From: Alden W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20040H030 List:
References
NUDOCS 8202170032
Download: ML20040H032 (9)


Text

__

. DOCKET NT. 50 - 277

. . DATE FEBRUARY 11, 1982 C05PLITED BY PHILADELPZIA ELECTRIC C05PANY W.5.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION . ,

GENERATION DIVISION-NUCLEAa TELEPHONE (215) 841-5022 ~

OPERATING STATUS

1. UNIT MARE: PEACH BOTT05 UNIT 2 l NOTES: UNIT 2 EXPERIENCED 1 g g,
2. REPORTING PERIOD: JANUARY, 1982 l ONE OUTAGE. l

......___ ..... .___...... g

3. LICENSED THERRAL POWER (NWT): 3293 l l

___ ..._... ____ g .;

4 NA5EPLATE RATING (GROSS ANE): 1152 i L

___.._____.....  ; g

5. DESIGN ELECTRICAL BATING (NET BWE): 1065 l l

____.. _. g  ;

6. MAYIBUS DEPENDABLE CAPACITY (GROSS BWE): 1098 l t l l
7. 5&IIBUR DEPENDABLE CAPACITY (NET BWE)s 1051 I t
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITERS MUR3ER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONSt
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET NWE):
10. REASONS FOR RESTRICTIONS, IF ANY:

THIS 50 NTH YB-TO-DATE CURULATIVE

11. HOURS IN REPORTING PERIOD 744 744 66,432
12. NUMBER OF HOURS REACTOR WAS CRITICAL 724.8 724.0 50,463.2,
13. REACTOR RESERVE SHUTDOWN HOUkS 0.0 0.0 C.0
14. HOURS GENERATOR ON-LINE 711.2 -711.2 49,167.7
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERNAL ENERGY GENERATED (HWH) 1,956,134 1,956,134 143,179,450
17. GROSS ELECTRICAL ENERGY GENERATED (BWH) 628,630 628,530 47,132,400 '
18. MET ELECTRICAL ENERGY GENERATED (HWH) 604,812 604,812 .45,195,547
19. UNIT SERVICE FACTOR 95.6 -

95.6 74.0

20. UNIT AVAILABILITY FACTOR 95.6 95.6 .

74.0-

.......__... ............ e-

21. UNIT CAPACITY FACTOR (USING BDC NET) 77.3 77.3 04.7
22. UNIT CAPACITY FACTOR (USING DER NET) 76.3 76.3 '
  • 6 3~.9
23. UNIT ?ORCED OUTAGE RATE 4.4 4.4~ 8.1-
24. SHUTDOWNS SCHEDULED OVER NEIT 6 RONTHS (TY PE, DATE, AND DURATION OF EACH) :

REFUELING /AAlb7ENANCE, STARTS 2/20/82, FOURTEEN WEEKS e

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTI5ATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO C055ERCI AL OPERATION) : FORECAST ACHIEVED -

INITIAL CRITICALITY IMITIAL ELECTRICITY 0055ERCIAL OPERATION '

J B202170032 820211 PDR ADOCK 05000277 -

R PDR -

OPERATING DATA DEPORT

.e '

e

j. DOCKET NO. 50 - 278 DATE FEBRUARY 11, 1982 COMPLETED BY PHILADELPHIA ELECTRIC CORPANY

' ;s W.H.ALDEN

, ENGINEER-IN-CHARGE a s NUCLEAR SECTION GENERATION DIVISION-NUCLEAR i

TELEPHONE (215) 841-5022 OPERATING STATUS

1. UNIT NAEE: PEACH BOTToa UNIT 3 l NOTES: UNIT . EXPERIENCED l

- - - - ______. ~ ...__..... g

' l

2. REPORTING PERIOD: JANUARY, 1982 l THREE POWER REDUCTIONS. l

.__. ___.... ....__ . g g

3. LICENSED THEREAL POWEE(sWT) : 3293 l l

____....__ _ ... g l

4. NA8EPLATE EATING (GROSS ENE) : 1152 l l

__..........___ g 5.,DESIGM ELECTRICAL RATIN3 (NET ENE): 1065 l l

-....- . g l

6. HAIIBU5s DEPENDABLE CAPACITI (GROSS NWE): 1098 l l

_... g g

7. BAXIE,UM D2PE80&BLE CAPACITY (NET RWE): 1035 l l
3. IF CHANGES , OCCUR IN CAPACITI d& TINGS (ITERS MUERER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS 9.-POWER LEVEs,TO 'WHIUR RESTRICTED, IF ANY (NET ENE):
10. REASONS FOR RESTRICTIONS, IF AkY:

' ~ '

THIS 50 NTH YR-TO-DATE CUNULATIVE

11. HOURS (Ik RgPORTING PEkIOD 744 744 62,328 s 12. NUMBER OF HOU2S REACTOR WAS CRITICAL 744.0 744.0 46,231.4
13. REACTOR RESERVE SHUTDOWN HOURS 0$0 0$0 0$0 L 14. HOURS GENERATOR ON-LIN'E' 744.0 744.0 44,970.8

~

15.-UNIT RESERVE SHUTDOWN E0Uas 0.0 0.0 0.0

16. GROSS TBStuAL ENERGY GENERATED (8WH) 2,378,246 2,378,246 129,069,768
17. GROSS ELECTEIC&L ENERGY GENERATED (BWH) 802,150 802,150 42,191,070
18. LET ELECTRICAL E88RGY GENERATED (5WH) 778,271 778,271 40,488,744
19. UNIT SERVICE FACTOR 100.0 100.0 72.2
20. DAIT AVAILABILITY FACTOR 100.0 100.0 72.2

.. .= .__ ............ ..__...... .

21. UNIT CAPACITY FACTOR (USING EDC NET) 101.1 101.1 62.8

- -- 22. UNIT CAPACITY FACTOR (USING DER NET) 98.2 98.2 61.0 -

23. UNIT FORCED OUTAGE RATE 0.0 0.0 7.8
24. SHUTDOWNS SCHE 9ULED OVER NEIT 6 BONTHS (TY PE, DATE, AND DURATION OF EACH) :

1

25. I5.SHUfDOWN AT END OF REPORT PERIOD, ESTI5ATED DATE OF STARTUP:
26. UNITS'II' TEST STATUS (PRIOR TO C055ERCIAL OPERATION) : . FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY s- 's; C055EECIAL OPERATION

. AVERAGE DAILY UNIT POWER LEVEL r .

,4

~. DOCKET N00 50 - 277 UNIT PEACH BOTTOn UNIT 2 r --------_-- _ ----_--_-__-----

x DATE FEBRUARY 11, 1982

. . ~ ,

COMPANY PHILADELPHIA ELECTRIC COMPANY

- N.M.ALDEN i ENGINEER-IN-CHARGE i

)

- NUCLELR SECTION '

- GENERATION DIVISION-MUCLEAR a, .

TELEPHONE (215) 841-5022 HONTE JANUARY 1982 ,

.s e

DAY. AVERAGE DAILY PONER LEVEL DAY AVERAGE DAILY POWER LEVEL (5WE-N ET) (MWE-NET)

~~

? 1 903 17 875 e-2 l- 902 18 872 3 - 099 19 869 4 895 20 864

'S .. 892 21 863

^ ~

6 890 22 385 7 892 23 20 8 391 24 438 9 892 25 781 1.0 889 26 710 11 890 27 874 12 ~890 28 855

'13 887 29 852

'14 884 30 846 l 15 -- 880 31 843 16 878 s.

  • O e

AVERAGE DAILY UNIT POWER LEVEL

+ .

DOCKET NO. 50 - 278 UNIT PEACH BOTTOH UNIT 3 DATE FEBRUARY 11, 1982 COEPANY PHILADELPHIA

  • ELECTRIC COMPANY N.H.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 HONTH JANUARY 1982 DAY AVERAGE DAILY. POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (HNE-NET) (HWE-N ET) 1 1072 17 1075 1 2 1074 18 1082 l

3 1073 19 1081 4 1076 20 1080 5 1077 21 1080 6 1073 22 1082 7 1054' 23 1014

! 8 1076 24 741 l

9 1074 25 1015 10 1075 26 1082 11 1079 27 1080 12 1076 28 909 13 1078 29 956 14 1079 30 889 15 1081 31 1065 16 1081

UNIT SHUTDC::1S AND PONER REDUCTIONS DOCKET NO. 50 - 277 UNIT MARE PEACH BOT 05 UNIT 2 __-

DATE FEBRUARY 11, 1982 REPORT 50 NTH JANUARY, 1982 C05PLETED NY PHILADELPHIA ELECTRIC COBPANI N.B.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DITISION-NUCLEAR TELEPHONE (215) 841-5022 _ - ..__.___

l I i l l BETHOD OF 1 LICENSEE ISISTEstC05PONENT! CAUSEACTION AND CORREC TO ITE I ITIPEIDURATIONIREASONISHUTTING DONNI EVENT l CODE I CODE I N3 1 DATE -I -(1) I (HOURS) { (2) l REACTOR (3) l REPORT 4 I (4) l (5) l PRETENT RECURRENCE - .__- ._

- = _ - ..

i I I I l l l I I 1 1 820122 i F l 32.8 i G I 3 i Nk l CH I INSTRU l ACCIDENTAL BU5 PING OF TIBRATION SWITCH ON i l l l 1 1 I i i 82C' REACTOR FEdoebhP IGRBINE hEICE TIIPPED l l l l l l l l l TURBINE RESULTING IN LON REACTOR LEYEL l l l l l l l l l CAUSING AUTOBATIC SCRAE.

. I I l ----- I I I I l i I I I 32.8 l l I ( l I o

(2) (3) (4)

(1)

BETHOD RIHIT CT G - INSTRUCTIONS F - FORCED REASON FOR P REPARATION OF DATA S - SCHEDULED 1 - EQUIP 5ENT FAILUBE (BIPL&IN) 1 - RANUAL B - BAINTENANCE OR TEST 2 - HANUAL SCRAB. ENTRI SHEETS FOR LICENSEE C - REFUELING 3 - AUTO 5ATIC SCR AM. EVENT REPORT (LER)

D - REGULATORI RESTRICTION 4 - OTHER (EIPLAIN) FILE (NOR EG-0161)

E - OPERATOR TRAINING + LICENSE EIABINATION F - ADRINISTRATITE .

(5)

G - OPERATIONAL mRROR (EIPLAIN) EIRIBIT I - SANE SOURCE H - OTRER (EIPLAIN) g g, 4: ' *.

. -' !.^ *

% ~.

  • i P *

? #, _ *

- ,; . i l

?? , .e- dFu-

I I

p 1

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET 50. 50 - 278 UNIT NARE PEACH BOTTOR UNIT 3 g DATE FEBRUARY 11, 1982 REPORT EONTH JANUARY, 1982 COMPLETED BT PHILADELPHIA ELECTRIC COEPANY b - - -

'E.a.ALDEN ENGINEER-IN-CHARG2 g NUCLEAR SECTION GENERATION DITISION-NUCLEAR TELEPHONE (215) 841-5022 I ~~

~

t l l 1 l EETHOD OF I LICENSEE ISYSTE5tCO3PONENTI CAUSE AND CORRECTITE g i ITYPEIDURATIONIREASONISHCf7ING DOWWI ETENT l CODE I CODE I ACTION TO N0 1 DATE I (1)l (HOURS) 1 (2) i REACTOR (3) i REPORT 8 I (4) I (5) l PREYENT RECURRENCE p i I I I I I I I l 1 1 820123 l S I 00.0 i H I 4 l NA I RC l zzzzzz I LOAD REDUCTION TO ADJUST CONTROL RODS

.  !  ! l  !  ! I I I I REDUCTION FITENDED TO REE0VE COPTROL Non p I l i I I I l l l DRIYE SYSTER TALTE AND TO REPAIR TUBE LEAKS 1 I I I l l 1 3 1 IN '18' AND '2C' CONDENSER NATER BOIES.

. I I I . I I I I I I g 2 1 820129 i S I 00.0 l A 1 .4 I WA 1 HG l DERINI I LOAD REDUCTION TAKEN BECAUSE THERE WAS A I I I I I I I l l POSSIBLE RESIN INJECTION INTO THE REACTOR I I I l' l l t I I WHICE BECASE IRRADIATED ALARBING THE AREA 3

I I I l l I l l l RADIATION 50NITORS.

1 I I I I I I I I 3 1 820130 l SI 00.0 i B l 4 l NA 1 HF l HTEICH l LOAD REDUCTION TO INTESTIGATE TUBE LEAKS ON y i I I I l l l l l CONDENSER NATERBOX *2B' AND REPAIR LEAKS.

I I I ---1 I I I I I I I I - I i l I I I I

I g (1) (2) (3) (4)

F - FORCED REASON EETHOD EIHIMIT G - INSTRUCTIONS g

S - SCHEDULED A - EQUIPEENT FAILURE (EIPLAIN) 1 - BANUAL FOR PREPARATION OF DATA B - EAINTEWABCE OR TEST 2 - EANUAL SCR&5. ENTRI SREETS FOR LICENSEE C - REFUELING 3 - AUTOEATIC SCRAM. ETENT REPORT (LER)

, D - REGULATORY RESTRICTION 4 - OTHER (EIPLAIN) FILE (NUREG-0161)

E - OPER ATOR TRAINING + LICENSE EI ABINATION F - ADEINISTRATITE (5)

, G - OPERATIONAL EBROR (EIPLAIN) a - OTnBR (EIPLAIN) EIBIBIT I - SARE SOURCE

  • g ,,%-

.c- . - = _.. - u. _ _ _ _ . . _ _

for January 1982 TtEPUELTNG TNPM(MATION

1. Namo of faci'ity; - ,

Toach Bottom Unit 2 l

2. Schodulod dato for nox,t row- shutdowns 1 Pobruary 20, 1982 -

3 MheAn'ed dato for montart following ro1Mo11ng; May 30,1982

4. Will roitoling or rosumption of olxn.'ation thoroactor roquiro a tochn4eal cpoc Fication chango or othor licenco amon0munt?

Yos. .

If answon is yos, what, in genavn', will thoso bo? ,

Tank _n4ael Spoc,ifications to aca^m=~hto roload fuol. Modifications to roactor coro orava+4ng limits aro oxpootod.

5 Schodulod dz.to(s) for cubmitting.proposod lioonsing action and support,ing informations Pobr svy 24, 1902

6. Lnportant Sienning ^^n"idorations accociated with ro1Mohnc, o c. , now or difforont ibol design or supplior, unroviouod donica

.or performanco analysis mothoda, significant cim.ncos in fuel dosign, now oporating procoduross Nono oxpootod. *

'/ . Thu nwabor of 1Mol ascn=h'4aa (a) in the coro and (b) in tho spent 1Mol storago pool:

(a Coro - 764 Paol Anna =h'tec (b)) Fool 2001 - 910 Ruol Accomblies

0. Tho procont licenngd spont tuol pool ctorago capacity and tho cizo of any incroaso in li^^nenA ctorago capacity that has boon roquosted or in plannod,'in numbor of ruol e e=hlies Tho spont 1Mol pool storago capacity has boon reltaannod for 2016 itol nenn=b'ica. _

9 Tho projcotod dato of tho last roitoling that can bo di ^kovovd to tho upont ruol pool aconming tho procont liconsod, capacity.

Soptembor,1990 O

e O

e 9

9

. 1]oca. .. $0 ~4 %

Attachmont to Monthly Oporating Lport for January 1982 IowwmTNG 'D&ORMATION I

1. Namo of facility:

Poach Bottom Unit 3

2. Schodn'~1 dato for noxt roitoling =hutdown:

Roitoling starta March 12, 1983 3 Schoan'~1 dato for rostart following roiholing:

April 2h,1983

h. Will roitoling or rosumption of oporation thoroaftor roquiro a tochninni opooification chango or othor liconco amon, dmont? .

Yoc. .

If answor is yes, what, in gonoral, will thoco bo? ,

Tochnical apae4fiantion chancos to accommodato roload itol.

Modifica+1ons to roaotor coro oporating limits aro oxpoctod.

. Schodolod dato(s) for submitting propocod liconning action an0 cupporting information:

Docombor 17,1982

6. Important liannning connianwetions accociatod with rottoling, o.g.,

now or difforont iMol docicn or supplior, unroviowod docign or porformanco analysin mothodo, cignificant changos in ihol do 33n, now oporating procoduros:

Nono oxpootod. "

7 Tho numbor of itol accomblica (a) in tho coro and (b) in tho spent tuol storago pool:

(a) Coro - 7(4 IMol Assomblios (b) lMol Pool - 928 T=A4^tod Ital Aa"omblies

6. Tho pronont liconcod cpont itol pool storaco capacity c.n d the cizo of any incroaco in liconcod storago capacity that has boon rcquostod or iu plannod, in numb'or of Atol acon =h74aa:

Tho upont itol pool storago capacity has boon roliconuod for 2816 1401 accomblioc.

9 Tho projectod dato of tho lact roitoling that can bo <14c^hegod to the upont 1Mol pool accuming tho procont liooncod capacity:

Scytcabor,1991 S


n -- r- --v, ,, . ,

i .

\ . ..

f PEACH BOTTOM ATOMIC POWER STATION NARRATIVE

SUMMARY

OF OPERATING EXPERIENCES January, 1982 l

UNIT 2 OPERATIONS The unit continues to operate in an end of cycle coast down mode. On January 22, the reactor experienced an inadvertant low reactor water level scram due to the jarring of the 2C reactor feedpump turbine vibration trip switch. The unit was returned to service the next day.

On January 28, a failed relay was replaced to correct a false 'A' channel scram from Scram Discharge Volume High Level.

The unit is scheduled to be removed from service on February 19 to accommodate suppression pool modifications and refueling.

UNIT 3 OPERATIONS The unit operated at full capacity until January 23 when a load reduction was taken to accommodate control rod adjustments, control rod drive system valve repair, and repair of condenser leaks. The unit reached full power on January 25.

On January 28, load was reduced as a result of a suspected resin injection into the reactor causing some area radiation alarms. A load reduction was also taken on January 30 to accommodate investigation and repair of condenser leaks.