Interim Deficiency Rept Re GE Part 21 Rept on Type Hma Auxiliary Relays Having Excess Uninsulated Flexible Leads, Initially Reported 820105.Bechtel Will Obtain Replacement Relays from Ge.Next Rept by 820706
ML20040H300
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/03/1982
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-20078-GHD, DER-81-57, NUDOCS 8202180055
Download: ML20040H300 (3)


Text

-

l J

.[

1.Pd.Ts31ED EEGIf.RFJUDIs CC@hTR185SW M3&BNM P. O. D OX 216 6 6 PHOENIX, ARIZON A 85036 February 3, 1982 ANPP-20078-GHD/BSK G

co U. S. Nuclear Regulatory Commission

[

Q Region V ro 1450 Maria Lane, Suite 210

_y y

Walnut Creek, California 94596-5368 T"

co

..a e

Attention:

Mr. B. H. Faulkenberry, Chief Reactor Construction and Engineering Support Branch a

LO

Subject:

Interim Report - DER 81-57 A 50.55(e) Potentially Reportable Deficiency Relating to G. E. 10CFR21 Report on Type 1"'A Auxiliary Relays d).2-W{,,,/ /

Having Excess Uninsulated Flexf hi-Leads Which could Cause Short Circuits

/

' Q.

Of Q

File:

82-019-026

_/

7

. ! ; y,,3..

(Q<

D.4.33.2

-l

/0 5

n

,.x

'O

Reference:

Telephone Conversation between Bob Dodds and George Duckworth on January 5, 1982 (DER 81-57)

',6 y

C NA t

  1. 'di [I

Dear Sir:

The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days.

Due to the extensive investigation and evaluation required, an Interim Report is attached.

It is now expected that this informa-tion will be finalized by July 6, 1982, at which time a complete report will be submitted.

Very truly y /urs b/hu CtLL E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects ANPP Project Director EEVB/CHD:Jom Enclosure cc:

see attachment

\\Eyj 8202180055 820203 PDR ADOCK 05000 g

snss

,- T

~~

l(.

~

U. S. Nucitsr R5guldtery Commission

' ~ '

' Attention:

Mr. B. H. Faulkenberry, Chief

. February 3, 19r2

ANPP-20078-GHD/BSK Page 2 l

cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 J. A. Roedel D. B. Fasnacht

. G. C. Andognini F. W. Hartley J. M. Allen A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Ms. Patricia Lee Hourihan 6413 South 26th Street Phoenix, Arizona 85040

i e

~

INTERIM REPORT - DER 81-57 POTENTIAL REPORTABLE DEFICIENCY

~ RIZONA PUBLIC SERVICE COMPANY (APS)

A PVNGS UNITS 1, 2 and 3 l

i l

I.

POTENTIAL PROBLEM Pursuant to a General Electric 10CFR Part 21 Report, Bechtel has-

'been notified that.some of the type HMA auxiliary relays manufactured 4

from 1976 through June 1981 may have the following problem:

The length of-the uninsulated flexible leads connected to the move-able contacts exceeds the allowable dimensions and can result in reduced spacing between the leads and the coil circuits. This condition introduces the possibility of circuit connection between the flexible leads or the HMA contact-circuits and the adjacent coil circuit-terminals.

Bechtel Engineering has determined that the identified HMA relays may have been installed in safety related switch gear, load centers, and AC distribution panels, plus other non-safety related equipment.

i II.

APPROACH.TO AND STATUS OF PROPOSED RESOLUTION-Bechtel Engineering will provide Bechtel Contruction with a detailed list of equipment to inspect for these relays. Bechtel Construction to initiate Nonconformance Reports as applicable and obtain replace-ment relays from the General Electric Field Representative to facilitate the necessary replacements.

III.

PROJECTED COMPLETION OF CORRECTIVE ACTION AND SUBMITTAL OF THE I

FINAL REPORT Evaluation of this condition and submittal of the Final Report is forecast to be completed by July 6, 1982.

i

-.,