Text
,;.'
L.
rq THE TOLEDO EDISON CCMPANY j
DAVIS-BESSE NUCLEAR PC'4ER STATION N CICY PLAN IMPLEMCITING PROCEDURES q
REVISION DIDEX LJ 7
Ia a
PACE REVISICN PROCEDURES REVISION TD90RARY MODIFICAT.7.1S U
J 1
0 EI 1300.00 1
.I EI 1300.01 2
a EI 1300.02 1
1 ij EI 1300.03 1
EI 1300.04 1
i EI 1300.05 1
!- 'i EI 1300.06 2
EI 1300.07 1
' EI 1300.08 2
T-5849
'5 EI 1300.09 0
EI 1300.10 0
,7
,J EI 1300.11 0
EI 1300.12 1
T-5850 L.
.l O
1 a^
Revision 6
[
December 1981
=
I._
3 8202190447 810211 PDR ADOCK 05000346 PDJ
.e s
\\
p 34 Ot4TRiluTION
^
Or! sinal, Responsible Section Head Action p,0
_ _.,ii.co...M.
rru.
. -lI lj COPIES TO SE MODI, LED FOR IMMEDI ATE IMPLEMENTATION DAVIS-DESSE NUCLEAR POWER STATION. UNIT 1 C&HP Supervisor - 1 Emer. Planning - 3 TEMPORARY MODIFICATION REQUEST Control Room - 2 q
ED 6926 Shift Supervisor - 2 j
SECTION 1 PROCEDURE TITLE AND NUMBER El 1300.08, Emergency Control Center Activation RE ASON,OR CH ANGE
]
To upgrade references to agencies and equipment lists in regard to Emer3ency Control Center Activation and to clarify the location of the E. C. C. (Emergency Control Center).
I I
.J M
U J
CHANGE See attached sheet.
4 ES PROCEDURE REvtSION REQUIRED Yes No if no, this modification is valid until DATE PREPARED 8Y M
///J3/g/
Ron Durdel, Emergency Planning e 1L APPROVED BY
/
./
/e/
DATC,
/l t-e.* s~
/
.sf
=
DATE'
/
/
/.l. Ld d '/-
iltr/T I
/
APPROVED BY f
/
SUBMITTE D BYAsoction Hook DATE k-. t j/?A t's s.1l'.E
///R/f/
DATEI j in m -,(
.2 l+1 en HECOMMENDED BY (SRB Chairman)
OA APPROVED BY (Msnager of unihv A'n[urence)
DATE
'~
t' DATE APPROVED BY (Etation Superint'escent) l*
l
\\
IkW*y
=
. p -.-
5 h
' l r, 9
i j LJ 1
Temporary Modification: EI 1300.08 Emergency Control Center Activation R
,.j On Page 1, Section 5.1, the first sentence should read:
The ECC is located at the Davis-Besse Nuclear Power Station' site, along Ohio State Route 2, in the DBNPS Administration Building.
l 2
On Page 4, Section 5.5.2,d.2, should be changed to read:
[1 ij 2.
REMS Corporation On Page 7, the ECC Equipment Checklist, change the location of the cabinets
'J to read:
- l East Cabinet on South Wall u
On Page 7 of the ECC Equipment Checklist, under Batteries, it should read:
~~
Batteries:
12 Volt 35-102 Booster 1 ea.
"D" Cell, 185 Volt 12 ea.
9-Volt 12 ea.
NEDA 220,~.15 Volts for SK-1 Speakers 12 ea.
il NEDA 15M, 1.4 Volt 2 ea.
Lj "AA" Pen 11tes.
12 ca, r'
l~
On Page 8, the ECC Equipment Checklist, change the location of the cabinets to read:
I' West Cabinet on South Wall L
14 4
~
t r
i.
r
---n.
- - - - - ~,-
-~-
.e r
e - -
~
T R 4;UTI AN
~l iJ Original, Responsible Section Head Actiort i
p File Copy, Meeter File COPIES TO 8E MoOlFIED FoR IMMEDIATE IMPl.EMENTATloN DAVIS BESSE NUCLEAR POWER STATION - UNIT 1 Shift Supervisors Office - 2 l]j TEMPORARY MODIFICATION REQUEST Control Room - 2/ Safety Coordinator - 1 ED 692s Emergency Planning - 3 SECTION 1
[~;
PROCEDURE TITLE AND NUMBER EI 1300.12 Administrative Controls Emergency Plan Implementing Procedure REASON FoR CHANGE To upgrade reference to medical equipment.
r-U b
CHANGE
]
On Page 8, Attachment 2, the reference to Eye Warm Solution should be changed i
to read:
Eye Wash Solution On Page 10, Attachment 3 (con't), the reference to RMC Medical Kit should be changed to read:
63.
REMS Corporation Medical Kit
'i C
O.
J l
IS PROCEDURE REVISloN HEQUIRED Yes No if no, this modification is welid until PREPARED BY DATE Ron Durdel,. Emergency Planning y M
///S3/3I
/
DATE
//
APPROVED BY
/
i f
(.4.r.c~~
_ '.,.- (<.4%
fr'dYA APPROVED BY,.6 4 wa alu[ lr >
DATE f
/
SU{MITTED BY (Section ao)
DATE
% dill (2.n s
.+/eA*/
hdCoMMENDED BY (SRB Chairmen)
D AT E' pn &m 1zl9%
cA APPROVED DY (Manager Cuelity AssNrance)
DATE g
k APPROVED BY (Station tuperhtendent)
DATE
}
.-;(\\d, -
p%wm
_/ c /, /s /