ML20040G022
| ML20040G022 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom, Limerick, 05000000 |
| Issue date: | 02/05/1982 |
| From: | Daltroff S PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8202110104 | |
| Download: ML20040G022 (2) | |
Text
A O
PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET g
9 P.O. BOX 8699 d>%
gN PHILADELPHIA. PA.19101 gggg SHIE 9 L DALTROFF g*
ELECTalc PRODUCT'ON g
i 8EMW muusia tec 4
February 5, 1982 G
Docket Nos. 50-277 50-278 50-352 50-353 Mr. Darrell G.
Eisenhut, Director Division of Licensing U.S.
Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Eisenhut:
On December 29, 1981, we forwarded to you our response on the " Generic Safety Evaluation Report Regarding Integrity of the BWR Scram System Piping".
Due to administrative oversight, there are three errors with this letter.
First; page 1, last paragraph ASME section referenced should be XI not IX.
- Second, on page three, paragraph one, the stated date should be 1982 not 1981.
Third, docket numbers were not included on the letter.
It is our understanding that due to the ommission of specific document numbers, a copy of the original letter has been docketed against Limerick Generating Station, Docket Nos.
50-352 and 50-353.
p\\
f9l0 t
8202110104 820205 PDR ADOCK 05000277 H
o Mr. Darrell G.
Eisenhut, Director Page 2 Please take the necessary steps to remove the previously submitted letter from the Limerick Generating Station Docket 50-352 and 50-353 and replace the letter in the Peach Bottom docket with the enclosed corrected copy.
We regret any inconvenience this error may have caused you and your staff.
Very truly yours, 7
/
)
/
/ 47
- fECUj
/
s i
Enclosure -
s n'
e
\\
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _.. _ _ _. _ _ _ _ _ _ _ _ _ _ _... _ _ _ _ _ _ _ _. _ _ _ _. _ _