ML20040E775
| ML20040E775 | |
| Person / Time | |
|---|---|
| Site: | Washington Public Power Supply System |
| Issue date: | 01/20/1982 |
| From: | Faulkenberry B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Mazur D WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML20040E776 | List: |
| References | |
| NUDOCS 8202050344 | |
| Download: ML20040E775 (2) | |
See also: IR 05000460/1981011
Text
,
g
w
- -
lg
h.
(y
[
(
f.
.
.
e
JAN 2 0 1982
Docket No. 50-460
o
Q
Washington Public Power Supply System
G
g
P. O. Box %8
RECElygg
Richland, Washington 99352
gy
4198
1
Attention: Mr. D. W. Mazur
T s agj ,, ,25 }
Program Director
9-
T;GC
Gentlemen:
c,
p
4
&
Subject: NRC INSPECTION
This refers to the routine inspection conducted by Mr. A. Toth of this office
during December 1981, of activities authorized by NRC Construction Permit
No. CrPR-134, and to the discussion of his findings held by Mr. Toth with
Mr. Mazur and other members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and
observations by the inspector.
No items of noncompliance with NRC requirements were identified within the
scope of this inspection.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days
of the date of this letter and submit written application to withhold information
contained therein within thirty days of the date c' this letter. Such application
must be consistent with the requirements of 2.790sb)(1).
8202050344 820120
PDR ADOCK 05000460
15 01
G
cmety
RV/d
Yg.pc
.Oly...
//
. .. ...
..
. ..
...... . .. ...
suamur)
TOTH
D0DDS
FAULKENERRY
j
/
DATEk
... . .... .. .
.. . ... ......... .
...... . . ... .
..... ............
.. ...............
.... .. . .. ... ..
.......
. . .
NRC FORM 318 (10,80) NRCM O240
OFFICIAL RECOFiD COPY
, USGC 1970--329 824
__ __-_____- _ - _ -___ -______ - _ _ _ _ _ _ _ . _ _ _ -
_ _ _ . _ - _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _
-- __-____ __ _ _______ _ _
_ _ _ _ - _ _
i
Washington Public Power Supply System
-2-
JAN 2 0 :1982
Should you have any questions concerning this' inspection, we will be glad
to discuss them with you.
,
Sincerely,
-
Orignal oiapedbt
T; toi Sisncp fc(' l
B.' H. Faulkenberry, Chief
Reactor Construction Projects Branch
-
Enclosure:
IE Inspection Report
No. 50-460/81-11'
cc w/o enclosure:
C.' W.' Edwards, Project Quality Assurance fianager
R. B. Glasscock, Quality Assurance Director
-
-
bcc: DMB/ Document Control Desk (RIDS)
Distributed by RV:
State of WA (Lewis)
LResident Inspector (4.)
RHE-(w/o enclosure). '
.
4
t
=
hN
Y
.