Forwards IE Insp Rept 50-373/81-50 on 811116-1231.No Noncompliance Noted
ML20040H007
Person / Time
Site: LaSalle 
Issue date: 01/27/1982
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20040H008 List:
References
NUDOCS 8202160727
Download: ML20040H007 (2)


See also: IR 05000373/1981050

Text

.

. ' ..

. , ,

'JAN P 7 082'

\\.

@,

Docket No. 50-373

fp.

'

mi

,.

Commonwealth Fdison Coir.pany

'.J[

. ."

m

c c,

-

"j n ;,'

. .:;g

j._ b '@

2Jgy

ATTN:

Mr. Cordell Reed

o

-

Vice President

1

'

Post Office Box 767

Q

rip ag-

k

U

.

Chicago, IL 60690

%w

Gentlemen:

This refers to the routine safety inspection conducted by Messrs.

R. D. Walker, S. E. Shepley, G. C. Wright and K. A. Connaughton of this

office on November 16 through December 31, 1981, of activities at the

LaSalle County Nuclear Station, Unit 1, authorized by NRC Construction

Permit No. CPPR-99 and to the discussion of our findings with

Mr. G. J. Diederich at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure

under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office

by telephone within ten (10) days from the date of this letter of your

intention to file a request for withholding; and (b) submit within

twenty-five (25) days from the date of this letter a written application

to this office to withhold such information.

If your receipt of this

letter has been delayed such that less than seven (7) days are available

for your review, please notify this office promptly so that a new due

date may be established. Consistent with Section 2.790(b)(1), any such

application must be accompanied by an affidavit executed by the owner

8202160727 820127

gDRADOCK 05000373

.[Ecty

PDR .

.

.

.

.

,

Commonwealth Edison Company

-2-

January 27, 1982

of the information which identifies the document or part sought to be

withheld, and which contains a full statement of the reasons which are

the bases for the claim that the information should be withheld from

public disclosure. This section further requires the statement to

address with specificity the considerations listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit. If we do not hear from

you in this regard within the specified periods noted above, a copy of

this letter and the enclosed inspection report vill be placed in the

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

}{ 0

ff Y

R. L. Spessard, Director

Division of Resident and

Project Inspection

Enclosure:

Inspection Report

No. 50-373/81-50

cc w/ enc 1:

Louis 0. De1 George, Director

of Nuclear Licensing

L. J. Burke, Site

Construction Superintendent

T. E. Quaka, Quality

Assurance Supervisor

R. H. Holyoak, Station

Superintendent

-

B. B. Stephenson, Project Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Mary Jo Murray, Office of

Assistant Attorney General

5

RI I

RIII

RIII

RIIJ,05

' g/{b

fl$

bl

V

0. s0<

Walker /jp

onnaughton

Knop

Spessar

1/25/81

-, . - _ _

.

_

_

_

.