ML20040G287

From kanterella
Jump to navigation Jump to search
Requests Review of Encl Questions Documented in Ltrs for NRC for Which No Response Has Been Recorded.Immediate Response Required to Provide SER Input
ML20040G287
Person / Time
Site: Byron  
Issue date: 12/31/1981
From: Youngblood B
Office of Nuclear Reactor Regulation
To: Delgeorge L
COMMONWEALTH EDISON CO.
References
NUDOCS 8202120102
Download: ML20040G287 (6)


Text

!

.a rs

.- o b

y s

Dist...

DEC 311981 T

DEisenhut NRC/PDR BJYoungblood L/PDR RLTedesco

.NSIC bocket hos.: STN 50-454 MRushbrook TIC and dTN 50-455 SChesnut ACRS (16)

RVollmer TMurley

  1. 7N b['

^

Hr. Louis u. DelGeorge RMattson Director of Nuclear Licensing

-\\

JKramer Loi.e.onweal th Ld1 son Lo.aparty SHanauer

l i

RHartfield, MPA b

Post Office box 767 0 ELD l

D Chicago, Illinois 60o90 hn,x OIE (3)

Dear Mr. De1 George:

A 1

buo,)ect: Dyron dLR heview Questions

./

As we approach the final stages of preparation of the Safety Evaluation P.eport for Byron Station, we find it necessary to detergiine the status of responses to questions that have been asked in our review of the byron F5AR. These include questions transaitted to you Dy mail with HRC review branches' identification numbers, as well as questions discussed at public meetings and documented in aceting suataries.

We have listed in Enclosures 1 arid 2 questions for which we have no record of a response, either by letter or by FSAR revision up to and including revision 36 to the Byron /oraicwood F5M. he recognize that you rady have responded t: a nuuber of these iteras in recent letters and FSAR revisions. However, to expedite the review process your assistance is requested in confirming the status of these itens.

You are requested to review Enclosures 1 and z.

It a response has been made to any of these questions, please identify a reference (letter and date) for each. Soue of these questions uay have been seemingly resolved in discussions with tne staff. hevertheless, such responses must be docketed by you. For those questions still requiring a response, iuaediate attention is required since tnese inputs were needed several weeks prior to the staff's Lt.K input date of January 7,1982. Please provide a schedule within seven days at your receipt of this letter indicating when you intend to respono to the outstanding questions. With regard to tne $LR scnedule, we must have satisfactory resporises to all questions within two weeks in order to neet the SLR schedule with no open iteus reraaining. We will continue to work closely with your statt to assure timely processing of your application.

omcn>

SURLAZE' 8202120102 811231 goa^oocxosooog

.. m nnc ronu sia niso> sacu osi OFFICIAL RECORD COPY useoam-mem

.{

x,

-z-If you require further information or clarification of this request, please contact the NRC Licensing Project itanager S. H. Chesnut.

Sincerel y.

B. J. Youngblood, Chief -

Licensing Branch No. 1 Division of Licensing

Enclosures:

As stated cc:

See next page x

"The reporting and/or recordkeepirig requirements contained in this letter aff ect f crec th:ut ten respondents ;

therefore, 019 clearance is not required sader P.L.96-511.*

DL:LB DL b}/

OFFICE) ad BJ.Y f/h.L.....

sunNaut > iCh yt...

.!2/gi8L.

.4/.

OATE,

unc ronu sia oo-son nacu oua OFFIClAL RECORD COPY usa m nei-an

r Questions Documented in Letters for NRC for Which No Response Has Been Recorded Byron, Unit 1 Branch Question Number, Date to Applicant Auxiliary.

10.38 1/2/81 Systems 10.48 1/2/81 Containment 22.8 11/17/81 Systems 22.11 11/17/6A 22.15 11/17/81 22.23 11/17/81 22.24 11/17/81 1

22.25 11/17/81 22.26 11/17/81 22.37 11/17/81 22.40 11/17/81 22.50 11/17/81 22.59 11/17/81 22.76 11/17/81 Instrumentation 31.40 4/30/81 and Control Power Systems 40.162 3/23/81 40.163 3/23/81 40.164 3/23/81 40.165 3/23/81 40.166 3/23/81 40.167 9/22/81 40.168 9/22/81 40.169 9/22/81 40.170 9/22/81 40.171 9/22/81 40.172 9/22/81 40.173 9/22/81 40.174 9/22/81 40.175 9/22/81 40.176 9/22/81 40.177 9/22/81 40.178 9/22/81 40.179 9/22/81 40.180 9/22/81 40.181 9/22/81 40.182 9/22/81

- woe.e a,e rgv -

B ranc_h Question Number Date to Applicant Powr Systems 40.183 9/22/81 40.184 9/22/81 40.185 9/22/81 40.186 9/22/81 40.187 9/22/81 40.188 9/22/81 l

Mechanical 110.66 9/14/81 l

Engineeririg i

Reactor 212.155 9/3/81 Systems 212.157 9/3/81 Cc re Perfomance 221. 3 8/24/81

/

-T H Core 23 0. 1 8/24/81 Perfomance 230.2 8/24/81 230.3 8/24/81 230.4-8 /24,'81 230.5 8/24r31 230.6 8/24/11 230.7 8/24/81 230.8 8 /24 /81 230.9 8/24/81

- 230.10 8/24/81 230.11 8/24/81 Geotechnical 241.6 8/25/81 Engineering 241.7 8/25/81 241.8 8/25/81 241.9 8/25/81 l

Material s 251.3 11/30/81 Engineering 251.5 11/30/81 Equipment 271.1 10 /7/81 Qualification 271.2 10/7/81 271.3 10/7/81 e

6 o

w w

,y

~ -

Branch Question Number Date to Applicant Chemical 281.2 8/24/81 j

Engineering 281.7 8/24/81 Geosciences 362.1 5/7/81 362.8 5/7/81 Quality 421.19 3/16/81 Assurance 421.22 11/18/81 Procedure and 423.22 11/30/81 Test Review 423.23 11/30/81 423.24 11/30/81 423.25 11/30/81 423.25 11/30/81 423.26 11/30/81 11/30/81 423.27 11/30/81 423.28 423.29 11/30/81 423.30 11/30/81 423.31 11/30/81 423.32 11/30/81 423.33 11/30/81 Procedure and 423.34 11/30/81 Test Review 423.35 11/30/81 423.36 11/30/81 l

423.37 11/30/81 423.38 11/30/81 423.39 11/30/81 423.40 11/30/81 l

423.41 11/30/81 423.42 11/30/81 450.3 11/30/81 Chemical Engineering 600.1 (partial) 4/18/81, (Fire Protection) l l

l I

Questions Documented in Letters From NRC or Public Meeting Summaries for Which no Response Has Been Recorded Byron Station Date of Meeting Summary Branch Meeting Date or NRC Letter Questions PSB 10/15/81 12/7/81

- 1 a-e 2

3 CPB 12/7/81 1

4 SEB 10/11/81 -

11/30/81 2

10/13/81

-RSB 12/4/81 7

l 14 II.B.I AEB 12/7/81 Encl. (2) l SP 12 1a.

l (UFB)

_ -.,,.