ML20040H268
| ML20040H268 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 02/01/1982 |
| From: | Varga S Office of Nuclear Reactor Regulation |
| To: | Clayton F ALABAMA POWER CO. |
| References | |
| IEB-79-01B, IEB-79-1B, NUDOCS 8202180026 | |
| Download: ML20040H268 (3) | |
Text
l
.4, k'
DISTRIBUTION Docket File NRC PDR Local PDR TERA
,e FEB 1 1982 NSIC
/
9 Docket lio. 50-364 ORB 1 File C
't2CEgygq p
D. Eisenhut 9
Qgg OELD IE (3)
T#
79826
~
lir. F. L. Clayton ACRS (10) c, Senior Vice President E. Reeves Alabama Power Company C. Parrish
/
4 Post Office Box 2641 M. Williams g
g Birmingham, Alabama 35291 Gray File
Dear {lr.Clayton:
SUBJECT:
ENVIRONMENTAL QUALIFICATI0fi 0F SAFETY-RELATED ELECTRICAL EQUIPMENT JOSEPH M. FARLEY HUCLEAR REQUEST FOR ADDITIONAL INFORIMTION PLANT, UllIT N0. 2 We have completed a preliminary review of your response to our Safety Evaluation concerning the Environmental Qualification (EQ) of Safety-Related Electrical Equipment. Our contractor (Franklin Research Center) has identified information, in most cases referenced from your submittals, which we need in order to complete our review. This information should all be contained in your EQ central file.
For this purpose, the requested information can be taken from your EQ central file and provided to our contractor. Upon completion of the review the infor-mation will be returned to you for replacement into the EQ central file.
We request that you supply the information identifed in the enclosure to i
Franklin Research Center within 30 days of the date of this letter. flote that four of the items requested were previously requested for Unit No.1 by my letter dated January 19, 1932.
Please refer to your previous response if documents have been provided previously.
Please send a full submittal to Franklin Research Center (address in the Enclosure) and the original cover letter to us.
Address the letter to Operating Reactors Branch tio.1. Please contact the NRC Project Manager, Ed Reeves, if further assistance is needed in this regard.
The reporting and/or recordkeeping requirements contaired in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under a
58S P.L.96-511.
88 gg Sincerely, a
E
$8 88 Steven A. Varga, Chief 7
Operating Reactors Branch No. 1 gg Division of Licensing ma.a.
l
Enclosure:
1 Request for Additional
- w. 3 Information
....O..R..B.
- 1..
omcap
.~.E,x _;_,,M, __1, Liam,.
a _._.
l SURNAMEh..CG.W/enGIOS000 t- ~~~.-~.
...S" !gg,t,pa.g,,,,,,,,,,,,,,,,,,,,,,,,,,,1,/pp,82,,,,,,,,,,1 f,
- 32......
oury
- unc ronu m po+n wacu ona OFFICIAL RECORD COPY usceo. mi-m-om
,e t-4 Mr. F. L. Clayton, Jr.
Alabama Power Company cc: Mr. W. O. Whitt Executive Vice President Alabama Power Company Post Office Box 2641 Birmingham, Alabana 35291 Ruble A. Thomas, Vice President Southern Company Services, Inc.
Post Office Box 2525 Birmingham, Alabama 35202 George F. Trowbridge, Esquire Shaw, Pittman, Potts and Trowbridge 1800 M Street,.N.W.
Washington, D. C.
20036 Robert A. Buettner, Esquire Balch, Bingham, Baker, Hawthorne, Williams and Ward Post Office Box 306 Birmingham, Alabama 35201 George S. Houston Memorial Library 212 W. Burdeshaw Street.
Dothan, Alabama 36303 Resident Inspector U. S. Nuclear Regulatory Commission Post Office Box 24-Route 2 Columbia, Alabama 36319 Mr. R. P. Mcdonald Vice President - Nuclear Generation Alabama Power Company P.O. Box 2641 Birmingham, Alabama 35291 i
l l
- y r
REQUEST FOR ADDITIONAL INFORMATION
]
EQUIPMENT ENVIRONMENTAL QUALIFICATION JOSEPH M. FARLEY NUCLEAR PLANT,~ UNIT NO. 2 This request for additional infonnation is the result of an evaluation of the information provided by APCo letters dated September 12, 1980 and July 1, 1981.
Please provide the following information to:
Mr. Cyril J. Crane Franklin Research Cunter The Parkway at Twentieth Street Philadelphia, Pennsylvania 19103 1.
Provide a legible single copy ~ of each of the following qualification
~
documents:
a.
General Electric Company report, Low voltage Electrical Containment Penetration Qualification Test Report 4
l
- b.
Wyle Lab's. NEQ Test Report 44354-1 dated 3/8/79
{
Boston Insulated Wire and Cable Co. Test Report c.
73E062 da,ted 9/7/73
- d.
Boston Insulated Wire and Cable Co. Test Report' 74A023 dated 1/24/74 4
e.
NAMC0 Test, Report dated November 21, 1977 i
- f.
The Okonite Co. Engineering Report 143 dated 3/20/72 g.
Bechtel/ GEMS Telecon of 4/3/80 h.
Wyle Qualification Plan No. 545/0859/ES for Level l
Transmitters for Deleval GEMS Sensors Division l
dated 10/6/78 l
i.
Joy Manufacturing Company Report X-501
- j.
WCAP 7820, Supplements 1-4 1
k.
Delete item was received January 1, 1982 1.
Joy Manufacturing Company Report X546 m.
WCAP 9885
~
n.
NAMC0-Test Report QTR-105 dated August 28, 1980 o.
Okonite Co. ' Engineering Report No. N-1 dated July 3,1978 l
p.
WCAP 9985 f
- These documents were requested for Unit 1 review by NRC-(Varga) letter
. dated. January 19, 1982.
~.
.