OPERATING DATA REPORT DOCKET NO. 050-0325 DATE 02/01/82 COMPLETED BY FRANCES HARRISON TELEPHONE 919-457-9521 OPERATING STATUS

1. UNIT NAME: BRUNSWICK UNIT 1 I NOTES I
2. REPORTING PERIOD: JANUARY 82 I I
3. LICENSED THERMAL POWER (MWT): 2436 I I
4. NAMEPLATE RATING (GROSS MWE): 867.0 I I
5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I I
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I
7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 -------------------------------
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 744.0 744.0 42745.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 29009.3
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1647.1
14. HOURS GENERATOR ON LINE 744.0 744.0 27283.6
15. UNIT RESERVE SHUTDOWN HOUR 5 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1688996.2 1688996.2 56106800.9
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 538864.0 538864.0 18540069.0
18. NET ELECTRICIAL ENERGY GENERATED (MWH) 522086.0 522086.0 17825577.0
19. UNIT SERVICE FACTOR 100.0 100.0 63.8
20. UNIT AVAILABILITY FACTOR 100.0 100.0 63.8
21. UNIT CAPACITY FACTOR (USING MDC NET) 88.8 88.8 52.8
22. UNIT CAPACIT) FACTOR (USING DER NET) 85.5 85.5 50.8
23. UNIT FORCED OUTAGE RATE 0.0 0.0 21.5
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATER AND DURATION OF EACH):

SNUBBERS 2/5/82 192 HOURS

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 0/ O/ 0
26. UNIT 5 IN TEST STATUS (PRIOR TO COMMERICIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY -------- --------

INITIAL ELECTRICITY -------- --------

COMMERICIAL OPERATION -------- --------

1.16 - 9 8202180279 g h 4 PDR ADOCK PDR R

w

1 -

APPENDIX B AVERAGE DAILY POWER LEVEL.

DOCKET NO. 050-0325 UNIT BRUNSWICK UNIT 1.

DATE 02/01/82 COMPLETED BY FRANCES HARRISON TELEPHONE 919-457-9521 JANUARY 82 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER' LEVEL

'(MWE-NET) (MWE-NET) l' 754. 17 756.

2 752. .18 682.

3 751. 19 750.

4 750. 20 510.

5 746. 21 123.

.6 745. 22 616.

7 741. 23 708.

8 695. 24 731~.

9 531. 25 752.

10 756. 26 729.

11 754. 27 744.

12 758, 28 742.

13 756. 29 741.

14 754. 30 727.

15 753. 31 738.

16 708.

1.16 - 8 i

.=- .. -, , . , ..- .. ..

a 4

APPENDIX-Docket No: 050-325

Unit: B runswick - No.' ; 1 Date: January 1981  ;

Completed By: Frances Harrison

OPERATIONS

SUMMARY

BRUNSWICK UNIT.NO. 1-i

. Brunswick Unit No.'l operated at_100 percent availability-factor for the month j 'of January with an 88.8 percent capacity factor.

i There are 476 BWR and 160' PWR spent fuel bundles in the Brunswick Unit No. 1 fuel pool.

I i

i t

t s.

I t

?.

t i

i l

i-i l

OPERATING DATA REPORT DOCKET NO. 050-0324 DATE 02/01/82 COMPLETED BY FRANCES HARRISON TELEPHONE 919-457-9521 GPERATING STATUS

1. UNIT NAME: BRUNSWICK UNIT 2 I NOTES I
2. REPORTING PERIOD: JANUARY 82 I I '
3. LICENSED THERMAL POWER (MWT): 2436 I I-
4. NAMEPLATE RATING (GROSS MWE): 867.0 I I
5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I I
6. MAX DEPENDABLE CAPACITY (CROSS MWE): 815.0 I I
7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 -------------------------------
8. IF CHANCES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 744.0 744.0 54769.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 521.9 521.9 35688.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON LINE 475.4 475.4 33244.7
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 866323.0 866323.0 60863860.6
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 275890.0 275890.0 20269827.0
18. NET ELECTRICIAL ENERGY GENERATED (MWH) 264231.0 264231.0 19453644.0
19. UNIT SERVICE FACTOR 63.9 63.9 60.7
20. UNIT AVAILABILITY FACTOR 63.9 63.9 60.7
21. UNIT CAPACITY FACTOR (USING MDC NET) 45.0 45.0 45.0
22. UNIT CAPACITY FACTOR (USING DER NET) 43.3 43.3 43.3
23. UNIT FORCED OUTAGE RATE 35.9 35.9 17.4
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

REFUELING 4/27/82 1750 HOURS

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: O/ O/ 0
26. UNITS IN TEST STATUS (PRIOR TO COMMERICIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY -------- --------

INITIAL ELECTRICITY -------- --------

COMMERICIAL OPERATION -------- --------

1.16 - 9

1 -

APPENGIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0324 UNIT BRUNSWICK UNIT 2

.DATE 02/01/82 COMPLETED BY FRANCES HARRISON TELEPHONE 919-457-9521 JANUARY 82 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 685. 17 46.

2 681. 18 472.

3 680. 19 504.

4 670. 20 186.

5 662. 21 -12.

6 658. 22 -il.

7 580. 23 -12.

8 575. 24 -12.

9 605. 25 -12.

10 540. 26 -11.

11 593. 27 -11.

12 564. 28 -2.

13 272. 29 387.

14 -12. 30 511.

15 357. 31 513.

16 364.

1.16 - 8

APPENDIX Docket No: 050-324 Unit: Brunswick No. 2 Date: January 1931 Completed By: Frances Harrison OPERATIONS

SUMMARY

BRUNSWICK UNIT NO. 2 Brunswick Unit No. 2 operated at 63 percent availability factor for the month of January with a 45.0 percent capacity factor. There were three off-line outages this month. They are detailed in Appendix D, the unit shutdowns and power reduction log.

There are 264 BWR and 144 PWR spent fuel bundles in the Brunswick Unit No. 2 fuel pool.

9 O O O .

DOCKET NO. 050-0325 UNITSHUTDOWNS AND POWER REDUCTIONS UNIT NAME Brimwick 2 DATE February 1982 January 1892 COMPLETED BY Fenn~e n,vv f emi REPORT MONT11 TELEPilONE (0101457 05'1 r.

- E e

, .! E 3 y .E 5 Licensee Eg g *. Cause & Currective '

No. Date g 3 s 2g5 Event g'g A. Action to g]

i j ~g g W 5 jgg Report # mu Prevent Recurrence 6

e 12-008 820113 F 38.5 A 3 NA CB PUMPXX Rx scram-Recire. Pump Runaway.

Checked operation of 2A scoop tube positioner l1S/V converter and control loop. Also inspected feedback tach

  • brushes /ccmmutator.

I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions '

S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance or Test 2. Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG -

D. Regulatory Restriction 0161) tr Opciatos Tealning & IJecuse lixamination l-Continuations i ,

12 Administrative 5-Load Reductions . 5 G-Operational Error (Explain) 6-Other Exhibit 1. Same Source (9/77) Il-Other (Explain)

O O O DOCKETNO. n50-019s c UNITSHUTDOWNS AND POWER REDUCTIONS Brunswick 2 UNIT N AME February 1982 DATE COMPLETED BY Francos 1brricon REPORTMONUf Jan'orv 19R2 TELEPilONE t919)457-4521 w.

- E c

- .] g 3 yY3 Licensee ,Eg ge., Cause & Corrective ,

No. Date g 3 Ej $ 2ss Event p Action to H

$~ 5 jgg Report # mu g{ Prevent Recurrence 6

32-010 82/01/16 F: 25.1 *H 3 NA IB INSTRU I&C replaced SJAE low pressure switch 2'-MS-PSL-890.

Replaced FU3 in cabinet J17 to restore SJAE Logic. Complete installation of*

new switch as per plant mod which upgrades pressure capacity of switch.

l l

I 2 ~3 4 f Method: Exhibit G-Instructions -

i F: Forced Reason: '

l S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG -

D Regulatory Restriction 0161)

Itopeiaim Tiaining & l.icense lixamination 4-Continuations I Administ ative 5-Load Reductions 5 G-Operational Error (Explain) 6-Other Exhibit 1 Same Source

- 19/77) Il-Other (Explain)

UNIT SliUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0325 .

UNIT NAME Brunswick 2 DATE Februarv 1982 January 1982 COMPLETED BY Frances Harrison REPORT MONTil TELEPHONE (919)457-9521 m

- E E

, 5g 3 yY3 Licensec g r, gvl, Cause & Corrective No. Date g 5g il .3 s & Event gg mo g3O Action to H

$E $ Repor: # o Prevent Recurrence 3 5 =!

e u c5 82-012 820120 F 205.0 H 3 NA IE INSTRU 'libration on scram discharge volume level switches during pipe hanger mod caused scram. ,

Jorkers were told to finish hanger mod an switches while unit was down. No aork on hangers by the switches if' unit is up.

I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions

  • S: Scheduled A-Eauipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C Refueling 3-Automatic Scram. Event Report (LER) File (NUREG.

D Regulatory Restriction 0161) 4-Continuations 1 Operator Tiaining & License Examination

F Administrative 5-Load Reductions 5 G. Operational Error (Explain) 6-Other Exhibit I Same Source 19/77) 11-01her (Explain)

( .