Docket Nos. 50-508/509
)
50 55(e) Report Washington Public Power Supply System Box 1223 Elma, Washington 98541 (206)482-4428 Docket Numbers 50-508 and 50-509 o
January 28, 1982 g
G03-82-094 s
A
,b Q
YO q
p Gy,
f y
D I' 4[?g[8 ).
O
"'9 U. S. Nuclear Regulatory Commission, Region V d
8g D
Office of Inspection and Enforcement Qq.g"N%
1450 Maria Lane, Suite 260 y
4 Walnut Creek, California 94596-5368 4
Attention: Mr. B. H. Faulkenberry Chief, Reactor Construction Projects Branch
Subject:
PROJECT NOS. 3 AND 5 FINAL REPORT OF P0TENTIAL 10CFR50.55(e)
RP EMBED PLATES - WELDING DEFICIENCIES (D/N #025)
Reference:
Letter, G03-81-2424, dated August 27,1981, R. S.
Leddick to B. H. Faulkenberry, Interim Report of Potential 10CFR50.55(e), same subject.
The referenced letter provided your office with an interim report of a potential 10CFR50.55(e) concerning the subject condition.
The re-port noted that additional evaluation was required to determine the effects of not performing post weld heat treatment.
The Architect / Engineer's final report was submitted to the Supply Sys-tem on January 20, 1982 for review. The Supply System has reviewed the report; however, it has been determined that further analysis and clarification is required prior to forwarding to your office. As a result, the final report will be provided by March 12,1982.
Should you have any questions or desire further information, please con a directly.
R.
. Led Program Director, WNP-3/5 1;
DEC/tt m
Attachment y
y
..]
cc:
J. Adams - NESCO NN!
D. Smithpeter - BPA 2
m 13 Ebasco - New York Z
WNP-3/5 Files - Richland 82020902EM3 g
/
gDR ADOCK 05hochhg PDR