ML20040E797

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-020/81-01,70-0089/81-01, 70-0095/81-01 & 70-0938/81-01 on 811028-29.No Noncompliance Noted
ML20040E797
Person / Time
Site: General Atomics, 07000938, MIT Nuclear Research Reactor, 07000089, 07000095
Issue date: 01/22/1982
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lisa Clark
MASSACHUSETTS INSTITUTE OF TECHNOLOGY, CAMBRIDGE
Shared Package
ML20040E798 List:
References
NUDOCS 8202050382
Download: ML20040E797 (2)


See also: IR 05000020/1981001

Text

V

.

e

@

/ q,

[f,d

2-

N 1982

EEWO

Docket No(s). 50-20; 71-89;

70-95; 7i-938

-

'

Cij

FEB

41982 * Q

{

'

Massachusetts Institute of Technology ]G ' tagfrgg;.a

Research Reactor

u

ATTN:

Mr. Lincoln Clark, Jr.

k

Director of Reactor Operations

0; /

e

138 Albany Street

N

Cambridge, Massachusetts

02139

Subject:

Combined Inspection Nos. 50-20/81-01; 70-89/81-01; 70-95/81-01; 70-

938/81-01

Gentlemen:

This refers to the routine safequards inspection conducted by Mr. P. H. Bissett

of this office on October 28-29, 1981 of activities authorized by NRC License

Nos. R-37, SNM-81, SNM-83, SNM-986 and to the discussions of our findings held

by Mr. Bissett with Mr. H. Bondar of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written applica-

tion to withhold information contained therein within thirty days of the date of

this letter.

Such application must be consistent with the requirements of

2.790(b)(1).

No reply to this letter is required. Your cooperation with us in this matter is

appreciated.

Sincerely,

/

/

W

/W

,

[

omasT. Martin [ Director

Division of Engineering and Technical

Inspection

s

-

A

/J

_/

3'

RI:DETIh}lld / h TI

fy I:DETI

BissettTpja

oyner

Martin

1/19/82

//v[PV

/[2][rt-

0FFICIAL RECORD COPY

1' b

1 \\

8202050382 820122

PDR ADOCK 05000020

k

0

PDR

J

m-

.

.

22 JAN B82

Massachusetts Institute of Technology

2

Enclosure:

1.

Combined Office of Inspection and Enforcement Inspection

Report Numbers 50-z0/81-01; 70-89/81-01; 70-95/81-01; 70-938/81-01

cc w/ encl:

Dr. O. K. Harling, Director of the Reactor Laboratory

Public Document Room (PDR)

Nuclear Safety Information Center (NSIC)

Commonwealth of Massachusetts (2)

Local Public Document Room (LPDR)

bcc w/ encl:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encis)

Director, DRPI

,

0FFICIAL RECORD COPY

w.

_

_.

Y