ML20040G916
| ML20040G916 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 01/27/1982 |
| From: | Spessard R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Crouse R TOLEDO EDISON CO. |
| Shared Package | |
| ML20040G917 | List: |
| References | |
| NUDOCS 8202160617 | |
| Download: ML20040G916 (2) | |
See also: IR 05000346/1981022
Text
e
.
.
JAtt 271982
Docket No. 50-346
sf'! l q)
Toledo Edison Company
y/
3
ATTN:
Mr. Richard P. Crouse
-/
Vice President
~j
{
Nuclear
1
. , ! '? igy" ~
8"/> l
,
f (
Edison Plaza
(
,,
r
~'
300 Madison Avenue
\\
,
Toledo, OH 43652
, ,
l MY, , i i
N
- ..
Gentlemen:
This refers to the routine safety inspection conducted by Messrs.
L. A. Reyes and W. G. Rogers of this office on November 2-30, 1981,
of activities at Davis-Besse Nuclear Power Station authorized by NRC
Operating License No. NPF-3 and to the discussion of our findings
with Mr. T. Murray throughout the inspection period.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted
of a selective examination of procedures and representative records,
observations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
8202160617 820127
PDR ADOCK 05000
.CE0/ M
'
.
.
Toledo Edison Company
-2-
g, g
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the-bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
" Original signed by R.I.. S essard"
P
R. L. Spessard, Director
Division of Resident and
Project Inspection
Enclosure:
Inspection
Report No. 50-346/81-22
cc w/ enc 1:
T. D. Murray, Stati on
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Harold W. Kohn, Power Siting
Commission
Helen W. Evans, State of Ohio
RIII
RIII
RIII
RIII
RIII
ersh
ye
Y'P-
97
Re es
Hunter
reeter
Sp , rd
1/27/82
1/m
t/g,
Sj/s.1
g
R
,
. , -
-
--
.,
-