Tech Specs Revising Section 3/4.7.6, Plant Systems - CREVS & Associated Bases ML20206D2721998-08-28028 August 1998 Rev 11,change 1 to Odcm ML20217P8351998-04-24024 April 1998 Proposed Tech Specs Clarifying Discussion of Margin Between RPS High Pressure Trip Setpoint & Lift Setting for Pressurizer Code Safety Valves ML20217P8811998-04-24024 April 1998 Proposed Tech Specs 3/4.3.1.1,3/4.3.2.1,3/4.3.2.2 & Associated Bases Relocating Tables of Response Time Limits to Plant USAR Technical Requirements Manual ML20217C4881998-03-20020 March 1998 Proposed Tech Specs SR 4.4.5.3.c.1,providing Greater Specificity as to Location of Addl Insps in Unaffected SG ML20217N4471998-02-27027 February 1998 Proposed Tech Specs Pages Provided to Modify Proposed New Action 3.7.6.1.b to Make More Consistent w/NUREG-1431 ML20203L1111998-02-26026 February 1998 Proposed Tech Specs Pages Re Amend to License NPF-3 Involving Incorporation of New Repair Roll Process for SG Tubes W/Defects in Upper Tube Sheet ML20197J2621997-12-23023 December 1997 Proposed Tech Specs Pages Re Changes to TS Definition 1.2, TS 3/4/9.5 & New TS 3.0.6 & Associated Bases.Ts Index Rev to Reflect Change to TS 3/4.9.5,included ML20197J5971997-12-23023 December 1997 Proposed Tech Specs Pages,Revising TS Surveillance Requirements for ISI Requirements of Internal Auxiliary Feedwater Header,Header to Shroud Attachment Welds & External Header Thermal Sleeves ML20217M5601997-09-0505 September 1997 Rev 11.0 to Davis-Besse Odcm ML20217R2821997-08-26026 August 1997 Proposed Tech Specs,Clarifying LCO 3.6.1.3.a & Revising Surveillance Requirement 4.6.1.3.c ML20217R2871997-08-26026 August 1997 Proposed Tech Specs,Modifying TS 3.2.5 Action Statement to Require Power Reduction to Less than 5% of Rated Thermal Power within Four Hrs If RCS Flow Rate Is Less than Specified Limit for Greater than Two Hrs ML20217G5981997-07-29029 July 1997 Proposed Tech Specs 3/4.4.3 Re Safety Valves & Pilot Operated Relief valve-operating ML20141F1101997-06-24024 June 1997 Proposed Tech Specs,Deleting Requirements for Safety Features Actuation Sys Containment High Radiation Monitors ML20138C3261997-04-18018 April 1997 Proposed Tech Specs 3/4.7.6 Revising Limiting Condition for Operation to Include New Required Actions in Event That One or Both Channels of Radiation Monitoring Instrumentation Becomes Inoperable ML20138A6891997-04-18018 April 1997 Proposed Tech Specs 3/4.5.3.2.1 & 3/4.5.2 Modifying Presently Specified 18-month Surveillance Frequencies to New Specified Frequencies of Once Each 24-months ML20140D9481997-04-0909 April 1997 ODCM, Rev 10 ML20138M1281997-02-14014 February 1997 Proposed Tech Specs 3.5.2 Re Emergency Core Cooling Systems & 4.5.2.f Re Surveillance Requirements ML20134L0561997-02-13013 February 1997 Proposed Tech Specs Re Changes Made Concerning Decay Heat Removal Sys Valve ML20134F1811997-01-30030 January 1997 Proposed Tech Specs Re Possession & Use of SNM as Reactor Fuel ML20134D7621997-01-30030 January 1997 Proposed Tech Specs Revising SR Intervals from 18 to 24 Months Based on Results of DBNPS Instrument Drift Study & TS 2.2, Limiting Safety Sys Settings, Based on Results of Revised Framatome RPS Instrument String Error ML20134B0591997-01-20020 January 1997 Proposed Tech Specs 3/4.5.3 Re ECCS Subsystems ML20132B7031996-12-11011 December 1996 Proposed Tech Specs Revising TS Definitions,Instrumentation TS & ECCS TS for Conversion to 24 Month Fuel Cycle for License NPF-3 ML20134F1891996-10-28028 October 1996 Proposed Tech Specs 3/4.8 Re Electrical Power Systems ML20117P5311996-09-17017 September 1996 Proposed Tech Specs,Supporting Conversion of DBNPS from 18 Month to 24 Month Fuel Cycle ML20117N8531996-09-12012 September 1996 Proposed Tech Specs Re Reactivity Control Systems & Emergency Core Cooling Systems ML20117M2201996-09-0404 September 1996 Proposed Tech Specs 6.2.3,removing Specific Overtime Limits & Working Hours ML20116K2631996-08-0707 August 1996 Proposed Tech Specs Re Definitions,Applicability Bases, Containment Spray Sys & Containment Isolation Valve for Conversion to 24 Month Fuel Cycle ML20117K1911996-05-28028 May 1996 Proposed Tech Specs 3/4.3.1.1 - RPS Instrumentation & TS 3/4.3.2.3 - Anticipatory RTS Instrumentation Increasing Trip Device Test Interval ML20101M1921996-03-29029 March 1996 Proposed Tech Specs 3/4.6.4.4 - HPS,3/4.6.5.1 - Shield Building Evs & 3.4.7.6.1 - CREVS Re Changing Surveillance Requirements for Charcoal Filter Lab Testing to Revise Methodology Used to Determine Operability in ESF AHUs ML20101C6961996-03-0606 March 1996 Proposed Tech Specs,Allowing Deferment of SR 4.5.2.b for ECCS Flowpath Containing HPI Pump 1-2 Until 10th Refueling Outage,Scheduled to Begin 960408 ML20100E0101996-02-0505 February 1996 Proposed TS 3/4.3.2.1,Table 3.3-3,safety Features Actuation Sys Instrumentation,Reflecting Design & Actuation Logic of Plant Sequencers & Essential Bus Undervoltage Relays ML20107C3101995-12-21021 December 1995 Rev 9 to Odcm 1999-09-07
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20197G5521998-10-28028 October 1998 Rev 8 to Dbnps,Unit 1 Technical Requirements Manual ML20206D2721998-08-28028 August 1998 Rev 11,change 1 to Odcm ML20217M5601997-09-0505 September 1997 Rev 11.0 to Davis-Besse Odcm ML20140D9481997-04-0909 April 1997 ODCM, Rev 10 ML20107C3101995-12-21021 December 1995 Rev 9 to Odcm ML20107C3021995-10-16016 October 1995 Rev 8 to Odcm ML20199L1821995-09-0909 September 1995 Rev 3 to DB-OP-00000, Conduct of Operations ML20082V4071995-02-0303 February 1995 Offsite Dose Calculation Manual Rev 7 ML20072S8611994-06-22022 June 1994 Rev 6 to Davis-Besse Offsite Dose Calculation Manual ML20056F3071993-08-0808 August 1993 Rev 3 to Emergency Plan Off Normal (Epon) Occurrence Procedure HS-EP-02820, Earthquake. W/Rev 23 to Epon Occurrence Procedures Manual Table of Contents ML20072S8401992-12-18018 December 1992 Rev 5 to Davis-Besse Process Control Program ML20072S8501992-12-18018 December 1992 Rev 5.2 to Davis-Besse Offsite Dose Calculation Manual, Reflecting Rev 5,Change 2 to ODCM ML20101R1721992-06-11011 June 1992 Rev 1 to Vol I of Inservice Insp Plan,Second 10-Yr Nuclear Interval Pump & Valve Inservice Testing Program ML20114C6321992-05-19019 May 1992 Change 1 to Rev 5 to ODCM ML20114C6301992-03-0606 March 1992 Rev 5 to ODCM ML20217C3661991-07-0808 July 1991 Rev 3 to Administrative Procedure NG-IS-00002, General Nuclear Security Requirements. Pages 7,9,10 & 15 Only ML20084U5911991-02-22022 February 1991 Rev 4 to ODCM ML20217C3481990-12-18018 December 1990 Rev 1 to Security Dept Procedure IS-DP-04007, Performance Test for Alco-Sensor ML20059D4181990-08-28028 August 1990 Second 10-Yr Interval Pump & Valve Inservice Testing Program ML20217C3001990-08-23023 August 1990 Rev 5 to Security Dept Procedure IS-AC-00011, Protected & Vital Area Badge Issuance & Control ML20217C3571990-08-0909 August 1990 Rev 3 to Security Implementing Procedure IS-AC-00516, Unescorted Access Requirements ML20217C3071990-07-27027 July 1990 Rev 2 to Security Dept Procedure IS-AC-00015, Fingerprint Processing & Controls ML20217C3201990-06-27027 June 1990 Rev 1 to Security Dept Procedure IS-AC-00018, Drug & Alcohol Testing Process ML20217C3811990-06-22022 June 1990 Rev 4 to Nuclear Group Procedure NG-IS-00004, Fitness for Duty Program ML20217C4001990-04-0202 April 1990 Corporate Ref Manual - Nuclear NU-102, Fitness for Duty ML20217C3401990-01-12012 January 1990 Rev 1 to Security Dept Procedure IS-DP-00101, Bac Simulation ML20217C3281989-11-0909 November 1989 Rev 1 to Security Dept Procedure IS-DP-00100, Bac Exams ML20217C3141989-10-25025 October 1989 Rev 2 to Security Dept Procedure IS-AC-00017, Denied Access List Control ML20217C3941989-08-0101 August 1989 Corporate Ref Manual - Human Resource HR-604, Drug & Alcohol Policy ML20244A8421989-05-31031 May 1989 Pressurizer Surge Line Thermal Stratification Phase I Program ML20213A0311987-03-31031 March 1987 Rev 2 to Vol IV of Procedure Writers Manual:Operation Procedures Guidelines ML20213A0361987-03-31031 March 1987 Rev 1 to Davis Besse Emergency Procedure Verification & Validation Program ML20212D1621987-01-27027 January 1987 Rev 1 to Maint Procedure MP 1411.06, Preventive Maint for Type Smb & Smc Valve Operators ML20198D2551986-12-27027 December 1986 Rev 2 to Maint Procedure MP 1411.04, Maint & Repair of Limitorque Valve Operators Type SMB-000 & SMB-00. Temporary Mod Request T-9969,indicating Rewiring of Fcr 85-302 MU-11 to Torque Out in Open Direction,Encl ML20212B5721986-12-15015 December 1986 Rev 0 to Security Training & Qualification Plan, Superseding Rev 24 to App B of ISP AD1808.00.W/o Revised Pages ML20212C9481986-11-21021 November 1986 Rev 8 to Maint Procedure Mpo 1410.32, Testing of Motor- Operated Valves Using Movats ML20212D3131986-10-28028 October 1986 Change 3 to Temporary Mods T10161 & T10144 to Rev 0 to Maint Procedure MP 1411.07, Maint & Repair of Limitorque Valve Opr Smc 04, Incorporating Fcr 86-0092,Rev a Re Removal & Installation of Limiter Plate ML20212D1091986-10-21021 October 1986 Change 1 to Rev 2 to Maint Procedure MP 1411.04, Maint & Repair of Limitorque Valve Operators Type SMB-000 & Smb 00, Addressing Need for Procedure to Address Replacement of Defectrive Parts ML20212D1471986-10-0303 October 1986 Rev 1 to Maint Procedure MP 1411.05, Maint & Repair of Limitorque Valve Operators Types SMB-0 Through SMB-4 ML20212C9181986-09-22022 September 1986 Rev 1 to Procedure NEP-092, Establishing D/P Limits & Tests for Q Motor Operated Valves ML20203M0201986-08-21021 August 1986 Specs for Mist Continuous - Venting Tests ML20210V1131986-08-20020 August 1986 Rev 0 to Emergency Plan Implementing Procedure EP-2320, Emergency Technical Assessment ML20206P6511986-06-30030 June 1986 GE Owners Group Action Plan as Result of Davis-Besse Event, June 1986 ML20198D2361986-05-0202 May 1986 Rev 5 to Maint Procedure MP 1410.32, Testing of Motor- Operated Valves Using Movats ML20141J5231986-04-18018 April 1986 Human Engineering Discrepancy Review & Closeout Process for Davis-Besse Dcrdr Program ML20205M6981986-04-0707 April 1986 Rev 0 to Nuclear Engineering Procedure NEP-092, Establish Differential Pressure Limits & Tests for Motor-Operated Valves ML20205M7031986-03-25025 March 1986 Rev 0 to Nuclear Engineering Procedure NEP-091, Motor- Operated Valve (MOV) Data Evaluation ML20141N1501986-02-26026 February 1986 Procedure Fcr 85-227, Main Feedwater Block Valve Interlock ML20141N1561986-02-26026 February 1986 Procedure Fcr 85-200, Main Feedwater Pumps Rapid Feedwater Reduction Speed Setpoint ML20141N1531986-02-26026 February 1986 Procedure Fcr 85-201, Steam Generator Level Setpoint 1998-08-28
[Table view] |
Text
,;.'.-
L.
r q THE TOLEDO EDISON CCMPANY j . DAVIS-BESSE NUCLEAR PC'4ER STATION
, N CICY PLAN IMPLEMCITING PROCEDURES q REVISION DIDEX LJ .
7 I
a a PACE REVISICN PROCEDURES REVISION TD90RARY MODIFICAT .7.1S U
J 1 0 EI 1300.00 1
.I EI 1300.01 2 a
_, EI 1300.02 1 1
ij -
EI 1300.03 1 EI 1300.04 1 i
1 EI 1300.05
'i EI 1300.06 2
, EI 1300.07 1
'5 EI 1300.09 0 EI 1300.10 0
,7
, ,J EI 1300.11 0 EI 1300.12
, 1 T-5850 L.
.l O
1 a^
Revision 6
[
=
December 1981 I ._ -
3 8202190447 810211 PDR ADOCK 05000346
- PDJ
.e s
\ . .
p '. .
Ot4TRiluTION 34 .
^
Or! sinal, Responsible Section Head Action
- - p,0 ;
_ _. ,ii.co...M. rru.
lI lj COPIES TO SE MODI, LED FOR IMMEDI ATE IMPLEMENTATION DAVIS-DESSE NUCLEAR POWER STATION . UNIT 1 C&HP Supervisor - 1 Emer. Planning - 3 q TEMPORARY MODIFICATION REQUEST Control Room - 2 ED 6926 Shift Supervisor - 2
, j SECTION 1 PROCEDURE TITLE AND NUMBER
'" El 1300.08, Emergency Control Center Activation RE ASON ,OR CH ANGE
] To upgrade references to agencies and equipment lists in regard to Emer3ency Control Center Activation and to clarify the location of the E. C. C. (Emergency Control Center).
I I
.J M
U J
CHANGE See attached sheet. -
4 ES PROCEDURE REvtSION REQUIRED if no, this modification is valid until Yes , No PREPARED 8Y DATE Ron Durdel, Emergency Planning e 1L M ///J3/g/
APPROVED BY / ./ /e/ DATC ,
e .* s~ / .sf = t-
/l APPROVED BY f /
- DATE' /
/
/ / .l . Ld d '/-
SUBMITTE D BYAsoction Hook DATE iltr/T I k- . t j/?A t's s.1l'.E
///R/f/
HECOMMENDED BY (SRB Chairman) DATEI j in m - ,( .2 l+1 en
'~ OA APPROVED BY (Msnager of unihv A'n[urence) DATE t' DATE APPROVED BY (Etation Superint'escent)
' l*
. p -.- \ -
IkW*y l
=
5 h
'l .
r, 9 .
i j LJ
- 1 Temporary Modification
- EI 1300.08 Emergency Control Center Activation R ,.j
,. On Page 1, Section 5.1, the first sentence should read:
" The ECC is located at the Davis-Besse Nuclear Power Station' site, along Ohio State Route 2, in the DBNPS Administration Building.
'. l 2 .
On Page 4, Section 5.5.2,d.2, should be changed to read:
[1 ij 2. REMS Corporation On Page 7, the ECC Equipment Checklist, change the location of the cabinets
, 'J to read:
- l East Cabinet on South Wall u .
- On Page 7 of the ECC Equipment Checklist, under Batteries, it should read
~~
Batteries:
- _ 12 Volt 35-102 Booster 1 ea.
"D" Cell, 185 Volt 12 ea.
9-Volt 12 ea.
NEDA 220,~.15 Volts for SK-1 Speakers 12 ea.
il NEDA 15M, 1.4 Volt "AA" Pen 11tes.
2 ea.
12 ca, Lj r'
l~
On Page 8, the ECC Equipment Checklist, change the location of the cabinets to read:
I' West Cabinet on South Wall L
14 4 :
~
t r
i.
r ---n. , - - - - - - ~ ,- -~-
.e - e - -
~ *
. ! T R 4;UTI AN
~l iJ
- Original, Responsible Section Head Actiort i
p File Copy, Meeter File COPIES TO 8E MoOlFIED FoR IMMEDIATE IMPl.EMENTATloN
, DAVIS BESSE NUCLEAR POWER STATION - UNIT 1 Shift Supervisors Office - 2 TEMPORARY MODIFICATION REQUEST Control Room - 2/ Safety Coordinator - 1 l]j ED 692s Emergency Planning - 3 SECTION 1
[~; PROCEDURE TITLE AND NUMBER EI 1300.12 Administrative Controls Emergency Plan Implementing Procedure REASON FoR CHANGE
' " To upgrade reference to medical equipment.
r-U b
CHANGE
] On Page 8, Attachment 2, the reference to Eye Warm Solution should be changed i to read:
Eye Wash Solution On Page 10, Attachment 3 (con't), the reference to RMC Medical Kit should be changed to read:
- 63. REMS Corporation Medical Kit
'i C
O.
- J l
IS PROCEDURE REVISloN HEQUIRED Yes No if no, this modification is welid until PREPARED BY DATE Ron Durdel,. Emergency Planning y M ///S3/3I i APPROVED BY / '
f / DATE //
(.4.r.c~~ _ '. , .- (<.4% fr'dYA DATE
. APPROVED / BY ,.6 4 wa f
alu[ lr >
ao) DATE SU{MITTED BY (Section
% dill (2.n s .+/eA*/
D AT E' hdCoMMENDED BY (SRB Chairmen) -
pn &m 1zl9%
cA APPROVED DY (Manager g Cuelity AssNrance) DATE k
APPROVED BY (Station tuperhtendent) DATE
.-;(\d, -
}
p%wm _
_/ c / , /s /
. v