Forwards IE Insp Rept 50-346/81-22 on 811102-30.No Noncompliance Noted
ML20040G916
Person / Time
Site: Davis Besse 
Issue date: 01/27/1982
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML20040G917 List:
References
NUDOCS 8202160617
Download: ML20040G916 (2)


See also: IR 05000346/1981022

Text

e

.

.

JAtt 271982

Docket No. 50-346

sf'! l q)

Toledo Edison Company

y/

3

ATTN:

Mr. Richard P. Crouse

-/

Vice President

~j

{

Nuclear

1

. , ! '? igy" ~

8"/> l

,

f (

Edison Plaza

(

,,

r

~'

300 Madison Avenue

\\

,

Toledo, OH 43652

, ,

l MY, , i i

N

  1. ..

Gentlemen:

This refers to the routine safety inspection conducted by Messrs.

L. A. Reyes and W. G. Rogers of this office on November 2-30, 1981,

of activities at Davis-Besse Nuclear Power Station authorized by NRC

Operating License No. NPF-3 and to the discussion of our findings

with Mr. T. Murray throughout the inspection period.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

8202160617 820127

PDR ADOCK 05000

.CE0/ M

'

.

.

Toledo Edison Company

-2-

g, g

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the-bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

" Original signed by R.I.. S essard"

P

R. L. Spessard, Director

Division of Resident and

Project Inspection

Enclosure:

Inspection

Report No. 50-346/81-22

cc w/ enc 1:

T. D. Murray, Stati on

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Harold W. Kohn, Power Siting

Commission

Helen W. Evans, State of Ohio

RIII

RIII

RIII

RIII

RIII

ersh

ye

Y'P-

97

Re es

Hunter

reeter

Sp , rd

1/27/82

1/m

t/g,

Sj/s.1

g

R

,

. , -

-

--

.,

-