ML20040H175
| ML20040H175 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 02/08/1982 |
| From: | Mardis D FLORIDA POWER CORP. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| 3F-0282-06, 3F-282-6, NUDOCS 8202170387 | |
| Download: ML20040H175 (1) | |
Text
~.-
^:Yf a
M Power coneoan o=
C D
February 8,1982 O
- 3F-0282-06
,gODPgp }
File: 3-0-3-a-3 y
FEBj 0198 hQ T*
Mr. Harold R. Denton, Director Office of Nuclear Reactor Regula 'cn U.S. Nuclear Regulatory Commission 4
Washington, D.C. 20555
/g
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Semiannual Effluent and Waste Disposal Report
Dear Mr. Denton:
Appendix B of the Crystal River Unit 3 Technical Specifications requires Florida Power Corporation to prepare and submit a report on radioactive discharges released from the site, during the prior six months, within sixty (60) days of January 1 and July I each year. Due to a malfunction of the meteorological magnetic data recording equipment, meteorological data necessary to complete the effluent report must be obtained from strip chart recordings. Since this data reduction is not expected to be complete before late April,1982, Florida Power Corporation est mates the earliest the next Semiannual i
Effluent and Waste Disposal Report can be subinitted is June 1,198'?. Efforts to repair and maintain the magnetic recording system have been initiated.
Your concurrence with this schedule is requested.
If you have any questions, please contact this office.
Very truly yours, mdL David G. Mardis Acting Manager t'uclear Licensing DGM:mm cc:
Mr. J. P. O'Reilly, Regional Administrator Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 A ob Atlanta, GA 30303 L
8202170387'820208
~
~~
PDR ADOCK 05000302 R
.PDR General Office 3201 Tnerty-fourin sire.: souin. P O. Box 14042. st. Petersburg Fionda 33733 e 813-866-5151
,-