CONFIRMATION OF ACTION b
(
>FEB 0 219c2
[\\fM Docket No. 50-254 L
Docket No. 50-265 v
'y p-
--]f /Tjr;"n
'lI Commonwealth Edison Company i
ATTN:
Mr. Cordell Reed
- c. l fl -
lb~ 4 > ;-
Vice President M
Post Office Box 767 9
O Chicago, IL 60690 Og
, j Gentlemen:
This letter is to confirm agreements reached between Mr. N. Kalivianakis, Quad-Cities Station Superintendent, and others of your staff, and Mr. W. Axelson and other members of the NRC staff on January 27, 1982, during the management exit interview following the NRC Emergency Prepared-ness Appraisal.
Immediate corrective actions are required for significant Appraisal Findings.
The exact nature of the required actions, as well as the agreed upon dates for such actions, are as follows:
1.
Emergency Equipment and Supplies Required Actions The first aid / decontamination facility must be remodeled such that a.
all equipment and supplies not needed for first aid or decontamina-tion are removed and stored elsewhere; adequate space for the administration of first aid (such as a horizontal working surface) is provided; and the room maintained in a sanitary condition.
This shall be completed by June 1, 1982.
b.
The licensee must ensure that the interim Emergency Operations Facility (EOF) contains a copy of the pertinent portions of the Final Safety Analysis Report and as-built piping and instrumen-tation diagrams.
This shall be completed by March 1, 1982.
2.
Emergency Plan Implementation Procedures and Interface Procedures Required Actions a.
All QGA and Q0A procedures which could conceivably result in the declaration of a GSEP Emergency Condition will contain a CONFIRMATION OF ACTION 8202090005 820202
[ Q' $,
PDR ADOCK 05000254 F
CONFIRMATION Of ACTION 4
Commonwealth Edison Company statement to direct the user to inform the Shift Engineer or Station Director of a GSEP condition requiring possible classi-fication of the event. This shall be implemented during the next revision to each procedure.
In the interim, a table shall be placed in the QGA and Q0A procedure manuals referencing the user to the GSEP.
This shall be completed by May 1, 1982.
b.
A procedure must be prepared for the Acting Station Director (Shif t Engineer or Shift Foreman) which clearly delineates the actions he is to take during an emergency. This procedure must include the classification of the event, appropriate notifica-tions, how to fill out the Nuclear Accident Reporting System (NARS) form for protective action recommendations, the prior-itization of tasks for the Rad / Chem Technicians (RCTs) under his direction, and the sounding of the assembly / evacuation alarm for any Site Area or General Emergency. This procedure shevild not contain any extraneous information that is not needed by the Acting Station Director to implement his respons-ibilities. All Acting Station Directors must be trained on the use of this procedure. This training must include a means to
.f verify that an adequate understanding of duties and respons-ibilities has been achieved; i.e., walk-throughs of the procedure.
F This shall be completed by May 1, 1982.
c.
QEP 360-3 must clearly indicate that a site evacuation will ha conducted for any Site Area or General Emergency unless radio-logical conditions prohibit.
This shall be completed by April 1, 1982.
d.
The licensee must prepare a procedure for station augmentation such that augmentation capabilities defined in Criterion II.B.5 of NUREG-0654, Revision 1, can be met.
This procedure must include a description of the phone tree, and be prioritized to ensure timely shif t augmentation.
This shall be completed by May 1, 1982.
e.
The Corporate Command Center Director's call list must be prioritized such that a Recovery Manager will be at the nearsite EOF within 60 minutes of determining that the EOF must be activated.
This shall be completed by March 1, 1982.
CONFIRMATION OF ACTION
-m-p CONFIRMATION'0F-ACTION 5-
~
Commonweatlh'Ed'ison Company FEB 0 219524 f.
The 'icensee' must incorporate the revised protective action recommendations table (Table 6.3-1) into the GSEP and appropriate station emergency plan implementation procedures (QEPs).
~
This shall be completed by April 1, 1982.
s g.
QEP 530-2-must be revised to ensure that the communication checks with the NRC as required by 10~CFR 50, Appendix E,Section IV.E.9.d are conducted.
4 This shall be completed by April 1, 1982.
-h.
The appropriate QEP procedures must describe the provisions and time required for notifying personnel outside of the protected area but within the owner controlled area (e.g., visitors center,-
warehouse, and old training building) that they should evacuate the area.
This shall be completed by April 1, 1982.
i If our understanding of your planned actions described above is not in accordance with the actual plans and actions.being implemented, please
[
conta'ct this office by telephone and'in writing within 24 ho'urs.
- Further, please inform this office,.in writing, upon completion of all the above action items.
Sincerely, j
Griginal-signed by A. Bert Davis James G. Keppler Regional Administrator l
.cc: Louis 0. DelGeorge, Director of Nuclear Licensing N. Kalivianakis, Plant i
f Superintendent DMB/ Document Control. Desk (RIDS)
Resident Inspector, RIII Mary Jo Murray, Office of Assistant Attorney General i
Dan Bement, FEMA Region V-Steve Ferris, FEMA Region VII 1
i t
RIII RIII <
-RIII RII RIII RIII RIII p
-Wh ps/jp ic or A
-Pa de llo Qa HQ d-WaAer he 1er.2/1/82 Lli h 7.
)
Warni,ck Da s il
= (UJWh
^
l-CONFIRMATION OF ACTION-l
-