Inservice Insp Rept for 810927-1101.Describes Eddy Current Exams Performed in Steam Generators 1,2,3 & 4
ML20040E716
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 01/27/1982
From:
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
Shared Package
ML20040E714 List:
References
NUDOCS 8202050277
Download: ML20040E716 (20)


Text

-

q

'u ; 6 I

I i

~

1 I

I STEAM GENERATOR TUBE INSPECTION REPORT J.

FOR 1981 REFUELING OUTAGE HADDAM NECK PLANT CONNECTICUT YANKEE ATOMIC POWER COMPANY Originator Date A ipwed by Date L DeLawre ce

.... + +

A 6

e Y

\\

8202050277 820127 PDR ADOCK 05000213 G

PDR

3

(-

e

'4 STEAM GENERATOR TUBE INSPECTION REPORT CONTENTS Page

^

1.0

SUMMARY

3 2.0 NUMBER AND EXTENT OF TUBES INSPECTED 4

3.0 LOCATION AND PERCENT DEGRADATION OF INDICATIONS 5

4.0 IDENTIFICATION OF TUBES PLUGGED 19 5.0 TOTAL TUBES PLUGGED TO DATE 20 G

,s-Page 2

\\

\\

e

(

+

STEAM GENERATOR TUBE INSPECTION REPORT 1.0

SUMMARY

1.1 The eddy current examination of steam generator tubing was performed between' September 27, 1981 and November 1, 1981. Eddy current examination was performed in steam generators 1,2,3, and 4.

The eddy current exam-ination was performed in accordance with USNRC Regula-tory Guide 1.83 and Haddam Neck Plant Technical Specification requirements.

1.2 The number of tubes inspected in each steam generator and the extent of the examination are shown in Section 2.0.

1.3 The location and percent degradation of indications are shown in Section 3.0.

1.4 The list of tubes plugged during this period are shown in Section 4.0.

It was necessary to plug tubes for wall thinning, denting and the attempted tube removal.

Tubes were plugged for wall thinning if the degradation was 50 percent or greater. Tubes were plugged for denting if they would not pass a 0.460 inch eddy current probe.

1.5 The total number of tubes plugged in each steam generator, including those identified in Section 4.0, is shown in Section 5.0.

@*M&M M M O

e

=

b Page 3

\\

s g-e 9-

=

e-.

m

_ r

9 t

-r-2.0 NUMBER AND EXTENT OF TUBES INSPECTED Number Tubes Inspected Extent of Steam Steam Steam Steam Examination Generator 1 Generator 2 Generator 3 Cenerator 4 Hot Leg 451 460 46 0

U-Bend 869 823 687 467 Full Length 50 50 48 50 TOTAL 1370 1333 781 717 Hot Leg: From the inlet.to above the fourth support plate.

U-Bend: From the inlet through the U-bend to below the fourth support plate on the cold leg side.

Full Lengthr From inlet to outlet.

Note: The steam generators at the Haddam Neck Plant have 3794 tubes each.

e Page 4 i

\\

L

,g, r -

3.0 LOCATION AND PERCENT DEGRADATION OF INDICATIONS 3.1 The location and percent degradation of all indications during the tube inspection of steam generators 1,2,3 and 4 are'shown on the following tables.

3.2 The abbreviations shown below apply to the tables:

A Above AVB Anti-Vibration Bar CL Cold Leg TS Tube Sheet TTS Top of Tube Sheet TSP Tube Support Plate 3.3 All dimensions are in inches.

For example, "5A2 TSP" means "Five inches above the number 2 tube support plate."

3.4 All indications refer to the hot leg unless otherwise indicated.

9 3

-~,

e em S

Page 5

\\

\\

t a

Steam Generator #1 Indication List (Sheet 1)

ROW COLUMN

^

DEG D ON 26 12 33 5A2 TSP 20 16 22 ATS 21 17 29 ATS 19 20 49 6A3 TSP 25 20 38 6A2 TSP 30 20 46 3A2 TSP 30 21 35 10A2 TSP 31 21 39 15A2 TSP 35 23 38 5A2 TSP 40 23 4 20 1AVB 30

' 24 46 SA2 TSP 35 24 44 4A2 TSP 29 25 42 3A2 TSP 30 25 4 20 7A2 TSP 31 25 4 20 SA2 TSP 38 25 33 1A3 TSP 37 26 29 31 27 41 12A2 TSP 36 27 38 A2 TSP 37 27 4 20 3AVB 30 28 37 12A2 TSP 32 28 43 13A2 TSP 34 29 33 15A2 TSP 29 34 3AVB 36 41 30 39 3A2 TSP 22 32 20 TTS 32 32 4 20 2hA2 TSP 42 32 4 20 1AVB 41 33 4 20 1AVB 41 33 20 4A2 TSP 15 34 29 4ATS 19 34 21 2ATS-CL 19 34 22 5ATS 24 34 4 20 7ATS 29 34

< 20 4ATS-CL 29 34

< 20 SATS 29 34 4 20 7ATS I

37 34

( 20 4A3 TSP 44 34

< 20 1AVB 46 34

<20 2 A2 TSP 46 34

< 20 5 ATS 45 35

< 20 SATS 45 36

< 20 1AVB i

45 36

< 20 2A2 TSP 31 21 33 4A2 TSP Page 6

\\

/

I Steam Generator 21 Indication List (Sheet 2)

R0W COLUMN

^

DEGR D, ON 45 36

(, 20 SATS 22 37 36 2A2 TSP 39 37 2 20 3AVB 39 37 47 2hA2 TSP 42 37

( 20 4AVB 42 37 51 3A2 TSP 19 38 4 20 2A2 TSP 20 38 4 20 1AVB 20 38 21 TTS 32 38

/ 20 2AVB 36 38 4 20 2AVB 37 38 4 20 1,2AVB 38 38

< 20 2AVB 39 38 21 2AVB 40 38

< 20 2,3AVB 45 38 28 2AVB 46 38 24 4AVB 46 38 21 2AVB 35 39 4 20 2AVB 39 39 4 20 3.AVB 40 39 4 20 4AVB 40 39 35 3AVB 40 39 31 2AVB 39 22 1AVB 40 41 39 4 20 2,4AVB 41 39 20 3AVB 44 39 25 2AVB 44 39 4 20 1AVB 46 39 21 1AVB 36 40 4 20 3AVB 39 40 4 20 1,3AVB 39 40

< 20 2A2 TSP 39 40

4. 20 TTS 41 40

< 20 1,4AVB 41 40 28 3AVB 41 40 36 14 A2 TSP 46 40 4 20 4AVB 47 40 4 20 3AVB 9

41

< 20 2 ATS 24 41 4 20 TTS 29 41 4 20 TTS-CL 35 41

( 20 3AVB 36 41

< 20 3AVB 39 41

< 20 3AVB 43 41 22 2AVB 43 41

< 20 1AVB 41 40 29 2AVB-Page 7

e.

Steam Cencrator Al Indication 1.ist (Sheet 3)

RO'4 COLUMN ATION DE AD, ON 46 41

( 20 1AVB 48 41 4 20 2.3,4 AVB 40 42 40 12A2 TSP k

40 42 52 14A2 TSP 46 42 4 20 1AVB 46 43 4 20 4AVB 48 43 4 20 1,2,3,'4 AVB 43

  • 44 4 20 2,4,1AVB 43 44 20 3AVB 41 45 30 10A3 TSP f

47 45 4 20 1ATS

-[

48 45 4 20 4AVB j

39 46 34 8A2 TSP 47 46 4 20 4,3,2,1AVB t

48 46 35 2AVB 37 47

( 20 3AVB l

39 47 32 A3 TSP 40 47 31 8A2 TSP 41 47 55 1A3 TSP 46 47 4 20 4AVB 46 47 30 3AVB 46 47 23 2AVB 46 47 32 1AVB 3

48 47 25 4AVB 48 47 28 3AVB 48

~

47 4 20 2AVB 13 48 4 20 2 BATS 39 48 40 12A2 TSP 40 48 43 10A2 TSP 47 48 4 20 4AVB 48' 48 30 2AVB 13 49 49 2 HATS 39 49 38 15A1 TSP 41 49

( 20 4AVB 41 49 23 2 TSP 48 49 21 4AVB 37 50 42 8A2 TSP 40 50 21 3AVB l.

40 50 4 20 1A1 TSP l

42 50 4 20 2AVB l

45 50 4 20 1ATS i

47 51 31 1AVB 47 51 23 2AVB 34 52 4 20 1AVB 36 52 4 20 10ATS l

37 52 24 ATS l

38 52 35 10ATS l

38 52 4 20 4AVB 43 52 30 4AVB 38 53 45 10A2 TSP l

l Page 8 s

l l

Ster. Generator '!! Indication List (Sheet 4)

R0W COLUMN OCATION DEC D ON 47 53 4 20 1AVB 43 54 44 7A2 TSP

~

34 55 22 HATS 44 56 22 4AVB 43 37 22 4AVB 44 59 23 4aVB 48 60 28 2AVB 48 60 4 20 3AVB 42 61 4 20 3,4 AVB 44 63 4 20 3AVB 45 63 4 20 1,2,3,4AVB 42 64

( 20 3,4AVB 42 64 21 2AVB 42 64 28 1AVB 46 64 4 20 4,3,1AVB 46 64 29 2AVB 36 65 4 20 2AVB 41 65 25 2AVB 45 65 4 20 1AVB 37 66 4 20 2,3 AVB 40 66 28 3AVB 44 6,6 42 3A2 TSP 43 67 L 20 3AVB 32 68 4 20 3A2 TSP 43 68 4 20 1,2,3,4AVB 44 68

/. 20 4AVB 44 68 21 2AVB 29 69 4 20 1ATS-CL 35 69 4 20 3,2AVB 40 69 32 3AVB 42 69 4 20 1,2,3AVB 43 69

< 20 2,3AVB 33 70

< 20 3AVB 43 70

( 20 4AVB 44 70 4 20 4AVB 42 71

'( 20 4AVB 72 31 2A2 TSP 38 40 72

< 20 2,3AVB

' ~ 4 2' 72 24 1AVB 43 72 20 4AVB 36 73 30 2AVB 41 73 28 4AVB 41 73 32 2AVB 42 73 27 4AVB 43 73 22 4AVB 43 73

( 20 2AVB 32 74

< 20 1,4 AVB 33 74 4 20 3AVB, 5A2 TSP 41 74 4 20 4AVB 42 74 25 4AVB 43 74 4 20 1,2AVB Page 9 I

k i

?

Steaci Cenerator #1 Indication I.ist (Sheet 5)

PERCEST ROW COLIDIN DEGRADATION LOCATION 31 75 4 20 6ATS 35 75 4 20 1AVB 36 75 62 5A2 TSP l

37 75 22 18A2 TSP 40 75 4 20 4AVB 41 75 4 20 4AVB 34 76 32 3AVB 39 76 4 20 4AVB 41 76 4 20 4AVB 34 77 4 20 3AVB 38 77 4 20 1AVB 38 77 4 20 hA2 TSP 36 78 22 2AVB 35 80 4 20 1,2AVB 34 81 25 4AVB 36 81 4 20 1,4AVB 31 B2 4.20 2ATS 14 83 37 2A3 TSP 36 84 4 20 27 A2 TSP 34 85 21 1AVB l

31 88 48

[

i f'

l o

e t

i Page 10 I

'\\

f I

k.

e Steam Cencrator #2 Indication List (Sheet 1)

PERCENT ROW COLUMN DEGRADATION LOCATION 11 6

48 3A3 TSP 5

12 25

~

TTS 10 12 40 TTS 10 15 22 1ATS 34 22

< 20 TTS 40 23 59 TTS 42 26 27 4AVB 34 32 A 20 HATS

-a 35 32 4,20 TTS 41 32 27 2A1 TSP 5

33

( 20 SATS 35 33 34 HATS 44 34 4'20 TTS 46 35 21

.3AVB 46 35 4.20 2AVB 38 37 21 ITSP 22 38 21 TTS 23 38 29 TTS 24 38 4 20 TTS 25 38 4 20 1ATS 45 38

( 20 3AVB 45 38 30 TTS 24 39 28 ATS 20 40 4 20 1ATS-CL 21 40 22 4ATS 24 40 23 2ATS 25 40 4 20 TTS 44 40 2 20 2AVB 47 42 4 20 3AVB 5

43 37 2,ATS 16 43 21 8ATS 20 43 e 20 6ATS

'25 43 4 20 TTS-CL 25 43 38 TTS 47 43 21 3AVB 48 43 4 20 1AVB 40 44 4 20 TTS 24 47 33 1ATS 22 TTS 27 47 30 47 23 2ATS-CL 35 47 4 20 1ATS-CL 37 47 40 TTS 31 49

( 20 1ATS 42 52 20 1 TSP 45 52 35 1 TSP 46 52

( 20 1 TSP 36 53 21 SA2 TSP 16 54 37 7 ATS 17 54 43 6ATS 20 54 22 1ATS-CL 20 54 32 7 ATS-CL Page 11 s

.4 Steam Generator l'2 Indication List' (Sheet 2)

PERCENT R0W COLUMN DECRADATION LOCATION

(

l 20 54 20 2ATS 1

25 54 4 20 2ATS-CL 30 54 29 2ATS-CL l

40 54 l.20 2ATS-CL 16 55 50 7 ATS 17 55 34 7 ATS i

23 55 33 HATS 16 56 29 8ATS 25 56 4 20 1ATS j

28 56 38 18A2 TSP 16 57 55 7ATS 26 57 62 3ATS 42 57 20 lATS 44 57 33 12A3 TSP l

42 58 4 20 ATS i

44 59 46 18A3 TSP 17 60 32 SATS 18 60 36 5ATS 44 60 57

'18A3 TSP i

5 61 4 20 3ATS i

6 61 30 TTS i

15 61 4 20 3AVB j

16 61 4 20 SATS I

17 61 30 SATS i

18 61

( 20 5ATS 25 61 4 20 2ATS-CL 25 61 4 20 ATS l

30 61 4 20 1ATS-CL 46 61

< 20 1,2AVB 38 62 58 10A2 TSP 42 63 35 1A3 TSP 46 63

( 20 20A2 TSP 44 64

< 20 4AVB j

45 64 35 1AVB 5

65

< 20 2BL4 TSP

{

6 65 24 1ATS 43 65 4 20 2AVB

{

46 65

4. 20 3AVB I

6__

66 30 1ATS 44 66

< 20 2AVB 44 66 34 1AVB 46 66 4 20 2AVB 45 67

< 20 3AVB 20 68 22 2AT,S-CL 20 68 32 TTS 25 68 4 20 1ATS-CL 30 68 20 1ATS-CL 33 68 21 1ATS

{

35 68 4 20 3AVB 35 68 39 4A2 TSP Page 12 l

b.

~s Steam Generator #2 Indication List (Sheet 3)

R0W COLUMN

^

DEGReiD T ON 37 68 22 3AVB 37 68 33 1A3 TSP 41 68 4 20 2AVB 43 68 27 3AVB 44 68 44 3AVB 34 69 4 20 2AVB 35 69 24 2hA2 TSP 36 69 58 2A3 TSP 42 69 33 1AVB 44 69

( 20 3AVB 35 70 4 20 2AVB 36 70 34 2AVB 37 70 4 20 2AVB 41 70 42 2AVB 44 70 4 20 1AVB 45 70 4 20 3,2,1AVB 37 71 27 3AVB 39 71 4 20 3AVB 44 71 24 3AVB 44 71 4 20 1AVB 22 72 4 20 TTS 38 72 25 3AVB 42 72 25 3AVB 43 72 34 3AVB 44 72 38 3AVB 15 73 4 20 TTS 22 73 4 20 31 HATS 25 73 4 20 1AlTSP 25 73 38 TTS 28 73 31 TTS 31 73 4 20 29ATS 31 73 4 20 SATS 34 73

' 20 1AVB 35 73 4 20 1AVB 37 73 24 1AVB 37 73 49 5A3 TSP 41 73 4 20 3AVB 37 74 (20 1AVB 39 74 49 3AVB 5

75

( 20 2ATS 12 75

( 20 2ATS 20 75

( 20 2ATS-CL 20 75 4 20 TTS 25 75 41 TTS 35 75 20 TTS 40 75 34 4AVB 37 76 4 20 1AVB 41 76 4 20 1AVB 11 77 L 20 1ATS 15 77 36 TTS Page 13

'.e Stean. Generator #2 Indication I.ist (Sheet 4)

ROW COLUFCi

^

DE ON 5

f' 22 77

( 20 1ATS 25 77 4 20 2ATS 27 77 4 20 TTS 28 77 4 20 2ATS 33 77

e. 20 2ATS 35 77 25

'2A3 TSP 38 77 30 1AVB 39 77 4 20 1AVB 33 78 44 17A3 TSP 34 78 54 9A3 TSP 39 78 49 2A3 TSP 39 78 4 20 4AVB 40 79 28 3AVB 15 80

(. 20 2ATS 21 80 41 TTS 22 80 33 IsATS 28 80 l 20 2A3 TSP 31 80 24 3AVB 33 80 4 20 TTS 36 82 25 3AVB 4 20 2ATS 21 83 31 83 34 2AVB 31 8-3 31 TTS 33 83

( 20 2A2 TSP 29 84 36 15A3 TSP 31 84 37 5A3 TSP 35 84 21 1AVB 36 84 4 20 1AVB 33 84 23 1AVB 15 86 4 20 2ATS 22 86 4 20 TTS 25 86 4 20 TTS 31 86 20 4AVB 31 86 20 1AVB 31 87 4 20 30A2TS?

33 87

< 20 4AVB 12 88 4 20 2ATS 28 88 30 3AVB

_29.

88 24 1AVB 30 88 4 20 4AVB 28 89 23 1AVB 29 89 23 1AVB 30 89 4 20 1AVB Page 14

+,

Steam Generator #3 Indication List (Sheet 1)

PERCENT ROW COLUMN DECRADATION LOCATION 18 19 29 TTS-CL 18 33 4 20 1ATTS 23 27 24 TTS-CL 23 33 4 20 TTS-CL 23 40

< 20 1ATTS 27 92 4 20 2AVB 28 89

< 20 2AVB 28 90

< 20 2AVB 29 89 4 20 2AVB 30 87 24 1AVB 31 65 4 20 3AVB 31 84 4 30 1AVB 31 85 4 ~30 1AVB

~

31 86 4 20 1AVB 32 83 4 30 1AVB 33 33 4 20 1ATTS 33

.53

< 30 4AVB 33 60 e 20 4AVB 33 86 4 20 2AVB 34 66 24 2AVB 34 83 4 20 1AVB 35 52 4 20 3AVB 35 52

< 20 2AVB 35 79

< 20 1AVB 35 82 4 20 2AVB 35 83 (20 1AVB 35 85 2 20 2AVB 38 71

< 20 2AVB 38 73 4 30 3AVB 38 75 4 30 4AVB 2'VB 38 81 4 20 A

39 60 4 20 4AVB 39 60

< 20 2AVB 39 62 4 20 4AVB 39 72

< 30 4AVB 39 79

< 20 3AVB 39 80

< 30 3AVB 40 65 4 20 4AVB 40 70 23 3AVB 40 71 4 20 3AVB 40 77

< 20 2AVB 40 79 e 20 1AVB 41 63 4 20 4AVB 41 65 31 4AVB 41 65 4 20 3AVB l

41 65 55 2AVB 41 65 27 1AVB 41 66 53 4AVB 41 66 44 3AVB Page 15 s

e,' l Steam Generator #3 Indication List (Sheet 2)

PERCENT ROW COLUMN DECRADATION LOCATION 41 66 43 2AVB 41 66 58 1AVB 41 73 4 30 3AVB 42 60

< 20 2AVB 42 62 4 20 2AVB 42 65 38 4AVB 42 65 4 20 3AVB 42 65 24 2AVB 42 65 29 1AVB 42 66 47 4AVB 42 66 4 20 3AVB 42 66 4 20 2AVB 42 66

~33 1AVB 42 73 L 20 3AVB 42 74 4 30 4AVB 43 63 4 20 3AVB 43

.63 4 20 2AVB 43 65 4 20 2AVB 46 63

( 20 2AVB

':7 60 4 20 4AVB 47 62 4 20 2AVB 47 63 4 20 2AVB 48 60 (30 1AVB 4

e Page 16

ye oar-7 Steam Generator 3!4 Indicat ion I.ist (Sheet 1)

PERCENT R0W COLUMN DEL.(ADATION LOCATION 20 44 42 ATS 47 46 L 20 1AVB 47 47 4 20 1AVB 20 48 46 TTS 37 49 4 20 2,3AVB 43 51 4 20 1,2,3AVB 17 52 36 5ATS 40 53 4 20 3AVB 40 53 22 2AVB 28 54 27 TTS-CL 41 54 4 20 2,3,4AVB 46 59 21 1AVB 46 60 4 20 1AVB 42 62 35 4AVB 42 62 28 2AVB 42 62 35 1AVB 40 63 (20 3AVB 45 63 4 20 3AVB 46 63 33 1AVB

.46 63

( 20 3AVB 41 64 (20 2AVB 43 64

( 20 3,4AVB 44 64 41 3AVB 46 64 25 1AVB 39 65 4 20 3AVB 40 65 4 20 3AVB 41 65

( 20 3AVB 43 65 23 3AVB 44 65 22 4AVB 44 65 46 3AVB 44 65 4 20 1AVB 45 65 4 20 4AVB 45 65 37 3AVB 46 65

< 20 1AVB 43 66 4 20 3,4AVB 44 66 4 20 3AVB 45 66 4 20 3AVB 43 67 4 20 3AVB 44 67 37 3AVB 45 67 29 3AVB 38 68 22 3AVB 41 68

'20 2AVB 40 69

( 20 3AVB 41 69 31 3AVB 41 69

< 20 1,2,4AVB 42 69 34 2AVB 43 69 22 2AVB' 41 70

< 20 4AVB 42 70

( 20 3AVB 26 72 22 ATS Page 17

is '

Stean Generator (!4 Indication List '(Shee t 2)

PERCEST R0W COLUMN DEGRADATION LOCATION 39 72 28 1AVB 39 72 30 2AVB 39 72 4 20 3AVB 41 72 4 20 3AVB 43 72 (20 3AVB 44 72 4 20 3AVB 33 75

( 20 3AVB 40 77

< 20 2AVB 41 77 4 20 2AVB 40 78

( 20 2AVB 35 84 4 20 1AVB 34 85 4.20 1AVB 34 85 4 20 1AVB 9

l i

e Page 18 i

~

ROW COCUMN REASON I

02 01 Restricts 0.460 inch probe 42 37 51 percent wall degradation 40 42 52 percent wall degradation 41 47 55 percent wall degradation 36 75 62 percent wall degradation Tubes Plugged in Steam Generator 2 4

ROW COLUMN REASON 44 60 57 percent wall degradation 34 78 54 percent wall degradation 40 23 59 percent wall degradation 16 55 50 percent wall degradation 16 57 55 percent wall degradation

]

36 69 58 percent wall degradation, 26 57 62 percent wall degradation 38 62 58 percent wall degradation 42 25 Restricts 0.460 inch probe 40 77 Restricts 0.460 inch probe 41 77 Restricts 0.460 inch probe 13 3

Identified Leaker 13 4

Identified Leaker 31 62 Attempted Tube Removal 31 61 Tube Removal Protective 31 63 Tube Removal Protective 30 62 Tube Removal Protective 32 62 Tub ~e Removal Protective i

i Tubes Plugged in Steam Generator 3 l

R0W COLUMN REASON i

41 65 55 percent wall degradation 41 66 58 percent wall degradation

(

l There were no tubes plugged in Steam Generator 4.

l l

Page 19 l

4' 6

5.0 TOTAL TUBES PLUGGED TO DATE Total Tubes Plugged to Date Steam Generator

  1. 1 8

Steam Generator

  1. 2 24 3

Steam Generator

  1. 3 17 Steam Generator
  1. 4 22 l

~

1 Total Tubes Plugged 77 i

1 i

)

l I

j.

Page 20 1-

\\