Public Version of Revision 7 to Emergency Plan Implementing Procedures,Consisting of Temporary Mods,Including Mods T-6014 to Procedure 1300,Station Response to Emergencies & T-6015 to Procedure 1300.02,Unusual Event.
ML20041A098
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/15/1982
From: Durdel R
TOLEDO EDISON CO.
To:
Shared Package
ML20041A091 List:
References
PROC-820115-01, NUDOCS 8202190090
Download: ML20041A098 (6)


Text

%

F; .

Y r

. . THE TCLEDO EDISCN CCMPA .7

/ DAVIS-3 ESSE NUCLE.\R PC'4ER STATIC'i e DECEICY FLAN IMPLEiETTE!G FROCCURES REVISICN EIDEC o

-' PAGE REVISIC'i PROCEURES REVISICN TEMPORARY MODIFICAr NS i 0 EI 1300.00 1 T-6014 EI 1300.01 2 T-6015 EI 1300.02 1 EI 1300.03 1 EI 1300.04 1 1

EI 1300.05 EI 1300.06 2 t'

EI 1300.07 1 T-6016 EI 1300.08 2 T-5849 EI 1300.09 0 EI 1300.10 0 T-6017

. EI 1300.11 0 T-6018

. EI 1300.12 1 T-5850, T-5918 h

O a .

Revision 8  ;

( January 1982 y ' .

l L

i .

3 8202190090 920211 t PDR ADOCK 05000346 PDR g F

DISTRIBUTION original, Responsstile Section Head Action h d[ _ Fire cooY, Master Flie COPIES TO BE MODIFIED FoR IMMEDIATE IMPLEMENTATION JAVIS BESSE NUCLEAR POWER STATION . UNIT 1 2 - Shift Supervisor TEMPORARY MODIFICATION REQUEST 2 - Control Room ED 6k26 1 - Emercency Planning SECTION 1 PROCEDURE TITLE ANO NUYBER EI 1300.00 Station Response to Emergencies RE ASoN FoR CH ANGE To clarify emergency locations and personnel referenced in this procedure.

CHANGE On Page 3, Section 4.13 should read:

4.13 Technical Support Center (TSC) - An area within the owner controlled area, which has the capability to display and transmit Station status information to the individuals who are knowledgeable of and responsible for engineering and management support of reactor operations in the event of an emergency situation.

On Page 10. Section 7.5.2, "c" should read:

c. Gatehouse On Page 12, Section 7.7.5 should read:

7.7.5 Medical Treatment Arrangments for hospital and medical services for injured or contam-inated/over-exposed personnel are provided for by the H. B. Magruder Memorial Hospital, REMS Corporation, the Peter Bent Brigham Hospital in Boston, Mass., and local physicians.

IS PROCEDURE REVISloN REcVIRED Yes No if no, this rnodification is valid untti PREPARED BY " '

,d DATE l Ol H 1)WA2 90ll ** .*ttetA .

" ~

f

  1. # d APPROVED SY cJa. -

~ / ,4*) / "

DATE dt/PL

/

APPROVED BY / ./ / DATE' / *

~

/W _

f ~f

$UBMITTED BY (Section Heed) DATE

  • L kl k %/ 0 !w / Ah "f V II.'$f* Y RECCMMENoED SY (SRB Chairman DATE d f it #5 ^ f , l 1E W1.

DATE Q4 APPROVED SY (Maneqer of Cueelty Assurance)l JY,

/

APP 8toVEo BY (Station Guoerentencent) DATE /

n( %Dy& LL^-- ^ -

m

) / lYh *2

,_s - ;. ..

. . . '- ._ r -

y.'".~...

E -

.. '. . ' 1' t[ .

N '#

M. 'r i ~ k +,y . . . .

Ol%TRIBUTaoN p original, Re,consable Section Head Actson

"[p[/_b _ Fase cooY, Ma,ter Fiie

~.S COPIES To SE MODIFIED FoR IMMEDI ATE IMPLEMENTATION DAVIS BESSE NUCLEAR POWER STATION - UNIT 1 ShifL Supervisor - 2 TEMPORARY MODIFICATION REQUEST Control Room - 2 ED 692s Emergency Planning - 1 SECTION 1 PROCEDURE TITLE AND NUMBE R EI 1300.02 Unusual Event RE A$oN FoR CH ANGE To correctly identify references to Security personnel.

CHANGE Change references to Guard Supervisor to read Nuclear Security Supervisor and change references to Security Guards to read Nuclear Security Officers, and Guard Force to read Nuclear Security.

On Page 2 Section 5.1.3,a should read:

a. Nuclear Security Supervisor On Page 6, Sections 5.7. 5.7.1, and 5.7.2 should read:

5.7 Nuclear Security 5.7.1 The Nuc1 car Security Supervisor shall implement the Industrial Security Plan, AD 1808.00, upon notification of a security threat, attempted un-authorized entry, or attempted sabotage.

5.7.2 Nuclear Security Officers shall maintain security of the Station as

, directed by the Nuclear Security Supervisor.

IS PROCEDURE REVISloN REQUIRED Y es - No It no, this modification is valid until PREPARED BY CATE Ronald R. Durdel ((gf fy/pg/97 APPRGM7(Q S Y e' s D AT F.

D 43 c' a. ~ m _ $ _= ( 1 APPROVED 8Y R jjf

/ / g' OATE/ ' *

(-/= - 3 c-SU8 Me t E O S Y (Section Head) .

DATE AI/ .

RECodMENCED BY (SR S Chairrnin) 4;*d M - - rY U

/ L!J L /

d fn1 -- __-- DATE f f lj g $ j [f l.

QA APPROVED BY (Manager of Quality AssUn'ncel DATE 7

m OATE

< wqAPPRoVED SY (Station Swwwade"b

- - / / / s W .__

0

DI ATH12 U Tion Original. Responsible Section Head Action py 6 _ P ,. .. . . M _ P ,..

\ COPIES TO SE MODIPIED POR IMMEDI ATE IMPLEMENTATION JAVIS 8 ESSE NUCLEAR POWER STATION . UNIT 1 Shift Supervisor - 2 TEMPORARY MODIFICATION REQUEST Control Room - 2 ED eers Emergency Planning - 1 SECTION 1 PROCEDURE TITLE AND NUMBER EI 1300.07, Technical Support Center Activation RE ASON POR CH ANGE To clarify the location of the Technical Support Center (TSC).

CHANGE On Page 1, Section 5.1, the first sentence should read:

5.1 The TSC is located at the Davis-Besse Nuclear Power Station site, along Ohio State Route #2, in the Davis-Besse Nuclear Power Station Administration Building.

IS PROCEDURE REVISloN REQUIRED PREPARED 8Y DATE Ronald R. Durdel. Emergency Planning n 2 /2/JA / 7I APPROyEQ BY - 2 / ,a DATE .

<-% - [

,. ., % / Q APPRo D SY / g / D AT8'

  • b ,-

/ " /t

  1. E~

SU8MITTED BY (Seuion Headt DATE

^'

_ ?A '-  ? - M l l5 i RECOMMENDED BY (SRS Chaerreen) DATE '

l .8 Y%? -

0 l CA APPROVED SY (Manager of Quaalt[ Assurance) /' DATE A//A OATE 8 g+, APPROVEo BY (Station Supenamedent)Ta ir - W J//c/h "

)I

.)ffh.fkh&WWW

, je f. h&fN :l k)NW*

. -- ,cw l

otSTRIBUTioN .. f Original Responsible Sedeon Head Act%n

_ File Copy, Mastov File CoPICS TO BE MoOlFIED Po9 iMMEDIATE IMPLEMENTATioh JAVIS BESSE NUCLEAR POWER STATION . UNIT 1 Shift Supervisor - 2 TEMPORARY MODIFICATION REQUEST Control Room - 2 ED 8* Emergencv Planning - 1 SECTION 1 PROCEDURE TITLE AND NUMBER EI 1300.10, Reentry RTson PoR cH ANcE To correctly identify references to TECo personnel responsible for coordinating Reentry.

CHANGE Change references to Recovery Director to read Engineering Support Director in the following areas:

On Page 1. Section 5.1.1 and 5.1.2 should read:

5.1.1 The TECo Engineering Support Director shall develop, coordinate and expedite plans and schedules for the reentry.

5.1.2 The Company Nuclear Review Board (CNRB) shall oversee the activities of the Engineering Support Director, and the Operations Director, to assure that all nuclear safety aspects of the operations are satisfied.

On Page 2, Section 5.3 should read:

5.3 The Engineering Support Director and Operations Director shall determine the priority requirements and assure performance of the following activities through coordination with the Station Operations Manager.

l 13 PROCEDURE REvlsioN REQUIRED Y es a No if no, this modification is valld until PREPAREO SY DATE Ronald R. Durdel Emergency Planning cn MM /7/J2/7/

APPR6bE D BY , / DATE . /

+m~ b- d$ - . > / , / !, L APPROVED BY /

/ DATE a

.,/ f * / *w a -

SU8WTTED BY (Section >+eso) DATE LN .tMb /Yn & ^ ) 2V l RECOMMENDED BY (SRS CPairman) DATE 7 8 9bs & 4 I.Sfn.

Q A APPROVED BY (Manager of oueury Assurancel OATE

/f/ I' A DATE N$

y,-

qO APPROVED sY iSiation suo.emeeaoe-tU u

y l // rla n--

- 1, ew+rm.= - +w

. ,C.

DISTRIBUTION Originas, Responsit>le Section Head Action h, _ File Copy, Master File COPIES To BE MoOlFIED FoR IMMEDI ATE IMPLEMENTATION  !

DAVIS BESSE NUCLEAR POWER STATION . UNIT 1 2 - Shift Supervisor TEMPORARY MODIFICATION REQUEST , 2 - Control Room l

ED esza 1 - Emergency Planning SECTION 1 PROCEDURE TITLE AND NUMBER EI 1300.11, Recovery RE ASoN FoR CH ANGE To correctly identify references to TECo personnel response for coordinating Recovery.

l l

CHANGE Change references to Recovery Director to read Engineering Support Director in the following areas:

On Page 1 Section 5.1.2, should read:

5.1.2 Plant and TECo personnel have been assigned activities under the direction of the Emergency Duty Officer through approval of the Engineering Support Director and Operations Director.

On Page 2, Section 5.3.2 and 5.3.3 should read:

5.3.2 Compliance with the limits shall be the responsibility of the Engineering Support Director through the Chemist and Health Physicist, 5.3.3 Recovery operations that may result in the release of radioactive materials shall be evaluated by the Engineering Support Director and his staff as far in advance as possible.

15 PROCEDURE REVISloN REQUIRED Yes i No if *1o, this modification is valid until k PAREOSY DATE Ronald R. Durdel, Emercency Plannine /f au / 2 / .2 E /7 /

APPFlQVED 8,Y DATE /p

/

f

[ i: . 7 .% -' M - ,!

/ /42 2_.-

APPR ED SY -

/

  • DATE,/

SUBMIT'EO SY (Sectpn Head) DATE

  • *  !<Y dsQU h -^

^f\ /5"b$

AICoMMENoED B) ISHS Chairman) DATE u w w_ g; s ja sjn.

QA APPROVED BY (Manager of Quasity AEsurance) DATE A/ /r 4

/ OATE t al

$ APPROVED BY (Station Supenntenoset)mm m U i h wi=-