'JAN P 7 082'
\\.
@,
Docket No. 50-373
fp.
'
mi
,.
Commonwealth Fdison Coir.pany
'.J[
. ."
m
c c,
-
"j n ;,'
. .:;g
j._ b '@
2Jgy
ATTN:
Mr. Cordell Reed
o
-
Vice President
1
'
Post Office Box 767
Q
rip ag-
k
U
.
Chicago, IL 60690
%w
Gentlemen:
This refers to the routine safety inspection conducted by Messrs.
R. D. Walker, S. E. Shepley, G. C. Wright and K. A. Connaughton of this
office on November 16 through December 31, 1981, of activities at the
LaSalle County Nuclear Station, Unit 1, authorized by NRC Construction
Permit No. CPPR-99 and to the discussion of our findings with
Mr. G. J. Diederich at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted
of a selective examination of procedures and representative records,
observations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure
under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office
by telephone within ten (10) days from the date of this letter of your
intention to file a request for withholding; and (b) submit within
twenty-five (25) days from the date of this letter a written application
to this office to withhold such information.
If your receipt of this
letter has been delayed such that less than seven (7) days are available
for your review, please notify this office promptly so that a new due
date may be established. Consistent with Section 2.790(b)(1), any such
application must be accompanied by an affidavit executed by the owner
8202160727 820127
gDRADOCK 05000373
.[Ecty
PDR .
.
.
.
.
,
Commonwealth Edison Company
-2-
January 27, 1982
of the information which identifies the document or part sought to be
withheld, and which contains a full statement of the reasons which are
the bases for the claim that the information should be withheld from
public disclosure. This section further requires the statement to
address with specificity the considerations listed in 10 CFR 2.790(b)(4).
The information sought to be withheld shall be incorporated as far as
possible into a separate part of the affidavit. If we do not hear from
you in this regard within the specified periods noted above, a copy of
this letter and the enclosed inspection report vill be placed in the
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
}{ 0
ff Y
R. L. Spessard, Director
Division of Resident and
Project Inspection
Enclosure:
Inspection Report
No. 50-373/81-50
cc w/ enc 1:
Louis 0. De1 George, Director
of Nuclear Licensing
L. J. Burke, Site
Construction Superintendent
T. E. Quaka, Quality
Assurance Supervisor
R. H. Holyoak, Station
Superintendent
-
B. B. Stephenson, Project Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Mary Jo Murray, Office of
Assistant Attorney General
5
RI I
RIII
RIII
RIIJ,05
' g/{b
fl$
bl
V
0. s0<
Walker /jp
onnaughton
Knop
Spessar
1/25/81
-, . - _ _
.
_
_
_
.