ML20040F566
| ML20040F566 | |
| Person / Time | |
|---|---|
| Site: | Framatome ANP Richland |
| Issue date: | 02/01/1982 |
| From: | Brock B, Norderhaug L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | |
| Shared Package | |
| ML20040F560 | List: |
| References | |
| 70-1257-82-01, 70-1257-82-1, NUDOCS 8202090350 | |
| Download: ML20040F566 (1) | |
Text
.
1 The information on this page is considered to.be appropriate i
for public disclosure pursuant to 10 CFR 2.790.
U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region V Report No. 70-1257/82-01 (E-V-477)
Dock'et No. 70-1257 License No. SNM-1227 Safeguards Group 1
Licensee:
Exxon Nuclear Company 2101 Horn Rapids Road Richland, Washington v
Facility Name:
Inspection at:
Richland, Washington Inspection Conducted:
January 18-20, 1982 Date of Last Material Control and Accounting Inspection:
~
~
Type of Inspection: Announced Special Safeguards' A
In'spectors:
B. L. Bro k, Chemist Date Signed
$[/[%
Approved by:
- 1. R. hor'derfiaug, Dief, SafttftraR anch Date Signed Inspection Sumary:
Areas Inspected: Observation of IAEA ad hoc inspection of the licensee's records and reports the licensees UF cylinder weighing system and sampling of SNM _at 6
various process stages.
The inspection involved 22 inspector-hours onsite by one inspector.
No items of noncompliance were identified.
8202090350 920202 PDR ADOCK 07001257 C