Text
--
Docket Nos. 50-528/$29/530 50.$$(c) Report N
TFLUDBlaHD $lKHMFfCDltl @@TIEPlM?f P. O. BOX 216 6 6
- PHOENIX, ARIZON A 85036 January 28, 1982 ANPP-20013-GHD/BSK U. S. Nuclear Regulatory Commission A
Region V p
g Creekside Oaks Office Park RECEIVEO 1450 Maria Lane - St.ite 210 3
g Walnut Creek, California 94596-5368 b
Attention:
Mr. B. H. Faulkenberry, Chief Reactor Construction and fr $df[#88 EV Engineering Support Branch
//
'b
Subject:
Interim Report - DER 81-53 g
A 50.55(e) Potentially Reportable Deficiency Relatin to Unit 1 Main Control Panel (JM-200) Violates Wiring Separation Requirements File:
82-019-026 D.4,33.2
Reference:
Telephone Conversation between J. Eckhardt and G. Duckworth on December 30, 1981
Dear Sir:
The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days.
Due to the extensive investigation and evaluation required, an Interim Report is attached.
It is now expected that this information will be finalized by April 22, 1982, at which time a complete report will be submitted.
Very truly yours,,
CLLL A LL E. E. Van Brunt, Jr.
APS Vice President Nuclear Projects ANPP Project Director O FO'D.Td EEVBJr/CHD:skc Enclosure cc: See Attached Page 2
~
..1 E202090308 820128 trihj'$-'J'
$s J
PDR ADOCK 05000528 l
S PDR 6:L-W
i U. S. Nuclstr Ragulttory Commiecion Attention:
Mr.-B. H. Faulkenberry, Chief ANPP-20013-GHD/BSK January 28, 1982 Page 2 cc:
Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 J. A. Roedel D. B. Fasnacht G. C. Andognini F. W. Hartley J. M. Allen s
A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. A. Brand A. C. Gehr W. J. Stubblefield W. C. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Ms. Patricia Lee Hourihan 6413 South 26th Street Phoenix, Arizona 85040 1
INTERIM REPORT - DER 81-53 POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC SERVICE COMPANY (APS)
PVNGS UNIT 1 I.
Potential Problem During a termination walkdown inspection, the Main Control Panel Wiring was found to be in violation of IEEE 384-1974.
e NCR EC-1669 identifies Consip installed internal wiring which has bundled Clase 1E wires (red and green) with Non-Class IE wires (black).
e NCR EC-1668 identifies Bechtel Construction termination / routing of cables and wires in violation of separation requirements.
II.
Approach To and Status Of Proposed Resolution Bechtel has requested assistance from Comsip, Incorporated in evaluating and dispositioning the wiring within the control panels. Bechtel will coordinate the Bechtel-installed wiring with Comsip's corrective action plan.
III. Projected Completion of Corrective Action and Submittal of the Final Report Evaluation of this condition and submittal of the Final Report is forecast to be completed by April 22, 1982.