ML20040E855
| ML20040E855 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 01/15/1982 |
| From: | Warnick R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Davidson D CLEVELAND ELECTRIC ILLUMINATING CO. |
| Shared Package | |
| ML20040E856 | List: |
| References | |
| NUDOCS 8202050450 | |
| Download: ML20040E855 (2) | |
See also: IR 05000440/1981018
Text
{{#Wiki_filter:_ _ - _ _ _ _ _ _ _ _ _
=. . W I 5 997 c, .9 Docket No. 50-440 N 4 Docket No. 50-441 y! \\ N I . c"n t n g The Cleveland Electric 111uminating [[ h "' *" Company 0 FEB 41982> T ATTN: Dalwyn R. Davidson [ .g Vice President - System \\9, Ts3${3N3 Engineering and Construction 4 C E Post Office Box 5000 c, Cleveland, OH 44101 a g Gentlemen: This refers to the investigation conducted by Mr. G. A. Phillip of this office on November 30, December 1 and 2, 1981, of activities at the Perry Nuclear Power Plant, Units 1 and 2 authorized by NRC Operating License No. DPPR-148 and No. DPPR-149 and to the discussion of our findings with Messrs. M. Edelman and D. Farrell at the conclusion of the investigation. The enclosed copy of our investigation report identifies areas examined during the investigation. Within these areas, the investigation consisted of an examination of pertinent procedures and records, observations, and interviews with personnel. No items of noncompliance with NRC requirements were identified during the course of the investigation. In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed investigation report will be placed in the NRC's Public Document Room. If this report contains any information that you (or your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele- phone within ten (10) days from the date of this letter of your intention to file a request for withholding; and (b) submit within twenty-five (25) days from the date of this letter a written application to this office to withhold such information. If your receipt of this letter has been delayed such that less than seven (7) days are available for your review, please notify this office promptly so that a new due date may be established. Consistent with Section 2.790(b)(1), any such application must be accompanied by an affidavit executed by the owner of the information which identifies the document or part sought to be withheld, and which contains a full statement of the reasons which are the bases for the claim that the information should 8202050450 820115 PDR ADOCK 05000 g G n anO _TL I ,
--
. , e , The Cleveland Electric -2- Illuminating Company be withheld from public disclosure. This section further requires the state- ment to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought. to be withheld shall be incorporated as far as possible into a separate part of the affidavit. If we do not hear from you in this regard within the specified periods noted above, a copy of this letter and the enclosed Investigation report will be placed in the Public Document Room. We will gladdly discuss any questions you have concerning this investigation. Sincerely, R. F. Warnick, Director Enforcement and Investigation Staff Enclosure: Inspection Reports No. 50-440/81-18 and No. 50-441/81-18 cc w/ enc 1: DMB/ Document Cont.rol Desk (RIDS) Resident Inspector, RIII Harold W. Kohn, Powec Siting Commission l Daniel D. Wilt, Attorney Helen W. Evans, State of Ohio 1 l' , RII II RIII RIII RIII ON %T r- h % r-Streefer arn ck T . l . il ip/so H k ,ns McGregor " V y. M4 / gg j 1/6/82 t ! }}