February 11, 1982
.
932 I *~
'
Docket No. 50-315
Docket No. 50-316
REr1E!VED
3
American Electric Power Service
FEB1 eig82hh UE
Co rporation
g;
gg,
s
Indiana and Michigan Electric Company
&
-
ATTN:
Mr. John E. Dolan
"
p
Vice Chairman
8
,;ha
Engineering
2 Broadway
New York, NY 10004
Gentlemen:
This refers to the routine safety inspection conducted by Drs. M. J. Oestmann
and S. Rozak of this office on January 12-15, 1982, of activities at the
Donald C. Cook Nuclear Plant, Units 1 and 2, authorized by NRC Operating
Licenses No. DPR-58 and No. DPR-74 and to the discussion of our findings with
Mr. W. G. Smith and others of your staff at the conclusion of the inspection
and by telephone with Mr. Smith and others on January 22, 1982.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
We are concerned about the extent of your disagreements found in our
comparative measurements as discussed in Paragraph 7 of the enclosed inspec-
tion report.
It is our understanding that you will meet the commitments
stated in the exit interview (Paragraph 8) to improve your capability in
this area. After these are completed, we plan to evaluate your corrective
actions by making additional comparisons.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you (or
your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within ten (10)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
8202190267 820211
-
/m
PDR ADOCK 05000315
d-
W
G
t1
_ _ _ _ _
.
- -
.
.
.
.
American Electric Power Service
-2-
February 11, 1982
Corporation
,
this letter a written application to this office to withhold such information.
!
If your receipt of this letter has been delayed such that less than seven (7)
days are available for your review, please notify this office promptly so that
a new due date may be established. Consistent with Section 2.790(b)(1), any
such application must be accompanied by an affidavit executed by the owner of
the information which identifies the document or part sought to be withheld,
and which contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure. This
,
section further requires the statement to address with specificity the con-
siderations listed in 10 CFR 2.790(b)(4). The information sought to be
withheld shall be incorporated as far as possible into a separate part of the
If we do not hear from you in this regard within the specified
periods noted above, a copy of this letter and the enclosed inspection report
will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
. A. Hind, Director
-
Division of Emergency Preparedness
and Operational Support
i
Enclosure:
Inspection
Reports No. 50-315/82-01
and No. 50-316/82-01
cc w/ encl:
V. G. Smith, Jr. , Plant Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
'
Ronald Callen, Michigan
Public Service Commission
l
L
l
i
l
RIII
RIIp
RII
RIIJ
RIII
RIII
f
Oes//f8
.04'
O
T
k
Sc umacher
Pa
iello
ynd
Spessard
tmann/so
Roz7
2/8/82
Il p
J- y p y-
py
l-
!
_
_
_-
_
_