ML20040E775

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-460/81-11 on 811201-18.No Noncompliance Noted
ML20040E775
Person / Time
Site: Washington Public Power Supply System
Issue date: 01/20/1982
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Mazur D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20040E776 List:
References
NUDOCS 8202050344
Download: ML20040E775 (2)


See also: IR 05000460/1981011

Text

,

g

w

- -

lg

h.

(y

[

(

f.

.

.

e

JAN 2 0 1982

Docket No. 50-460

o

Q

Washington Public Power Supply System

G

g

P. O. Box %8

RECElygg

Richland, Washington 99352

gy

4198

1

Attention: Mr. D. W. Mazur

T s agj ,, ,25 }

Program Director

9-

T;GC

Gentlemen:

c,

p

4

&

Subject: NRC INSPECTION

This refers to the routine inspection conducted by Mr. A. Toth of this office

during December 1981, of activities authorized by NRC Construction Permit

No. CrPR-134, and to the discussion of his findings held by Mr. Toth with

Mr. Mazur and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and

observations by the inspector.

No items of noncompliance with NRC requirements were identified within the

scope of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days

of the date of this letter and submit written application to withhold information

contained therein within thirty days of the date c' this letter. Such application

must be consistent with the requirements of 2.790sb)(1).

8202050344 820120

PDR ADOCK 05000460

15 01

G

PDR

cmety

RV/d

Yg.pc

.Oly...

//

. .. ...

..

. ..

...... . .. ...

suamur)

TOTH

D0DDS

FAULKENERRY

j

/

DATEk

... . .... .. .

.. . ... ......... .

...... . . ... .

..... ............

.. ...............

.... .. . .. ... ..

.......

. . .

NRC FORM 318 (10,80) NRCM O240

OFFICIAL RECOFiD COPY

, USGC 1970--329 824

__ __-_____- _ - _ -___ -______ - _ _ _ _ _ _ _ . _ _ _ -

_ _ _ . _ - _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _

-- __-____ __ _ _______ _ _

_ _ _ _ - _ _

i

Washington Public Power Supply System

-2-

JAN 2 0 :1982

Should you have any questions concerning this' inspection, we will be glad

to discuss them with you.

,

Sincerely,

-

Orignal oiapedbt

T; toi Sisncp fc(' l

B.' H. Faulkenberry, Chief

Reactor Construction Projects Branch

-

Enclosure:

IE Inspection Report

No. 50-460/81-11'

cc w/o enclosure:

C.' W.' Edwards, Project Quality Assurance fianager

R. B. Glasscock, Quality Assurance Director

-

-

bcc: DMB/ Document Control Desk (RIDS)

Distributed by RV:

State of WA (Lewis)

LResident Inspector (4.)

RHE-(w/o enclosure). '

.

4

t

=

hN

Y

.