ML20040F396

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-373/81-51 on 811222.No Noncompliance Noted
ML20040F396
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 01/27/1982
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20040F397 List:
References
NUDOCS 8202090154
Download: ML20040F396 (2)


See also: IR 05000373/1981051

Text

P

,

.

m272

\\ Fr / s

f

&

M /.4-

s

\\

b-

.

V

4

,

Y

Docket No. 50-373

0

M,

2

p(J s [/o

w

Commonwealth Edison Company

fk

h~;

".;A((O

ATTN:

Mr. Cordell Reed

(

,g

Vice President

?. x

Post Office Box 767

/N

f5

Chicago, IL 60690

N/77,2fTy#

Gentlemen:

This refers to the meeting conducted at our office on December 22, 1981,

in Glen Ellyn, Illinois. The purpose of the meeting was to discuss our

concerns as to whether the as-built structural components met design

requirements at the LaSalle Station.

The enclosed copy of the report identifies topics discussed.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of.

this letter and the enclosed inspection report will be placed in the hTC's

Public Document Room.

If this report contains any information that you (or

your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within ten (10)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such information.

If your receipt of this letter has been delayed such that less than seven (7)

days are available for your review, please notify this office promptly so that

a new due date may be established.

Consistent with Section 2.790(b)(1), any

such application must be accompanied by an affidavit executed by the owner of

the information which identifies the document or part sought to be withheld,

and which contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure. This

section further requires the statement to address with specificity the con-

siderations listed in 10 CFR 2.790(b)(4). The information sought to be

withheld shall be incorporated as far as possible into a separate part of the

affidavit.

If we do not hear from you in this regard within the specified

periods noted above, a copy of this letter and the enclosed inspection report

will be placed in the Public Document Room.

8202090154 820127

PDR ADOCK 05000

p[

"

s

.

.

.__

._. .

.__

. . _ .

.

.m.

. . .

.

.o

.

Commonwealth Edison Company

-2-

JAN 2 71932

We will gladly discuss any questions you have concerning this .inspec. tion.

Sincerely,

Original signed by

A. Bert Davis

James G. Keppler

>

Regional Administrator

Enclosure:

Inspection Report

No. 50-373/81-51

cc w/ encl:

'

Louis 0. De1 George, Director

i

of Nuclear Licensing

L. J. Burke, Site

Construction Superintendent

T. E. Quaka, Quality

,

Assurance Supervisor

,

'

R. H. Holyoak, Station

' Superintendent

B. B. Stephenson, Project Manager

!

DMB/ Document Control Desk (RIDS)

j

Resident Inspector, RIII

'

Mary Jo Murray, Office of

Assistant Attorney General

s

4

i

i

R,II

III

RI I

RIII RIII

RII

RIII

RIII

RIII

'

f'Qff

h

A

l( N

kndp'4lb

i

\\

WalkehsvDavisFKeppler

c

Lq

an/so .H

kins Williams

up Spepsyrd

(

,b ;,*

ll15

//2 7

1/6/82

~ ll1f$b

i

. _ _ . _ _

.

,. ._,_

_

.

.

.

. .

. . . .

.

.

.