ML20040G992
| ML20040G992 | |
| Person / Time | |
|---|---|
| Site: | La Crosse File:Dairyland Power Cooperative icon.png |
| Issue date: | 01/29/1982 |
| From: | Spessard R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Linder F DAIRYLAND POWER COOPERATIVE |
| Shared Package | |
| ML20040G993 | List: |
| References | |
| NUDOCS 8202160710 | |
| Download: ML20040G992 (2) | |
See also: IR 05000409/1981021
Text
- - _ - _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _
_-.
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
<
.
,
$a
/%
c
v
-
-m
EED1 E 12% (
w,
n. c. . . .
,
-
Docket No. 50-409
L
- ~'
n;L ,
' -
i;
Dairyland Power Cooperative
\\
. ,7
~-- is' /
,
/
ATTN:
Mr. F. W. Linder
General Manager
- 'l
2615 East Avenue - South
Lacrosse, WI 54601
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. W. L. Forney
and M. W. Branch of this office on September 1 through December 21, 1981, of
activities at La Crosse Boiling Water Reactor authorized by hTC Operating
License No. DPR-45 and to the discussion of our findings with Mr. R. Shimshak
at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
I
8202160710 820129
-
PDR ADOCK 05000409
J J .
O
sf
'I
l
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ,
'
.
Dairyland Power Cooperative
-2-
February 2, 1982
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
'
part of the affidavit. If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
jf C f, < f Y
R. L. Spessard, Di ector
Division of Resident and
Project Inspection
Enclosure:
Inspection
Report No. 50-409/81-21
cc w/ enc 1:
R. E. Shimshak, Plant
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
l
John J. Duffy, Chief
Boiler Inspector
Stanley York, Chairman
Public Service Commission
l
f
RIII
RIII
RIII
l
e
b
M V4e
.1,..
Branch /jp
-- m;::
S eeter
Spesspr
1/25/82
$ q
/73
1