Forwards IE Insp Rept 50-409/81-21 on 810901-1221.No Noncompliance Noted
ML20040G992
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 01/29/1982
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Linder F
DAIRYLAND POWER COOPERATIVE
Shared Package
ML20040G993 List:
References
NUDOCS 8202160710
Download: ML20040G992 (2)


See also: IR 05000409/1981021

Text

- - _ - _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _

_-.

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

<

.

,

$a

/%

c

v

-

-m

EED1 E 12% (

w,

n. c. . . .

,

-

Docket No. 50-409

L

  • ~'

n;L ,

' -

i;

Dairyland Power Cooperative

\\

. ,7

~-- is' /

,

/

ATTN:

Mr. F. W. Linder

General Manager

  • 'l

2615 East Avenue - South

Lacrosse, WI 54601

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. W. L. Forney

and M. W. Branch of this office on September 1 through December 21, 1981, of

activities at La Crosse Boiling Water Reactor authorized by hTC Operating

License No. DPR-45 and to the discussion of our findings with Mr. R. Shimshak

at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the information

I

8202160710 820129

-

PDR ADOCK 05000409

J J .

O

PDR

sf

'I

l

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ,

'

.

Dairyland Power Cooperative

-2-

February 2, 1982

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

'

part of the affidavit. If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

jf C f, < f Y

R. L. Spessard, Di ector

Division of Resident and

Project Inspection

Enclosure:

Inspection

Report No. 50-409/81-21

cc w/ enc 1:

R. E. Shimshak, Plant

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

l

John J. Duffy, Chief

Boiler Inspector

Stanley York, Chairman

Public Service Commission