Forwards Amend 46 to License DPR-61 & Notice of Issuance. Amend Modifies License to Require Maint of Commission Approved Guard Training & Qualification Program
ML20040H277
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 01/29/1982
From: Crutchfield D
Office of Nuclear Reactor Regulation
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20040H278 List:
References
LSO5-82-01-075, LSO5-82-1-75, NUDOCS 8202180034
Download: ML20040H277 (4)


Text

__

o UNITED STATES hh

~

ne ug

~.

g 8

NUCLEAR REGULATORY.dOMMISSION o

g E

WASHINGTON, D. C. 20555

,/

e-c l r m January 29, 1982

-Docket No. 50-213 S

EUED 9

g

,FE83 793 LS05-82-01-075 W

y 'll y

Mr. W. G. Counsil, Vice President 4

b Nuclear Engineering and Operations N

Connecticut Yankee Atomic Power Company Post Office Box 270 -

Hartford, Connecticut 06101

Dear Mr. Counsil:

SUBJECT:

GUARD TRAINING AND QUALIFICATION-PLAN - HADDAM NECK PLANT The Commission has issued the enclosed Amendment No. 46 to Facility Operating Licensing No. DPR-61 for the Haddam Neck Plant in response to your submittals dated March 31, 1981 and November 17, 1981.

l

.The amendment modifies License No. DPR-61 to include a requirement to maintain a Guard Training and Qualification Plan to be fully implemented in accordance with 10 CFR 73.55(b)(4) within 60 days after this approval by the Commission. All security personnel sh&ll be qualified withinitwo years of this approval.

We have completed our review and evaluation of the Haddam Neck Guard Training and Qualification Plan and have concluded that the plan, when fully implemented, will meet the requirements of 10 7,cR 73.55(b)(4) and Appendix B to 10 CFR 73. We, therefore, further conclude that this Plan is acceptable.

Changes which would not decrease the effectiveness of the approved Guard Training and Qualification Plan may be made without approval by the Commission pursuant to the authority of 10 CFR 50.54(p).

A report con-taining a description of each change shall be furnished to the Director, Office of Nuclear Reactor Regulation, U. S. Nuclear Regulatory Commission, Washington, D. C.

20555, with a copy to the appropr.iate NRC Regional Office within two months after the change is made. Records of changes made without Commission approval shall be maintained for a period of two years from the date of the change.

This amendment applies to the Guard Training and Qualification Plan and, therefore, does not authorize a change in effluent types or total amounts or an increase in power level, and will not result in any significant environmental impact.

Having made this determination, we have further 8202180034 820129

~

PDR ADOCK 05000213 P

PDR

o

<o e

co o

Mr. W. G. Counsil January 29, 1982 concluded that this amendment involves an action which is insignificant from the standpoint of environmental impact and pursuant to 10 CFR Sl.5(d)(4) that an environmental impact statement, or negative declaration and environ-mental impact appraisal need not be prepared in connection with the issuance of this amendment.

Since the amendment adds a license condition to include the Commission-approved Guard Training and Qualification Plan to the license, it does not involve a significant increase in the probability or consequences of an accident, does not involve a significant decrease in a safety margin and, therefore, does not involve a significant hazards consideration. We have also concluded that there is reasonable assurance that the health and safety of the public will not be endangered by this action and that the issuance 'of this amendment will not be 'nimical to the common defense and security or to the health and safety of the public.

We will continue to withhold your Guard Training and Qualification Plan and related materials from public disclosure in accordance with the provisions of 10 CFR 2.790(d).

A copy of the Notice of Issuance is also enclosed.

Sincerely, ORIGINAL SIGNED BY DENNIS M. CRUTCHFIELD, Dennis M. Crutchfield, Chief Operating Reactors Branch #5 Division of Licensing

Enclosures:

DISTRIBUTION:

1.

Amendment No. 46 to Dockst D OELD

'x License No. OPR-61 NRC PDR 01&E 2.

Notice of Issuance LPDR ACRS (10)

NSIC GDeegan (f)

"gp cc w/onclosures:

ORB #5 RF

-BScherf-g.

See next page Glainas TMichaels CTropf Xtra Cy (3) l HSmith (2)

RDiggs

()

omcc> DL 23 5/LA DL : 0RB#5./.

'0 ELD DL:0'

h /..S..A...

2 l,j CTropf,f')(ii2"~

~g""fyjfi" " " %"JGjft" " "}" */f78T sunuwe) ~H t g.

y DCrui d GL as

.-.. J./.82

....../.l..c(..........

l

,e )

NRC FORM 318 (10-80) NRCM 024o OFF1CIAL RECORD COPY usovo. mi_ m ua

~

Mr. W. G. Counsil 2-January 29, 1982 concluded that this amendment involves an action which is insignificant from the standpoint of environmental impact and pursuant to 10 CFR 51.5(d)(4) that an environmental impact statement, or negative declaration and environ-mental impact appraisal need not be prepared in connection with the issuance of this amendment.

Since the amendment adds a license condition to include the Commission-approved Guard Training and Qualification Plan to the license, it does not involve a significant increase in the prcbability or consequences of an accident, does not involve a significant decrease in a safety margin and, therefore, does not involve a significant hczards consideration. We have also concluded that there is reasonable assurence that the health and safety of the public will not be endangered by this action and that the issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public.

We will continue to withhold your Guard Training and Qualification Plan and related materials from public disclosure in accordance with the provisions of 10 CFR 2.790(d).

A copy of the Notice of Issuance is also. enclosed.

Sincerely,

,uu-Dennis M. Crutchfield, hief Operating Reactors Branch #5 Division of Licensing

Enclosures:

1.

Amendment No. 46 to License No. DPR-61 2.

Notice of Issuance cc w/ enclosures:

See next page n

e

j Mr. W. G. Counsil January 29, 1982 cc w/ enclosures:

Day, Berry & Howard Counselors at Law One Constitution Plaza Hartford, Connecticut 06103 Superintendent Haddam Neck Plant RFD #1 Post Office Box.127E '

East Hampton, Connecticut 06424 Mr. Richard R. Laudenat Manager, Generation Facilities Licensing Northeast Utilities' Service Company P. O. Box 27.0 Hartford, Connecticut 06101 Russell Library 119 Broad Street Middletown, Connecticut 06457 Board of SeIectmen Town Hall Haddam, Connecticut 06103 Connecticut Energy Agency ATTN:

Assistant Director Research and Policy Devel opment Department of Planning and Energy Policy 20 Grand Street Hartford, Connecticut 06106 U. S. Environmental Protection Agency Region 1 Office ATTN:

Regional Radiation Representative JFK Federal Building j

Boston, Massachusetts 02203 Resident Inspector Haddam Neck Nuclear Power Station c/o U. S. NRC East Haddam Post Office East Haddam, Connecticut 06423 Ronald C. Haynes, Regional Administrator Nuclear Regulatory Commission, Region 1 Office of Inspection and Enforcement 631 Park Avenue King of Prussia, Pennsylvania 19406

. -. - -